Mesin bor Mesin kompresor Mesin amplas Mesin paku ripet Mesin penembak paku Meja Kantor Kursi meja kantor Sofa Lemari arsip Lemari aksesoris Laptop Alat Pembersih Megateak 120x240 Melamin putih 120x240 38,800,000 Cet 38,800,000 lem putih lem kuning 69,840

6 2 Lampiran 3. Daftar indeks harga item untuk pengembanngan usaha TCF Furnitur NO I T E M TAHUN ANALISA PROYEK JUM- STN 1 2 3 4 5 LAH A. BAHAN BAKU : a. Megateak 120x240 RpLbr 85,000 85,000 85,000 85,000 85,000 425,000

b. Melamin putih 120x240

RpLbr 50,000 50,000 50,000 50,000 50,000 250,000

c. Triplek 12mm , 120x240

RpLbr 150,000 150,000 150,000 150,000 150,000 750,000

d. Cet

RpKg 50,000 50,000 50,000 50,000 50,000 250,000

e. Thinner

RpKg 80,000 80,000 80,000 80,000 80,000 400,000

f. lem putih

RpKg 10,000 10,000 10,000 10,000 10,000 50,000

g. lem kuning

RpKg 60,000 60,000 60,000 60,000 60,000 300,000

h. Paku

RpKg 22,000 22,000 22,000 22,000 22,000 110,000

i. Scrup

RpKg 30,000 30,000 30,000 30,000 30,000 150,000

B. TENAGA KERJA LANGSUNG TUKANG KAYU

RpProd 450,000 450,000 450,000 450,000 450,000 2,250,000

C. TANAH DAN BANGUNAN

Rpm3 1,500,000 1,500,000

D. PERALATAN PERLENGKAPAN :

1 PERALATAN ; a. Mesin pemotong kayu RpUnit 500,000 500,000 1,000,000

b. Mesin bor

RpUnit 350,000 350,000

c. Mesin kompresor

RpUnit 130,000 130,000

d. Mesin amplas

RpUnit 300,000 300,000 600,000

e. Mesin paku ripet

RpUnit 175,000 175,000 350,000

f. Mesin penembak paku

RpUnit 150,000 150,000 300,000 6 3 Lanjutan Lampiran 3. NO I T E M TAHUN ANALISA PROYEK JUM- STN 1 2 3 4 5 LAH 2 PERLENGKAPAN :

a. Meja Kantor

RpBh 1,000,000 1,000,000

b. Kursi meja kantor

RpBh 350,000 350,000

c. Sofa

RpBh 750,000 750,000

d. Lemari arsip

RpBh 1,250,000 1,250,000

e. Lemari aksesoris

RpBh 1,000,000 1,000,000

f. Laptop

RpBh 6,000,000 6,000,000

g. Alat Pembersih

RpSet 100,000 100,000 100,000 100,000 100,000 100,000 600,000

E. LAIN - LAIN :

1 Mobil pick up RpUnit 110,000,000 110,000,000 2 Motor RpUnit 12,000,000 12,000,000

F. TENAGA KERJA :

1 Pemilik RpThn 48,000,000 48,000,000 48,000,000 48,000,000 48,000,000 240,000,000 2 Karyawan tetap RpThn 9,600,000 9,600,000 9,600,000 9,600,000 9,600,000 48,000,000 6 4 Lampiran 4. Rencana anggaran biaya pengembangan usaha TCF Furnitur NO I T E M TAHUN ANALISA PROYEK JUM- 1 2 3 4 5 LAH

A. BAHAN BAKU :

a. Megateak 120x240

32,980,000 37,910,000 43,180,000 48,960,000 48,960,000 211,990,000

b. Melamin putih 120x240 38,800,000

44,600,000 50,800,000 57,600,000 57,600,000 249,400,000 c. Triplek 12mm , 120x240 57,600,000 66,900,000 76,200,000 86,400,000 86,400,000 373,500,000

d. Cet 38,800,000

44,600,000 50,800,000 57,600,000 57,600,000 249,400,000 e. Thinner 62,080,000 71,360,000 81,280,000 92,160,000 92,160,000 399,040,000

f. lem putih

3,840,000 4,460,000 5,080,000 5,760,000 5,760,000 24,900,000

g. lem kuning 69,840,000

80,280,000 91,440,000 103,680,000 103,680,000 448,920,000

h. Paku 2,134,000

2,453,000 2,794,000 3,168,000 3,168,000 13,717,000 i. Scrup 2,910,000 3,345,000 3,810,000 4,320,000 4,320,000 18,705,000 B. TENAGA KERJA LANGSUNG TUKANG KAYU 174,600,000 200,700,000 228,600,000 259,200,000 259,200,000 1,122,300,000 C. TANAH DAN BANGUNAN 120,000,000 120,000,000 D. PERALATAN PERLENGKAPAN : 1 PERALATAN ;

a. Mesin pemotong kayu