CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI 30 Juni 2011 Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain ____________________________________________________ PT KRAKATAU STEEL PERSERO Tbk NOTE TO THE CONSOLIDATED FINANCIAL STATEMENTS June 30, 2011 Expressed in millions of Rupiah, unless otherwise stated _________________________________________________ 52

12. ASET TETAP lanjutan Revitalisasi pabrik DR

Pabrik pembuatan besi spons “Direct Reduction, DR” Perusahaan terdiri dari fasilitas reduksi langsung berbasis gas alam. Proyek revitalisasi pabrik DR meliputi modifikasi teknologi HYL III menjadi Zero Reformer dan peningkatan kapasitas produksi dari 1,5 juta ton tidak diaudit besi spons direct reduced iron menjadi 1,74 juta ton tidak diaudit besi spons per tahun. Berkaitan dengan proyek revitalisasi ini, Perusahaan telah menandatangani perjanjian lisensi dan bantuan teknis dengan HYLSA, S.A de C.V dan kontrak pekerjaan Migration Automation System of HYL III dengan PT Honeywell Indonesia. Pada tanggal 30 Juni 2011, manajemen Perusahaan memperkirakan persentase penyelesaian revitalisasi pabrik DR ditinjau dari aspek keuangan adalah sebesar 33,36. Proyek direncanakan selesai pada bulan Januari 2012. Pembangunan pabrik besi Perusahaan, melalui PT MJIS, tengah membangun fasilitas pembuatan besi spons iron making di Batulicin, Kalimantan Selatan. Fasilitas tersebut akan menggunakan biji besi lokal dengan teknologi berbasis batubara untuk mendukung upaya Perusahaan dalam mengurangi ketergantungan terhadap impor biji besi. Fasilitas tersebut direncakan memiliki kapasitas produksi sebesar 315.000 ton besi spons per tahun. Pada tanggal 30 Juni 2011, manajemen PT MJIS memperkirakan persentase penyelesaian proyek ini ditinjau dari aspek keuangan adalah sebesar 92,67 yang diperkirakan akan beroperasi pada bulan Agustus 2011.

12. FIXED ASSETS continued DR plant revitalization

The Company‟s sponge iron manufacturing Direct Reduction, DR facility consists of natural gas- based direct reduction plant. DR plant revitalization project includes the modification of HYL III technology to Zero Reformer and the expansion of production capacity from 1.5 million metric tons unaudited of sponge iron direct reduced iron to 1.74 million metric tons unaudited of sponge iron per year. In relation to this revitalization project, the Company has signed a license agreement and technical assistance with HYLSA, S.A de C.V and a work contract of Migration Automation System of HYL III with PT Honeywell Indonesia. As of June 30, 2011, the Companys management estimates that the percentage of completion of DR plant revitalization in financial terms is 33,36. The project is expected to be completed in January 2012. Ironmaking plant The Company, through PT MJIS, is constructing an ironmaking facility in Batulicin, South Kalimantan. The facility will utilize local iron ore with coal-based technology to support the Company‟s effort to reduce its dependency on imported iron ore. The facility is planned to have a production capacity of 315,000 metric tons of sponge iron per year. As of June 30, 2011, the management of PT MJIS estimates the percentage of completion of this project in financial terms is 92.67, which is expected to operate in August 2011. Aset tidak digunakan dalam operasi terdiri dari : Assets not used in operations consist of: 30062011 31122010 Tanah 21.135 22.686 Land Bangunan 4.240 3.352 Building Mesin - 1.791 Machine Suku cadang utama insurance spare 2.199 3.348 Primary spare parts insurance spare Jumlah 27.574 31.177 Total Tanah, bangunan, mesin dan peralatan pabrik tertentu milik Perusahaan dan Anak Perusahaan tertentu digunakan sebagai jaminan atas fasilitas pinjaman yang diperoleh dari kreditur Catatan 15 dan 22. Certain Company‟s and Subsidiaries land, buildings, machines and equipments are plagged as collateral on creditor loan facility. Notes 15 and 22. CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI 30 Juni 2011 Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain ____________________________________________________ PT KRAKATAU STEEL PERSERO Tbk NOTE TO THE CONSOLIDATED FINANCIAL STATEMENTS June 30, 2011 Expressed in millions of Rupiah, unless otherwise stated _________________________________________________ 53

12. ASET TETAP lanjutan