Western Indonesia National Roads Improvement Project 12
Position MM
Name Assignment
Time Used to End of
February
2014 Contract
Time Remaining
Start End
Specialist 26
YD Tarwanto Oct-2013
Nov-2015 4.97
21.03 Environmental
Specialist 30
Leti Hermawati Dec-2012
Jun-2015 14.43
15.57 Social Impact
Specialist 36
M. Sutopo Nov-2012
Oct-2015 11.33
24.67 26
Witono Sept-13
Nov-2015 5.93
20.07 Procurement
Specialist-1 12
Darmansiri -
- -
12.00 12
Muhdi -
- -
- Procurement
Specialist-2 12
Rudi Rungkat Nov-2012
Mar-2013 4.10
- 17
M. Edi Fachri Mar-2013
Aug-2014 11.17
5. 83 Management
Information Specialist 30
Agung Lukito -
- -
30.00 25
Sony Thamrin May-2013
Apr-2015 9.97
15.03 Community
Development Officer 36
Yakobus Jan-2013
Dec-2015 13.90
22.10 Notes: : Resigned : Not yet mobilized
= Amandment No. 1
As of end of this reporting month, the International experts Senior Highway Engineer and Senior Road Safety Audit Engineer have already consumed the man-mos allocation in the
Original Contract and Amendment No.1. DGH requested them to continue their assignment and have to be accommodated in the contract amendment No.2 for extended period.
In parallel with the instruction to speed up the process, detailed engineering design DED of some subprojects of WP-2 and WP-3 were prepared and completed by respective P2JN.
The CTC has been instructed by DGH to review the DED of seven packages completed by the P2JNs package 5, 6, 11, 13, 15, 17 and 19. These conditions imply to the need of
changing the CTC scope of works which will be included in CTC contract amendment and the need to extend the Senior Highway Engineer and Senior Road Safety Audit Engineer