1.58 1.10 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
7.59 0.56
0.01 0.56
0.59 II D r a i n a g e12.26 -
0.03 0.03 4.68 III Earthworks3.58 0.03
- 0.03 0.77 IV Pavement Widening Shoulders3.39 -
- - - V Granular Pavement 18.070.21 0.56
0.77 4.92
VI Asphalt Pavement49.27 -
- - 3.27 VII S t r u c t u r e s2.55 -
- - 1.16 VIII Reinstatement Minor Works2.95 0.06
- 0.06 0.30 IX Day Work0.14 -
- - 0.06 X Routine Maintenance Works0.20 0.01
0.00 0.01
0.08 TOTAL
100.00 0.870.59 1.46
15.81 Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original 0.11 0.32 0.75 1.14 6.57 10.29 12.85 15.81 21.72 25.43 32.76 40.88 47.93 55.61 63.45 70.19 77.04 81.55 84.79 90.84 94.62 97.05 98.80 100.00 Actual Progress - 0.18 0.40 0.53 0.56 0.78 0.87 1.45 Balance 0.11 0.14 0.35 0.61 6.01 9.51 11.98 14.36 PHYSICAL PROGRESS MONITORING TABLE PHYSICAL WORK PROGRESS BY CATEGORY Div Description - Late of Field Engineering Decision - DSC and Contractor to discuss with PPK 186,936,750,000.00 regarding the finalization of the Field Engineering. DISBURSEMENT 23-May-14 17,385,117,750.00 - The contractor have to add manpower aspecialy 10-Jan-14 resources to undertake the needed acceleration for drainage work 9-Jan-16 of works. EXECUTIVE SUMMARY REPORT Aug- 14 PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS 2014 2015 04 T IM E August 25, 2014 IPUH - BANTAL MAJOR PROBLEMS ACTION TO BE TAKEN A M O U N T - The Contractor has not started works as per the - The contractor have to started the main work approved schedule such as drainage works RENARDET S.A JV - Insufficient manpower, equipment and financial 10 20 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 P H Y S IC A L P R O G R E S THE MONTH OF TIME FOR COMPLATION PROGRESS SCHEDULE PACKAGE 04 Schedule Actual ANEXES EXECUTIVE SUMMARY REPORT edit 9 Sep 2014_517530 ExSum P-4Parts
» WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Package 17 Sp. Gunung Kemala Package 11 Bantal
» Package 13 Sp. Rukis Procurement
» Packages 5 Simpang Rampa Procurement
» Visit Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 8.60 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 22.55 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 12.43 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» - 16.35 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14
» Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Draw Downs and Future Costs Disbursement Management Information System
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» Rebuild The New File Storage Server 1 Background
» 2.35 0.22 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.84 - - 0.57 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.09 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 5.99 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 1.59 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 3.74 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 1.58 1.10 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.47 - WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 3.47 0.88 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 13.85 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.56 - WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.03 - - - WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.06 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» -30.39 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» -5.33 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
Show more