Package 17 Sp. Gunung Kemala
5. Package No. 6 Pasar Pedati
Kerkap AWP-2 This sub-project is under implementation schedule AWP-2. The project roadline is located in the Province of Bengkulu having an approximate length of 20.90 . The Contract Package is to be procured thru the National Competitive Bidding NCB as an agreement between MPW and World Bank concerning three 3 issues on Model Bidding Document for Procurement of Works were already settled. During this period, the bidding documents intended to be used on this Contract Package has been finalized with the incorporation of all the agreements reached during the recently concluded meeting. As the bidding documents has been finalized for e-procurement system of procuring the works, the Invitation to Bid was uploaded on the website on November 24, 2014. A pre-bid conferencemeeting and site visit are scheduled on December 5, 2014 with bid opening to be on December 18, 2014 in Bengkulu. At the end of this month November 2014, fourty six 46 Contractors have registered to participate in the bidding.6. Package No.19 Lais
Bintunan AWP-3 This sub-project is under implementation schedule AWP-3. The project roadline is located in the Province of Bengkulu having an approximate length of 10.80 kilometers. The Contract Package is to be procured thru the National Competitive Bidding NCB as an agreement between MPW and World Bank concerning three 3 issues on Model Bidding Document for Procurement of Works were already settled. During this period, the bidding documents intended to be used on this Contract Package has been finalized with the incorporation of all the agreements reached during the recently concluded meeting. As the bidding documents has been finalized for e-procurement system of procuring the works, the Invitation to Bid was uploaded on the website on November 24, 2014. A pre-bid conferencemeeting and site visit are scheduled on December 5, 2014 with bid opening to be on December 18, 2014 in Bengkulu. At the end of this month November 2014, thirty nine 39 Contractors have registered to participate in the bidding. Procurement of Other Civil Work Contract Packages The present status of other Contract Packages which are about to be put on tender are as follow :1. Package No. 15 Sibolga
Batas Tapsel AWP-3 This sub-project is included in the implementation schedule AWP-3. The project road is 36 kilometer long and located in the Province of Sumatera Utara. The Bank agreed on DGH to pilot the use of MPW s full e-procurement system, using the World Bank ICB Standard Bidding Documents SBD for procurement of works after incorporating in the ICB bidding documents for this package the changes required for use e-procurement system. The bidding documents are on-going finalization. It is expected that DGH can invite bids within this coming month of December 2014.Parts
» WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Visit WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Package 17 Sp. Gunung Kemala
» Package 11 Bantal Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package 13 Sp. Rukis Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No.19 Lais Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No. 15 Sibolga Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 12.62 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 31.45 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 19.21 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» - 24.66 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5 Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14 Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» Management Information System WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Project Risks and Mitigation Measures
» Current Situation Actions Required
» 2.35 0.22 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.84 - - 0.57 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.09 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 5.99 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 1.59 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 3.74 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 1.58 1.10 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.47 - WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 3.47 0.88 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 13.85 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.56 - WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.03 - - - WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.06 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» -39.91 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» -7.36 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
Show more