-30.39 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.

Appendix B. Technical Design Reviewing and Road Safety Audit Progresss September 2014. ‰ Amendment 9.7 6 126,219 Date 01-Feb-13 08-May-13 04-Apr-13 01-May-13 15-Jul-13 17-Sep-13 Amendment 20.9 7 83,752 Date 02-May-13 18-Jul-13 18-Sep-13 17-Sep-13 Amendment 19.5 7 184,714 Date 12-Aug-13 24-Oct-13 27-Sep-13 Amendment 46.8 7 161,963 Date 24-Jun-13 24-Oct-13 27-Sep-13 Amendment Date Amendment 61.7 7 252,629 Date 24-Jun-13 24-Oct-13 27-Sep-13 Amendment 50.1 6 224,090 Date 18-Mar-13 18-Jul-13 18-Sep-13 18-Jul-13 Amendment 55.2 7 316,306 Date 12-Aug-13 24-Oct-13 27-Sep-13 Amendment 56.3 7 287,549 Date 18-Mar-13 18-Jul-13 18-Sep-13 18-Jul-13 Amendment Date Amendment 36 7 353,956 Date 28-Mar-13 08-May-13 21-Aug-13 04-Apr-13 01-May-13 23-Sep-13 Amendment Date Amendment Date 26-May-13 Amendment Date Amendment 10.8 7 32,623 Date 02-May-13 18-Jul-13 18-Sep-13 17-Sep-13 Amendment Date Amendment Date Process 21 Lubuk Alung - Kuraitaji Link No. 027.0 Original 16.8 7 65,778 20 Lubuk Alung – Sicincin Link No.009.1 Original 14.6 7 54,557 Process 19 Lais - Bintuan Link No.009.1 Original 11.6 7 37,558 Process 95 Technical Review by CTC 70 Technical Review by DSC 100 Technical Review by PPC Processed by Project Preparation Consultant 18 Mukomuko – Bts.Sumbar Link No.015.3 Original 25.8 6 69,223 Process 15 Sibolga – Bts TapSel Link No.016.1 Original 36 7 129,228 Process 97 Technical Review by CTC AWP-3 14 Painan – Kambang Link No.017.1 Original 31.5 7 118,993 Process Processed by DSC 17 Sp.Gng Kemala–Pg.Tampak Link No.061.1 Original 36.8 6 104,238 Process 16 Seblat – Ipuh Link No.010.0 Original 34.5 6 110,237 Process 13 SP.Rukis - TJ.Kemuning Link No.006.0 Original 56.3 7 225,481.5 Process Technical Review by CTC 12 Kambang – Indrapura Link No.017.2 Original 55.2 7 171,948 Process 95 Technical Review by DSC 97 Technical Review by CTC 11 Bantal - Mukomuko Link No.015.2 Original 50.1 6 157,820 Process 97 Processed by DSC 10 Sp.Empat – Sp. Air Balam Link No.034.1 Original 61.7 7 241,617 Process 95 Technical Review by DSC Processed by DSC 95 Technical Review by DSC Processed by DSC 8 Bts.Pariaman – Manggopoh Link No.024.0 Original 46.8 7 183,268 Process 95 Technical Review by DSC Processed by DSC 97 Technical Review by CTC 6 PS.Pedati - Kerkap Link No.010.0 Original 25 7 72,019 Process 95 Technical Review by CTC AWP-2 5 Sp.Rampa – Poriaha Link No.015.xx Original 11.1 6 Estimated Cost Excl.VAT mil. RP Technical Design Review Process for Design Stage 55,126 Process 7 Indrapura – Tapan Link No.019.0 Original 19.5 7 96,921 Process 9 Rantau Tijang – Kota Agung Link No.026.1 Original 42 7 149,831 Process Approval By DTA Total Process Remark Status Received Datum Post-Review Site Visting Full-Review Group Pkg No. Name of Sub-project ECL Length km Width m RSA Audit Presentation Discussion Techinical Report Submission Quality Assurance