6.3.4 Complaint Handling System CHS
The Community Development Officer with collaboration with MIS Specialist has developed a software application of Complaint Handling System CHS in integrated to website of WINRIP http:www.winrip-ibrd.com. In the implementation of Complaint Handling System CHS essentially there are four main components as follows: Data Entry. Complaint Registration. Complaint Assessment. Field Clarification and Analysis. Problem Solving and taking the Decision The final draft of Complaint Handling System the framework of the complaint procedures on the web site of WINRIP and provided ACAP inputting data in the web site has ready to be operated. However these applications still continuously to be refined by considering input from various parties. The CHS team has been monitored and noted the public complaints via website of Sytem Informasi Pemantauan Proyek SiPP Project Monitoring Information System and WINRIP website. The activity on Complaint Handling System during March 2017 as follows: Complaint Handling Unit of CTC has received public complaints from Buyung Fajri Non- Government Organization JEJAK , thru email on March 5, 14, and 21, 2017, regarding the condition of retaining wall on approach road of Air Gadang Bridge in Packages No. 02 Padang Sawah Simpang Empat. This package has been PHO on April 14, 2016 is now entered the maintenance period. The Retaining wall is broken so that the potential to collapse and the approach way has happened consolidation or surfaces decrease. Complaint Handling Unit of CTC has received public complaints from Buyung Fajri Non- Government Organization JEJAK , thru email on March 21, 2017, regarding the implementation of WINRIP Packages No.21 Lubuk Alung Kuraitaji. The complaint matters for package 21 are the Contractor PT. MULTI STRUCTURE ignores the workers health and safety; the existing road deteriorates due to lack of periodic maintenance re-condition of road; the lack of traffic management on temporary traffic signs and flag man in the working areas; and the Supervision Consultant is not performing maximum supervision function The Complaints Handling Mechanism System CHS Activities is shown in Appendix H3. 6.3.5. Public Disclosures Publication Publication and disclosure is an attempt to increase transparency of information to the public, so the public can easily to access information about the project WINRIP. Some components of publication and disclosures are as follows: a announcing the information about the project throughParts
» WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» World Bank Implementation Review Mission and Site Visit
» Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Background WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Project Development WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Project Objective WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Technical Assistance for Development of Slope Stabilization, Design and
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Procurements WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Civil Works Progress WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 48.20 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» -7.63 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 158 CD WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 57.22 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 56.64 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 0.52 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 62CD WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» -34.62 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 281 CD WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» -28.01 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 107 CD WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 15.63 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» -34.08 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 0.07 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 492 CD WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 61.37 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 33.37 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 21.25 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Quality Assurance WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» The Contractor Action Plan on Environmental Management and Monitoring RKPPL
» Environmental Quarterly Report Environmental Issues
» Socialization of HIV-AIDs Campaign
» Quarries Management. Environmental Issues
» WB Mission 15 17 February 2017 on Packages No.7,12 14
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14 Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Action Plan ACAP
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues
» Complaints Handling Mechanism CHS
» Road Safety Audit WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Database Establish the Document Management System DMS to provide:
» World Bank Missions Agreed Key Actions and Mission Plans during Recent World Bank Mission
» Performance Indicators World Bank and GOI Compliance
» Design and Supervision Consultant DSC
» Study on Development of Slope Stabilization Design and Management
» Complaint Handling System CHS
» DMS Statistic Management Information System
» Draw Downs and Future Costs Disbursement Quality Assurance
» Financial Risks Project Risks and Mitigation Measures
» Training to Support Project Implementation
Show more