281 CD WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480

Western I ndonesia National Roads I mprovement Project 4 - 6 Package No. 12 : Kambang - Indrapura The progress of this month is only 0.94 likely, the last month 0.96 against the scheduled 13.31. After failure of the 1 st test case, the client gave the 2 nd test case March, 14 27, 2017 to the contractor but, the results were so poor as well due to the poor management and no financial supports of the contractor. The client is to give the final test case to the contractor soon and consider the next phase of determination in accordance with the results of the final Test Case. Details of the Contract Package are shown in ANNEX P-12 Executive Summary Report . Package No. 13 : Sp. Rukis Tj. Kemuning This month progress is achieved of 1.63 against the scheduled 8.80. The reasons of delayed progress are almost same as those of the last month accordingly the client have given the test case to the contractor. The new GS of contractor had been in duty. It is expected to settle the delayed payments to the subcontractors which was of the main reasons of delay. The contractor is still preparing for the extension of time due to the unsettled land acquisition sta. 25 km 43 km. Details of the work progress are shown in ANNEX P-13 Executive Summary Reports. Package No. 14: Painan - Kambang The progress of this month is achieved of 6.37 against the scheduled 5.24. Working activities of this month have been done in extentive areas and with Earthworks, pavement works, structures. Considering the target date of completion as of December, 2017, this package is so necessary to secure the working areas for asphalt pavement work continueosly and the unsettled land acquisition 12.9 km has to be cleared soon. ANNEX P-14 Executive Summary Report shows the complete details of the project. Package No. 15: Sibolga Bts. Tapsel The progress of this month is only achieved of 1.58 against the scheduled 6.50. In order to catch-up the delayed progress, the most crucial problems are the unsettled land acquisition Apprx. 16.5 km and relocation of existing utilities electrical poles, water pipes. Without resolutions of the above, it is so difficult to secure the working areas for pavement works which are the major works about 65 of the total contract amount. Detailed and work progresses of the contract package are shown in ANNEX P-15 Executive Summary Report . Package No. 16 : Seblat Ipuh In accordance with the revised schedule, this month progress is achieved of 1.13 against the scheduled 1.08. The major works at the early stage of the project have been done, in normal, with Drainage, Earthworks, Granular Pavement Works.