Biaya dibayar dimuka dan uang muka Prepayments and advances Aset tetap Fixed assets

PT Vale Indonesia Tbk PT Vale Indonesia Tbk 30 Juni 2015 dan 2014 dan 31 Desember 2014 June 30, 2015 and 2014 and December 31, 2014 25 8. Persediaan 8. Inventories 30 JuniJune 30 2015 2014 31 DesemberDecember 31 Dalam ribuan Dolar AS US Dollars, in thousands Nikel Nickel Dalam proses 33,559 35,836 In process Barang jadi 15,105 16,034 Finished 48,664 51,870 Bahan pembantu 77,495 90,525 Supplies Dikurangi: Penyisihan untuk bahan pembantu usang 3,108 3,108 Less: Provision for obsolete supplies 74,387 87,417 Jumlah 123,051 139,287 Total Mutasi penyisihan bahan pembantu usang adalah sebagai berikut: Movement in the provision for obsolete supplies is as follows: 30 JuniJune 30 2015 2014 31 DesemberDecember 31 Dalam ribuan Dolar AS US Dollars, in thousands Saldo awal – 1 Januari 3,108 2,224 Beginning balance – January 1 Penyisihan untuk bahan pembantu usang - 884 Provision for obsolete supplies Saldo akhir 3,108 3,108 Ending balance Manajemen Perseroan yakin bahwa penyisihan untuk bahan pembantu usang telah mencukupi terhadap kemungkinan kerugian yang timbul dari bahan pembantu usang. Tidak ada persediaan yang dijaminkan pada tanggal 30 Juni 2015 31 Desember 2014: nihil. The Company’s management believes that the provision for obsolete supplies is adequate to cover possible losses from obsolete supplies. There were no inventories pledged as collateral as at June 30, 2015 December 31, 2014: nil. Biaya persediaan yang diakui sebagai beban dan termasuk dalam “beban pokok pendapatan” sebesar AS328 juta 30 Juni 2014: AS361 juta nilai penuh. The cost of inventories recognized and included in “cost of revenue” amounted to US328 million June 30, 2014: US361 million full amount. Pada tanggal 30 Juni 2015, semua aset Perseroan termasuk persediaan telah diasuransikan terhadap risiko kerugian atau kerusakan yang disebabkan oleh semua risiko industri berikut, tapi tidak terbatas pada gempa bumi, kebakaran, kerusakan mekanis atau elektris dan termasuk gangguan usaha lainnya. Jumlah pertanggungan untuk aset Perseroan dan eksposur atas risiko gangguan usaha terkait per 30 Juni 2015 adalah AS6.499 juta 31 Desember 2014: AS6.235 juta, dengan batasan sebesar AS800 juta per kejadian 31 Desember 2014: AS800 juta nilai penuh. Bahan pembantu diasuransikan sebesar biaya penggantian, nikel dalam proses sebesar biaya bahan baku bijih dan tenaga kerja ditambah proporsi tertentu atas biaya tidak langsung, sedangkan untuk barang jadi nikel dalam matte sebesar mana yang lebih tinggi antara harga jual tunai bersih atau biaya memproduksinya kembali. Menurut pendapat manajemen, pertanggungan asuransi telah memadai untuk menutupi kerugian yang mungkin timbul dari risiko-risiko tersebut. As at June 30, 2015, all of the Company’s assets including inventories were insured against the risk of direct physical loss or damage caused by industrial all risks, including but not limited to earthquake, fire and electrical or mechanical breakdown and including related business interruption. The total insured value of the Company’s assets and related business interruption exposure as at June 30, 2015 was US6,499 million December 31, 2014: US6,235 million, with policy limits of US800 million per occurrence December 31, 2014: US800 million full amount. Supplies are insured at replacement cost, nickel in process at the cost of ore raw materials and labor expended plus a proper proportion of overhead charges, while nickel in matte finished goods are insured at the regular net cash selling price or at reproduction cost, whichever is higher. In management’s opinion, the insurance is adequate to cover possible losses from such risks. 9. Biaya dibayar dimuka dan uang muka 9. Prepayments and advances 30 JuniJune 30 2015 2014 31 DesemberDecember 31 Dalam ribuan Dolar AS US Dollars, in thousands Uang muka ke kontraktor dan pemasok 1,122 2,356 Advance to contractors and suppliers Asuransi dibayar dimuka 502 3,389 Prepaid insurance Lainnya 237 - Others Jumlah 1,861 5,745 Total PT Vale Indonesia Tbk PT Vale Indonesia Tbk 30 Juni 2015 dan 2014 dan 31 Desember 2014 June 30, 2015 and 2014 and December 31, 2014 26 10. Aset tetap 10. Fixed assets Transfer dan 1 Januari Penambahan reklasifikasi Pengurangan 30 Juni January 1, 2015 Additions Transfers and Disposals June 30, 2015 reclassifications Dalam ribuan Dolar AS US Dollars, in thousands Harga perolehan Cost Pemilikan langsung Direct ownership Bangunan bendungan dan Hydroelectric dam buildings fasilitas PLTA 927,983 - - - 927,983 and facilities Jalan dan jembatan 62,600 - 54 - 62,546 Roads and bridges Bangunan 617,030 - 2,053 - 619,083 Buildings Pabrik dan mesin 1,483,846 - 34,742 - 1,518,588 Plant and machinery Perabotan dan peralatan kantor 33,674 - 1 - 33,675 Furniture and office equipment Pengembangan tambang 29,672 - - - 29,672 Mine development Aset tetap dalam penyelesaian 160,717 56,457 36,742 - 180,432 Construction in progress Jumlah 3,315,522 56,457 - - 3,371,979 Total Akumulasi penyusutan Accumulated depreciation Pemilikan langsung Direct ownership Bangunan bendungan dan Hydroelectric dam buildings fasilitas PLTA 290,388 12,781 - - 303,169 and facilities Jalan dan jembatan 23,330 1,969 7 - 25,292 Roads and bridges Bangunan 426,954 8,599 - - 435,553 Buildings Pabrik dan mesin 920,233 36,486 7 956,726 Plant and machinery Perabotan dan peralatan kantor 32,659 109 - - 32,768 Furniture and office equipment Pengembangan tambang 13,435 853 - - 14,288 Mine development Jumlah 1,706,999 60,797 - - 1,767,796 Total Nilai buku bersih 1,608,523 1,604,183 Net book value Lihat Catatan 11 untuk rincian aset tetap dalam penyelesaian. Refer to Note 11 for details of construction in progress. PT Vale Indonesia Tbk PT Vale Indonesia Tbk 30 Juni 2015 dan 2014 dan 31 Desember 2014 June 30, 2015 and 2014 and December 31, 2014 27 10. Aset tetap lanjutan 10. Fixed assets continued