5.3.2. Database
Incoming and Outgoing Data Administrator Saved Stored Inputted File Storage Server Shelves Database Application Soft File Hard Copy Data Information Typical Workflow of Database Management A typical workflow in management of incoming and outgoing data is divided into 3 types of data handling, below: 1. Hardcopy, the document is stored in a rack. 2. Soft files, saved in the File Storage Server. 3. Data information, inputted in database applications. For further handling that needs to be made an integrated database management system so that all data can be stored properly. The database system has been prepared to store all of WINRIP project information in a systematic, easily traceable, maintainable, and manageable format as outlined below with the following systems: Monthly Progress Report September 2014 Western I ndonesia National Roads I mprovement Project 42 a. File Storage Server, used to stored all files of reports and other documents. Please check the URL address http:storage.winrip-ibrd.com . b. Letter Database System, used to record all information of incoming and outgoing letter. c. Document Library System, used to record all information of hard copy documents then store it into library shelves.Parts
» WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Package 17 Sp. Gunung Kemala Package 11 Bantal
» Package 13 Sp. Rukis Procurement
» Packages 5 Simpang Rampa Procurement
» Visit Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 8.60 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 22.55 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 12.43 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» - 16.35 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14
» Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» Draw Downs and Future Costs Disbursement Management Information System
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» Rebuild The New File Storage Server 1 Background
» 2.35 0.22 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.84 - - 0.57 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.09 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 5.99 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 1.59 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 3.74 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 1.58 1.10 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.47 - WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 3.47 0.88 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 13.85 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.56 - WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.03 - - - WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» 0.06 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» -30.39 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.
» -5.33 WINRIP DOC MPR CTC MPR No.21 2014 09 2014 09 11 00224.