Biaya Tetap Upah Tenaga Kerja

145 Tahun No Uraian 1 2 3 4 5 6 7 8 9 10 Sekrup 7 cm 1,800,000 1,800,000 2,070,000 2,070,000 2,380,500 2,380,500 2,737,575 2,737,575 3,148,211.25 3,148,211.25 Sekrup 3 cm 1,800,000 1,800,000 2,070,000 2,070,000 2,380,500 2,380,500 2,737,575 2,737,575 3,148,211.25 3,148,211.25 Pendil 15,000,000 15,000,000 17,250,000 17,250,000 19,837,500 19,837,500 22,813,125 22,813,125 26,235,093.75 26,235,093.75 Gerabah luar 22,500,000 22,500,000 25,875,000 25,875,000 29,756,250 29,756,250 34,219,687.50 34,219,687.50 39,352,640.63 39,352,640.63 Sekam 2,250,000 2,250,000 2,587,500 2,587,500 2,975,625 2,975,625 3,421,968.75 3,421,968.75 3,935,264.06 3,935,264.06 Karung 1,500,000 1,500,000 1,725,000 1,725,000 1,983,750 1,983,750 2,281,312.50 2,281,312.50 2,623,509.38 2,623,509.38 Abu Gosok 1,476,000 1,476,000 1,697,400 1,697,400 1,952,010 1,952,010 2,244,811.50 2,244,811.50 2,581,533.23 2,581,533.23 Plastik 36,900 36,900 42,435 42,435 48,800.25 48,800.25 56,120.29 56,120.29 64,538.33 64,538.33 Total Biaya Variabel 96,984,900 96,984,900 111,532,635 111,532,635 128,262,530.25 128,262,530.25 147,501,909.79 147,501,909.79 169,627,196.26 169,627,196.26

b. Biaya Tetap Upah Tenaga Kerja

Tetap 21,000,000 21,000,000 24,600,000 24,600,000 28,200,000 28,200,000 31,800,000 31,800,000 35,400,000 35,400,000 Upah Tenaga Kerja Harian 18,000,000 18,000,000 22,500,000 22,500,000 27,000,000 27,000,000 31,500,000 31,500,000 36,000,000 36,000,000 Listrik 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 Air 2,400,000 2,400,000 2,400,000 2,400,000 2,400,000 2,400,000 2,400,000 2,400,000 2,400,000 2,400,000 Transportasi 5,500,000 5,500,000 5,500,000 5,500,000 5,500,000 5,500,000 5,500,000 5,500,000 5,500,000 5,500,000 Telekomunikasi 4,800,000 4,800,000 4,800,000 4,800,000 4,800,000 4,800,000 4,800,000 4,800,000 4,800,000 4,800,000 Biaya pemeliharaan investasi 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 Promosi 18,000,000 18,000,000 14,400,000 14,400,000 11,520,000 11,520,000 9,216,000 9,216,000 7,372,800 7,372,800 PBB 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 146 Tahun No Uraian 1 2 3 4 5 6 7 8 9 10 Total Biaya Tetap 74,050,000 74,050,000 78,550,000 78,550,000 83,770,000 83,770,000 89,566,000 89,566,000 95,822,800 95,822,800 Total Biaya Operasional 171,034,900 171,034,900 190,082,635 190,082,635 212,032,530.25 212,032,530.25 237,067,909.79 237,067,909.79 265,449,996.26 265,449,996.26 Pajak Penghasilan 493,226.70 493,226.70 1,400,233.20 1,400,233.20 2,438,790.68 2,438,790.68 3,653,831.77 3,653,831.77 5,137,983.55 5,137,983.55 Total Outflow 287,262,126.70 173,447,126.70 195,046,868.20 199,471,868.20 218,035,320.93 219,990,320.93 250,355,741.56 242,640,741.56 274,151,979.80 278,576,979.80 Net Benefit 99,810,126.70 14,004,873.30 20,522,931.80 16,097,931.80 29,869,949.08 27,914,949.08 34,735,318.94 42,450,318.94 53,702,739.77 93,324,405.77 DR 6.75 0.94 0.88 0.82 0.77 0.72 0.68 0.63 0.59 0.56 0.52 Present Value 93,498,947.73 12,289,760.42 16,870,802.87 12,396,484.69 21,547,409.42 18,863,815.40 21,988,525.37 25,173,168.80 29,832,214.26 48,564,217.60 PV Positif 207,526,398.83 PV Negatif 93,498,947.73 NPV 114,027,451.10 IRR 23.36 Net BC 2.22 PBP 6.52 147 Lampiran 10. Cashflow Analisis Finansial Pada Usaha Tungku Sekam HEMAT Skenario Usaha II Tahun No Uraian 1 2 3 4 5 6 7 8 9 10 A Inflow 1. Penjualan Tungku Sekam HEMAT 172,500,000 172,500,000 200,100,000 200,100,000 232,116,000 232,116,000 269,254,560 269,254,560 312,335,289.60 312,335,289.60 2. Penjualan Sekam 4,500,000 4,500,000 5,220,000 5,220,000 6,055,200 6,055,200 7,024,032 7,024,032 8,147,877.12 8,147,877.12 3. Abu gosok 2,952,000 2,952,000 3,424,320 3,424,320 3,972,211.20 3,972,211.20 4,607,764.99 4,607,764.99 5,345,007.39 5,345,007.39 4. Nilai Sisa 44,046,666 Total Penerimaan 179,952,000 179,952,000 208,744,320 208,744,320 242,143,411.20 242,143,411.20 280,886,356.99 280,886,356.99 325,828,174.11 369,874,840.11 B Outflow 1. Biaya Investasi Perizinan 2,500,000 Lahan 200 m2 40,000,000 Bangunan 60,000,000 Mesin las 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 Kawat las 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 Bor 400,000 400,000 400,000 400,000 Mata bor 884,000 884,000 884,000 884,000 884,000 884,000 884,000 884,000 884,000 884,000 Tang Ripet 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 Kacamata 40,000 40,000 40,000 40,000 Gunting seng 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 148 Tahun No Uraian 1 2 3 4 5 6 7 8 9 10 Palu 25,000 125,000 125,000 125,000 125,000 125,000 125,000 125,000 125,000 125,000 Tang 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 Paku 12 cm 15,000 15,000 15,000 15,000 15,000 Meteran 30,000 30,000 30,000 30,000 30,000 Jangka besi 30,000 30,000 30,000 30,000 Gagang gergaji 100,000 100,000 100,000 100,000 100,000 Bongkahan besi 100,000 100,000 Penjepit behel 1,000,000 1,000,000 Tiang 5,000,000 5,000,000 5,000,000 5,000,000 Gurinda Listrik 600,000 600,000 600,000 600,000 Timbangan 2,500,000 2,500,000 Mata besi 520,000 520,000 520,000 520,000 520,000 520,000 520,000 520,000 520,000 520,000 Total biaya investasi 115,734,000 1,919,000 3,564,000 7,989,000 3,564,000 5,519,000 9,634,000 1,919,000 3,564,000 7,989,000

2. Biaya Operasional

a. Biaya Variabel Seng 32,934,000 32,934,000 38,203,440 38,203,440 44,315,990.40 44,315,990.40 51,406,548.86 51,406,548.86 59,631,596.68 59,631,596.68 Besi 10,938,000 10,938,000 12,688,080 12,688,080 14,718,172.80 14,718,172.80 17,073,080.45 17,073,080.45 19,804,773.32 19,804,773.32 Plat strip 2 cm 3,150,000 3,150,000 3,654,000 3,654,000 4,238,640 4,238,640 4,916,822.40 4,916,822.40 5,703,513.98 5,703,513.98 Plat strip 3 cm 3,600,000 3,600,000 4,176,000 4,176,000 4,844,160 4,844,160 5,619,225.60 5,619,225.60 6,518,301.70 6,518,301.70 149 Tahun No Uraian 1 2 3 4 5 6 7 8 9 10 Sekrup 7 cm 1,800,000 1,800,000 2,088,000 2,088,000 2,422,080 2,422,080 2,809,612.80 2,809,612.80 3,259,150.85 3,259,150.85 Sekrup 3 cm 1,800,000 1,800,000 2,088,000 2,088,000 2,422,080 2,422,080 2,809,612.80 2,809,612.80 3,259,150.85 3,259,150.85 Pendil 15,000,000 15,000,000 17,400,000 17,400,000 20,184,000 20,184,000 23,413,440 23,413,440 27,159,590.40 27,159,590.40 Kaleng Cat 15,000,000 15,000,000 17,400,000 17,400,000 20,184,000 20,184,000 23,413,440 23,413,440 27,159,590.40 27,159,590.40 Sekam 2,250,000 2,250,000 2,610,000 2,610,000 3,027,600 3,027,600 3,512,016 3,512,016 4,073,938.56 4,073,938.56 Karung 1,500,000 1,500,000 1,740,000 1,740,000 2,018,400 2,018,400 2,341,344 2,341,344 2,715,959.04 2,715,959.04 Abu Gosok 1,476,000 1,476,000 1,712,160 1,712,160 1,986,105.60 1,986,105.60 2,303,882.50 2,303,882.50 2,672,503.70 2,672,503.70 Plastik 36,900 36,900 42,804 42,804 49,652.64 49,652.64 57,597.06 57,597.06 66,812.59 66,812.59 Total Biaya Variabel 89,484,900 89,484,900 103,802,484 103,802,484 120,410,881.44 120,410,881.44 139,676,622.47 139,676,622.47 162,024,882.07 162,024,882.07

b. Biaya Tetap Upah Tenaga Kerja

Dokumen yang terkait

Analisis kelayakan finansial dan kesempatan kerja pada usahatani pepaya (studi kasus di Kebun Percobaan Cikarawang, Desa Cikarawang, Kecamatan Dramaga, Kabupaten Bogor, Provinsi Jawa Barat)

0 16 129

Analisis Tingkat Partisipasi dan Loyalitas Anggota Pada Kelompok Tani Hurip Dengan Pendekatan Participatory Action Research /PAR (Kasus Kelompok Tani Hurip, Desa Cikarawang, Kecamatan Dramaga, Kabupaten Bogor)

0 8 10

Studi kelayakan pendirian usaha penggilingan gabah di desa Cikarawang, kecamatan Dramaga, kabupaten Bogor

1 24 267

Studi kelayakan bisnis tanaman buah jambu kristal pada kelompok tani desa Cikarawang, Kecamatan Dramaga Kabupaten Bogor

9 47 64

Faktor-faktor yang mempengaruhi produksi ubi jalar: studi kasus Kelompok Tani Hurip, Desa Cikarawang Kecamatan Darmaga Kabupaten Bogor

10 37 93

Analisis kelayakan finansial usaha pupuk kompos (Studi Kasus : Kelompok Tani Hurip, Desa Cikarawang, Kecamatan Dramaga, Kabupaten Bogor, Jawa Barat)

2 12 227

Kelayakan Usaha Pembesaran Itik Pedaging (Studi Kasus pada Peternakan Maju Bersama, Desa Cikarawang, Kecamatan Dramaga, Kabupaten Bogor, Jawa Barat)

5 55 317

Keanekaragaman Jenis Kelelawar di Desa Cikarawang Kecamatan Dramaga Kabupaten Bogor Provinsi Jawa Barat

0 3 24

Analisis Pemasaran Ubi Jalar (Studi Kasus: Kelompok Tani Hurip, Desa Cikarawang, Kecamatan Dramaga, Kabupaten Bogor)

9 46 125

Partisipasi Dan Perubahan Perilaku Anggota Kelompok Wanita Tani Di Desa Cikarawang, Kecamatan Dramaga, Kabupaten Bogor.

0 2 1