0.06 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.

30 September 2014 In USD Estimated Contractors or Total Est. Budget Starting Completion Consultants Man-Month WB + GOI Remarks Date Date Name Excl. the PIP Original Revised Physical Man-Month Physical Man-Month Physical Man-Month Supp. Staff USD, Excl.VAT Excl. VAT Excl. VAT MM MM MM 1 Betterment and Capacity 314,900,000.00 57,821,551.95 Expansion of National Roads 1.A AWP-1 ICB DGH 81,630,000.00 57,821,551.95 On - Going Construction 1.A1 Krui-Biha PT. Jaya Konstruksi 11,757,337.74 33.99

8.60 -30.39

1.A2 Pd. Sawah-Sp. Empat PT.Jaya Konstruksi 17,250,183.32 27.88

22.55 -5.33

1.A3 Manggopoh-Pd. Sawah PT. Jaya Konstruksi 12,522,493.13 21.53

12.43 -9.10

1.A4 Ipuh-Bantal PT. Waskita Karya 16,291,537.76 21.72

3.73 -16.35

1.B AWP-2 and AWP-3 ICB NCB DGH 227,100,000.00 Under Tendering Period : 1 Packages Bid Preparation : 3 Packages Pre-qualification : 3 Packages DED Road Safety Revision : 4 Packages 1.C Contingency - DGH 6,170,000.00 Detailed Engineering Design preparation : 6 Packages 2 Implementation Support 16,000,000.00 2.A Core Team Consultants CTC QCBS DGH 6-Nov-12 15-Feb-16 PT. Perentjana Djaja 556 5,000,000.00 1,276,700.00 1,315,925.00 38.301 212.95 33.804 187.95 -4.496 25.00 Supporting PMU. Joint Venture with Rp21,415,400,000.00 Rp22,426,175.00 Yongma Engineering Co.Ltd. Or US equivalent total : Amandement PT. Epadascon Permata 3,512,681.91 3,641,077.48 2.B Design Superv. Consultants QCBS DGH 19-Jun-13 18-Nov-16 Renardet S.A. 1,068 10,000,000.00 820,600.00 3.964 42.33 3.402 36.33 -0.562 -6.00 Design preparation package 7, 8, 10 and 12. Joint Venture with Rp51,818,705,000.00 PT Cipta Strada Or US equivalent total : PT. Daya Creasi Mitrayasa 6,465,729.72 PT. Seecons PT. Yodya Karya 2.C Incremental Operating Cost Varies PMU 1,000,000.00 Including Technical Audits 3 Road Sector Institutional 1,000,000.00 Development 3.A Capacity Building for NCB DGH 350,000.00 Preparation of TOR. Disaster Risks Reduction 3.B Capacity Building for NCB DGH 350,000.00 Preparation of TOR. Environmental Management 3.C Capacity Building for NCB DGH 300,000.00 Preparation of TOR. Road Safety 4 Contingency for Disaster DGH - Risk Response 5 Unallocated DGH 18,100,000.00 Total 350,000,000.00 67,799,963.58 0.450 212.95 0.395 187.95 -0.054 -25.00 PROGRESS Respon- sibility Contract ValueBudget Total WB + GOI Appendix - A OVERALL PROGRESS STATUS Description WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP IBRD LOAN No. 8043-ID Proc. Method Category Planned Actual Balance Western I ndonesia National Roads I mprovement Project v ww x yz {| } ~{ €  ‚ ƒ „x … {  y † ‡ ˆ  ‡ x…… Appendix B. Technical Design Reviewing and Road Safety Audit Progresss September 2014. ‰ Amendment 9.7 6 126,219 Date 01-Feb-13 08-May-13 04-Apr-13 01-May-13 15-Jul-13 17-Sep-13 Amendment 20.9 7 83,752 Date 02-May-13 18-Jul-13 18-Sep-13 17-Sep-13 Amendment 19.5 7 184,714 Date 12-Aug-13 24-Oct-13 27-Sep-13 Amendment 46.8 7 161,963 Date 24-Jun-13 24-Oct-13 27-Sep-13 Amendment Date Amendment 61.7 7 252,629 Date 24-Jun-13 24-Oct-13 27-Sep-13 Amendment 50.1 6 224,090 Date 18-Mar-13 18-Jul-13 18-Sep-13 18-Jul-13 Amendment 55.2 7 316,306 Date 12-Aug-13 24-Oct-13 27-Sep-13 Amendment 56.3 7 287,549 Date 18-Mar-13 18-Jul-13 18-Sep-13 18-Jul-13 Amendment Date Amendment 36 7 353,956 Date 28-Mar-13 08-May-13 21-Aug-13 04-Apr-13 01-May-13 23-Sep-13 Amendment Date Amendment Date 26-May-13 Amendment Date Amendment 10.8 7 32,623 Date 02-May-13 18-Jul-13 18-Sep-13 17-Sep-13 Amendment Date Amendment Date Process 21 Lubuk Alung - Kuraitaji Link No. 027.0 Original 16.8 7 65,778 20 Lubuk Alung – Sicincin Link No.009.1 Original 14.6 7 54,557 Process 19 Lais - Bintuan Link No.009.1 Original 11.6 7 37,558 Process 95 Technical Review by CTC 70 Technical Review by DSC 100 Technical Review by PPC Processed by Project Preparation Consultant 18 Mukomuko – Bts.Sumbar Link No.015.3 Original 25.8 6 69,223 Process 15 Sibolga – Bts TapSel Link No.016.1 Original 36 7 129,228 Process 97 Technical Review by CTC AWP-3 14 Painan – Kambang Link No.017.1 Original 31.5 7 118,993 Process Processed by DSC 17 Sp.Gng Kemala–Pg.Tampak Link No.061.1 Original 36.8 6 104,238 Process 16 Seblat – Ipuh Link No.010.0 Original 34.5 6 110,237 Process 13 SP.Rukis - TJ.Kemuning Link No.006.0 Original 56.3 7 225,481.5 Process Technical Review by CTC 12 Kambang – Indrapura Link No.017.2 Original 55.2 7 171,948 Process 95 Technical Review by DSC 97 Technical Review by CTC 11 Bantal - Mukomuko Link No.015.2 Original 50.1 6 157,820 Process 97 Processed by DSC 10 Sp.Empat – Sp. Air Balam Link No.034.1 Original 61.7 7 241,617 Process 95 Technical Review by DSC Processed by DSC 95 Technical Review by DSC Processed by DSC 8 Bts.Pariaman – Manggopoh Link No.024.0 Original 46.8 7 183,268 Process 95 Technical Review by DSC Processed by DSC 97 Technical Review by CTC 6 PS.Pedati - Kerkap Link No.010.0 Original 25 7 72,019 Process 95 Technical Review by CTC AWP-2 5 Sp.Rampa – Poriaha Link No.015.xx Original 11.1 6 Estimated Cost Excl.VAT mil. RP Technical Design Review Process for Design Stage 55,126 Process 7 Indrapura – Tapan Link No.019.0 Original 19.5 7 96,921 Process 9 Rantau Tijang – Kota Agung Link No.026.1 Original 42 7 149,831 Process Approval By DTA Total Process Remark Status Received Datum Post-Review Site Visting Full-Review Group Pkg No. Name of Sub-project ECL Length km Width m RSA Audit Presentation Discussion Techinical Report Submission Quality Assurance