Aset Lainnya Other Assets Utang Usaha Trade Payables
262
Laporan Tahunan 2011 PT Vale Indonesia Tbk
Catatan atas Laporan Keuangan Notes to the Financial Statements
PT Vale Indonesia Tbk sebelumnya PT International Nickel Indonesia Tbk PT Vale Indonesia Tbk formerly PT International Nickel Indonesia Tbk
31 Desember 2011 dan 2010 December 31, 2011 and 2010
11. Aset Tetap dalam Penyelesaian 11. Construction in Progress
Aset tetap dalam penyelesaian terdiri dari proyek yang belum selesai pada tanggal laporan posisi keuangan.
Construction in progress represents capital projects that have not been completed at the statements of financial position dates.
Aset tetap dalam penyelesaian terdiri dari: The construction in progress is as follows:
Perkiraan waktu penyelesaian
penyelesaian Estimated
31 Desember 2011
of completion completion date
December 31 Dalam ribuan Dolar AS
US Dollars, in thousands Pemutakhiran Reaktor Tanur Listrik No. 2
42,018 99
2012 Rebuild Implementation Furnace No. 2
Konversi Batubara Tahap I 29,020
49 2013
Coal Conversion Phase I Reaktor Tanur Listrik No. 4
15,520 83
2012 Adaptive reactor Furnace No. 4
Pemutakhiran Pembangkit Listrik Larona Unit 2 14,805
81 2012
Larona Unit 2 Generator Upgrade Pemutakhiran Pembangkit Listrik Larona Unit 1
12,933 71
2012 Larona Unit 1 Generator Upgrade
Lainnya di bawah AS10.000 90,940
– –
Others below US10,000 Jumlah
205,236 Total
Perkiraan waktu penyelesaian
penyelesaian Estimated
31 Desember 2010
of completion completion date
December 31 Dalam ribuan Dolar AS
US Dollars, in thousands Proyek Pembangkit Listrik Tenaga Air Karebbe
315,823 78
2011 Karebbe Hydroelectric Project
Konversi Batubara Tahap I 17,461
30 2011
Coal Conversion Phase 1 Pemutakhiran Pembangkit Listrik Larona Unit 2
13,696 75
2011 Larona Unit 2 Generator Upgrade
Pemutakhiran Pembangkit Listrik Larona Unit 1 12,820
70 2011
Larona Unit 1 Generator Upgrade Reaktor Tanur Listrik No. 4
12,747 79
2011 Adaptive reactor Furnace No. 4
Lainnya di bawah AS10.000 58,298
– –
Others below US10,000 Jumlah
430,845 Total
Biaya pinjaman untuk tahun yang berakhir pada tanggal 31 Desember 2011 sebesar AS10,3 juta 31 Desember 2010: AS7,5 juta yang timbul
dari pembiayaan untuk pembangunan Proyek Karebbe, dikapitalisasi pada periode yang bersangkutan. Tingkat kapitalisasi yang digunakan
adalah 1,74 31 Desember 2010: 1,88, angka ini mencerminkan biaya pinjaman yang digunakan untuk membiayai proyek tersebut. Sejak
bulan awal Nopember 2011 biaya pinjaman untuk Proyek Karebbe tidak lagi dikapitalisasi karena proyek ini telah siap digunakan.
For the year ended December 31, 2011, borrowing costs of US10.3 million December 31, 2010: US7.5 million arising from financing for
the Karebbe Project, were capitalized. The capitalization rate of 1.74 December 31, 2010: 1.88 was used, representing the borrowing
cost of the loan used to finance the project. From the beginning of November 2011 the borrowing costs for the Karebbe Project were no
longer capitalized as the project was ready for use.
12. Aset Lainnya 12. Other Assets
31 Desember 2011
2010 December 31
Dalam ribuan Dolar AS US Dollars, in thousands
Pinjaman kepada karyawan – jangka panjang 15,605
12,821 Loans to employees – long-term
Lainnya 102
- Others
Jumlah 15,707
12,821 Total
Lihat Catatan 30e iii untuk rincian saldo dan transaksi dengan pihak yang berelasi.
Refer to Note 30e iii for details of related party balances and transactions.
PT Vale Indonesia Tbk 2011 Annual Report
263
Catatan atas Laporan Keuangan Notes to the Financial Statements
PT Vale Indonesia Tbk sebelumnya PT International Nickel Indonesia Tbk PT Vale Indonesia Tbk formerly PT International Nickel Indonesia Tbk
31 Desember 2011 dan 2010 December 31, 2011 and 2010
13. Utang Usaha 13. Trade Payables
31 Desember 2011
2010 December 31
Dalam ribuan Dolar AS US Dollars, in thousands
Pihak-pihak yang berelasi Related parties
Dalam mata uang Dolar AS 6,410
7,184 Denominated in US Dollars
Dalam mata uang Yen Jepang 17
- Denominated in Japanese Yen
Dalam mata uang Dolar Kanada -
1,372 Denominated in Canadian Dollars
6,427 8,556
Pihak ketiga Third parties
Dalam mata uang Dolar AS 60,656
28,913 Denominated in US Dollars
Dalam mata uang Rupiah 11,708
2,327 Denominated in Rupiah
Dalam mata uang Dolar Singapura 2,419
414 Denominated in Singapore Dollars
Dalam mata uang Dolar Australia 1,285
- Denominated in Australian Dollars
Dalam mata uang lainnya di bawah AS1.000 1,656
1,210 Denominated in other currencies below US1,000
77,724 32,864
Jumlah 84,151
41,420 Total
Utang usaha timbul dari pembelian barang dan jasa. Semua jumlah yang disebutkan di atas adalah lancar sesuai dengan ketentuan pembayaran
seperti yang tertuang dalam perjanjian yang bersangkutan. Rincian pemasok dengan saldo melebihi 10 dari total utang usaha,
selain saldo pihak yang berelasi yang dijelaskan di Catatan 30f adalah sebagai berikut:
The trade payables arose from the purchase of goods and services. All amounts are current within the payment terms as set out in the relevant
agreement. Details of suppliers that make up more than 10 of the trade payables
balance, other than related party balances disclosed in Note 30f, are: 31 Desember
2011 2010
December 31 Dalam ribuan Dolar AS
US Dollars, in thousands Pihak ketiga
Third parties Kuo Oil S Pte Ltd.
12,821 9,190
Kuo Oil S Pte Ltd. Tidak ada jaminan yang diberikan oleh Perseroan atas utang usahanya
pada tanggal 31 Desember 2011. There were no guarantees made by the Company for its payables as of
December 31, 2011.
14. Perpajakan 14. Taxation