Implementation Support Components WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.

Western I ndonesia National Roads I mprovement Project 53 • Capacity Building of Disaster Risks Reduction • Capacity Building for Environmental Management • Capacity Building for Road Safety Terms of Reference for Capacity Building of Disaster Risk Reduction has been finalized and agreed between TLKJ and World Bank. Standard Bidding Documents SBD for ICB full e-procurement method is under final preparation. Consultants for the other two 2 Technical Assistance are still to be procured.

6.3 TRAINING TO SUPPORT PROJECT IMPLEMENTATION

The work during this reporting month is actually inseparable continuation of what were prepared and done during previous month October 2014 summarized below: • Continuing to assist PMU in the actions of perfecting the PMM document to be ready for further socializationdissemination. • Preparation and Carrying out the Financial Management and Reporting IFR training in November 2014 prospective participants, venue, training materials, correspondences, etc. . • Preparation of other training programs procurement training, environmental and social training, implementation of PMM training urgently needed in line with the physical progress of the project. The work during this reporting month was then focused on the following activities:

6.3.1 Updating the Project Management Manual PMM

• A copy of the Project Management Manual PMM was submitted to the PMU on October 21, 20`14, after all the inputs, comments and suggestions were incorporated in the proposed revised Manual. Awaiting for the PMM being signed by the Director General of Highways, and prior to the delivery of regular PMM Application Training for all parties involved in WINRIP implementation, CTC plans to propose to the PMU, to firstly deliver the PMM for Contractors and Consultants personnel prior to their mobilization and before they come and start working in the respective packages. A proposal is going to be prepared.

6.3.2 Annual Training Program

 Preparation of Financial Management Reporting esp. IFR training for 4 packages of AWP-1 has been continued and planned to be delivered in this month.  Some hotel in Padang were identified and contacted. One of them was selected and booked. Unfortunately, it must then be cancelled, since the Director General of Highways then announced the new policy of the government, that from now on it will be no official meetingworkshop held in hotel. Western I ndonesia National Roads I mprovement Project 54  Preparation of training materials and methods to be used.  The IFR Training was then conducted in two 2 effective days: Wednesday 26 November 2014 to Thursday 27 November 2014. For the venue, we then use the meeting room of Balai Besar Pelaksanaan Jalan Nasional BBPJN II Padang, Jl. Jati No. 109 Padang.  The training was officially opened by the Head of Administrative Division of BBPJN II Padang, Ir. Djoko Prijanto Agung Pribadi, MT.  The training was attended by nineteen 19 persons of twenty-four 24 persons invited 79,2 of target rate as shown in the following table: IFR Training Participants No Groups of Participants Invited Attending Remarks A Province: WST SUMATERA 1 Treasurer Financial Staffs of Sastker PJN I 3 3 2 Treasurer Financial Staffs of Sastker PJN II 3 3 3 PPK 09 Administrative + Financial Staffs 3 3 4 PPK 10 Administrative + Financial Staffs 3 3 5 BBPJN II Padang - 3 Sub-Total WEST SUMATERA 12 15 B Province: BENGKULU : 1. Treasurer Financial Staffs of Sastker PJN I 3 3 2 PPK 09 Administrative + Financial Staffs 3 -- Sub-Total of BENGKULU : 6 3 C Province: LAMPUNG: 1 Treasurer Financial Staffs of Sastker PJN I 3 1 2 PPK 09 Administrative + Financial Staffs 3 -- Sub-Total of LAMPUNG : 6 1 T O T A L 24 19 Notes: ~ Lampung could only send one 1 person from Satker and none from PPK. ~ Bengkulu could send three 3 persons from Satker, none from PPK . ~ West Sumatera could allow all twelve 12 persons who wee invited, from 2 Satkers and 2 PPK. Moreover, BBPJN II Padang assigned their three 3 financial staffs to participate the training.  At the meeting with the Officials of BBPJN II Padang, the Head of Admin. Division as well as the Financial Section Head said that actually they need to include 3 of their financial staff to join in the training, based on their experience since in last audit by BPK, when they were asked also about the IFR by the BPK, while nobody of them had been trained or experienced to do it..  Complying with the objectives of the training, the methodological approach was stressed on minimizing lecture and maximizing exercise and practice session. The first day of the course was for introducing IFR, explaining the standard forms to be used and how to use. It was then continued with exercise: filling out the forms, computerized, with the data from the Facilitator. Western I ndonesia National Roads I mprovement Project 55  On the second day, the participants were guided to prepare IFR by filling out the appropriate form, computerized, with the real data of their own project. The Facilitator check the work of each participant, one by one, giving instruction, suggestion and guidance, until they were all able to prepare the IFR correctly.  Almost all of the attendances of this training have been working in financial and reporting matters. They were patiently and diligently following all sessions. The Facilitator facilitated the learning process properly. Cooperation between the Facilitator and the participants were very good. The training was, therefore, going along smoothly, and the Facilitator found at the end of the session, that all participants worked correctly in preparing IFR.  The training was officially closed at 15.45 by the CTC Financial Specialist, Mr. Y.D. Tarwanto, on behalf of the OIC of PMU, Ir. Agusta E. Sinulingga, MT, who was still busy and unable to leave the meeting with the Inspectorate General in other meeting room of BBPJN II Padang

6.3.3 Activities Plan for next month December 2014

• Continuing to assist PMU in preparing further socializationdissemination of the PMM when it has been officially approvedsigned by the World Bank and the Director General of Highways. • Preparing and scheduling the next Financial Management and Reporting IFR trainings next year 2015: packages PPK involved prospective participants, venue, training materials, correspondences, etc. • Preparing and carrying out proposed special PMM Application Training for Contractors and Consultants staffs prior to their mobilization to the respective packages. • Preparation of other training programs urgently needed in line with the physical progress of the project.

6.4 Anti Corruption Issues

6.4.1 Anti-Corruption Action Plan ACAP

The main duties of the Community Development Officer are implementation of Anti-Corruption Measures, and Monitoring their Effectiveness. Provide assistance as required with the establishment of anti-corruption measures necessary to support the project and monitor and report their