0.09 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
11.20 - Late of Field Engineering Decision
- DSC and Contractor to discuss with PPK Contract Amount Add-1 + PPN Include advance payment regarding the finalization of the Field Engineering. Comp Accum Actual Accum Accum Total Last this to this Sch to this Month Month Month Month I G e n e r a l10.21 1.35
0.01 1.36
3.40 II D r a i n a g e13.17 1.10
0.07 1.17
6.17 III Earthworks3.04 2.51
0.08 2.59
1.29 IV Pavement Widening Shoulders2.45 -
- - - V Granular Pavement 11.270.80 0.07
0.87 1.77
VI Asphalt Pavement55.81 -
- - 0.50 VII S t r u c t u r e s0.80 0.36
0.14 0.50
0.57 VIII Reinstatement Minor Works2.27 0.56
0.44 1.00
0.12 IX Day Work0.22 0.03
0.00 0.03
0.07 X Routine Maintenance Works0.76 0.38
0.01 0.39
0.38 TOTAL
100.00 7.080.83 7.91
14.27 Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original 0.26 1.00 1.67 2.45 4.78 7.45 10.70 14.27 21.53 30.10 36.95 44.01 51.62 58.67 65.63 73.03 79.97 87.04 91.61 93.19 94.30 95.76 97.82 100.00 Actual Progress 0.24 0.48 2.07 2.43 2.87 5.45 5.70 7.01 Balance 0.02 0.52 0.40 0.02 1.91 2.00 5.00 7.26 PHYSICAL PROGRESS MONITORING TABLE 143,688,963,000.00 PHYSICAL WORK PROGRESS BY CATEGORY Div Description RENARDET S.A JV - Delayed decision of the design of concrete pile - DSC and Contractor has discussed with PPK regar- DISBURSEMENT 6-Jan-14 retaining wall ding the finalization of the design and the 5-Jan-16 method of construction of precast retaining wall. cial resource to excecute the available works for drainage work EXECUTIVE SUMMARY REPORT Aug-14 PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS 2014 2015 30-Jun-14 16,091,601,613.00 03 T IM E August 25, 2014 MANGGOPOH - PADANG SAWAH MAJOR PROBLEMS ACTION TO BE TAKEN - Delayed of additional land acquisition - PPK should coordinate with respective agency A M O U N T - Contractor has insufficient manpower and finan- - The contractor have to add manpower aspecialy 10 20 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 P H Y S IC A L P R O G R E S THE MONTH OF TIME FOR COMPLATION PROGRESS SCHEDULE PACKAGE 03 Schedule Actual ANEXES EXECUTIVE SUMMARY REPORT edit 9 Sep 2014_1E982A ExSum P-3Parts
» WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Visit WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Package 17 Sp. Gunung Kemala
» Package 11 Bantal Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package 13 Sp. Rukis Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No.19 Lais Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Package No. 15 Sibolga Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 12.62 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 31.45 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 19.21 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» - 24.66 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5 Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14 Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» Management Information System WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» Project Risks and Mitigation Measures
» Current Situation Actions Required
» 2.35 0.22 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.84 - - 0.57 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.09 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 5.99 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 1.59 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 3.74 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 1.58 1.10 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.47 - WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 3.47 0.88 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 13.85 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.56 - WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.03 - - - WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» 0.06 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» -39.91 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
» -7.36 WINRIP DOC MPR CTC MPR No.23 2014 11 2014 11 11 00224.
Show more