Monitoring Report of the LARAP Package No.16
21. Monitoring Report of the LARAP Package No. 21
: Lubuk Alung - Kuraitaji Province : Sumatera Barat A. Previous Status : • World Bank issued NOL to LARAP documents on December 19, 2014. • NOL WB of the Monitoring Report-1 for compensation payment of 515 out of the total 869 PAPs on August 23, 2016 B. Pending Issues, Concern and Actions a Pending of assessment process is a hindrance to complete compensation payment C. Update during this reporting month of March 2017 a A Monitoring Report of the compensation payments progress for 236 Aps has submitted to WB and NOL issued by Bank on January 24, 2017 b Compensation for the remaining of PAPs is under payment by Satker c Total PAP = 869 updated; Compensated = 779; Percent complete = 89.6.4.7 Anti Corruption Issues
4.7.1 Anti Corruption Action Plan ACAP
ACAP for WINRIP was developed from the previous SRIP experiences. Basically, it has the same main components of involving the Community Representative Observers CRO in the bid opening and Third Party Monitoring TPM during the construction supervision although modification was made on the selection process of the CROs for SRIP. Within this plan there are four main pillars as indicated separately below a Community Representative Observers CRO b Publication Disclosure c Complaints Handling System CHS d Third Party Monitoring TPM4.7.2 Community Representative Observers CRO
The Community Representative Observers, who are required to observe the actual bidding activities, were appointed for WP-1 group. All of the CROs were university staff, selected in accordance with the World Bank suggestion to request assistance from local universities. CRO is the independent observer who is not related directly or indirectly to the Contractors, Consultants, and Suppliers or not be part of the WINRIP s management, and not a member of any political party. CROs selection procedures: a. Review the criteria and qualifications of candidates for the CRO. b. Director of Planning, DGH as Chairman of the Project Management Unit, delegated the authority to the selection of the CRO to the Head of National Roads Implementation AgencyParts
» WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» World Bank Implementation Review Mission and Site Visit
» Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
» Background WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Project Development WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Project Objective WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Technical Assistance for Development of Slope Stabilization, Design and
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Procurements WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Civil Works Progress WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 48.20 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» -7.63 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 158 CD WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 57.22 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 56.64 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 0.52 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 62CD WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» -34.62 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 281 CD WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» -28.01 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 107 CD WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 15.63 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» -34.08 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 0.07 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 492 CD WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 61.37 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 33.37 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» 21.25 WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Quality Assurance WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Review Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» The Contractor Action Plan on Environmental Management and Monitoring RKPPL
» Environmental Quarterly Report Environmental Issues
» Socialization of HIV-AIDs Campaign
» Quarries Management. Environmental Issues
» WB Mission 15 17 February 2017 on Packages No.7,12 14
» Monitoring Report of the LARAP Package No. 1
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No. 12
» Monitoring Report of the LARAP Package No. 13
» Monitoring Report of the LARAP Package No. 14 Monitoring Report of the LARAP Package No. 15
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20
» Monitoring Report of the LARAP Package No. 21
» Anti Corruption Action Plan ACAP
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues
» Complaints Handling Mechanism CHS
» Road Safety Audit WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
» Database Establish the Document Management System DMS to provide:
» World Bank Missions Agreed Key Actions and Mission Plans during Recent World Bank Mission
» Performance Indicators World Bank and GOI Compliance
» Design and Supervision Consultant DSC
» Study on Development of Slope Stabilization Design and Management
» Complaint Handling System CHS
» DMS Statistic Management Information System
» Draw Downs and Future Costs Disbursement Quality Assurance
» Financial Risks Project Risks and Mitigation Measures
» Training to Support Project Implementation
Show more