DSC Consultants WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
4.1 Detailed Design Preparation
Final Engineering Designs, Engineer s Estimates and bidding documents have been completed for all projects proposed for WP-1. WP-2 nine subprojects and WP-3 eight subprojects will be designed by DSC and the construction supervision of all the works programs will be performed by the same DSC team. In parallel with the instruction to speed up the process, detailed engineering design DED of some subprojects of WP-2 and WP-3 were prepared and completed by respective P2JN. The CTC has been instructed by DGH to review the DED of seven packages completed by the P2JNs package 5, 6, 11, 13, 15, 17 and 19. To date, detailed engineering design for fifteen 15 sub-projects has been completed, four 4 are under preparation and detailed design works of two 2 sub-projects are still pending due to proposal to replace the two 2 originally listed packages. As previously reported in previous Monthly Progress Report of October 2014, the detailed engineering design of four 4 sub-projects were required for further design revision due to considerable cost of implementing the works. During this reporting month, BALAI II Padang completed and approved the revised drawings and revised cost estimates of the four 4 sub-projects which were submitted to PMU for further review. Based on the submitted revised drawings, CTC conducted the final review with respect to highway engineering and road safety audit wherein detailed report for each of the four 4 sub-project drawings were prepared and forwarded to PMU. The final detailed engineering design drawings for the four 4 sub-project that were finalized by BALAI II and reviewed by CTC are follows : • Package 7 : Indrapura Tapan • Package 8 : Bts. Pariaman Manggopoh • Package 10 : Sp. Empat Sp. Air Balam • Package 12 : Kambang Indrapura With regards to the preparation of the other four 4 drawings, hereunder are the current status. • Package No. 14 : Painan Kambang Still under preparation by DSC • Package No. 16 : Seblat Ipuh CTC have already conducted the design and road safety review. Per information from DSC, the drawings are ready for submittal to BALAI II. CTC nedd to conduct final review and back checking to assure that CTC s comments were incorporated in the final design. • Package No. 20 : Lubuk Alung SicincinParts
» WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Visit WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Package 17 Sp. Gunung Kemala
» Package 11 Bantal Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package 13 Sp. Rukis Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No.19 Lais Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No. 15 Sibolga Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 12.62 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 31.45 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 19.21 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» - 24.66 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5 Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14 Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» Management Information System WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Project Risks and Mitigation Measures
» Current Situation Actions Required
» 2.35 0.22 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.84 - - 0.57 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.09 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 5.99 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 1.59 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 3.74 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 1.58 1.10 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.47 - WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 3.47 0.88 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 13.85 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.56 - WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.03 - - - WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.06 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» -39.91 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» -7.36 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
Show more