2011
Annual Report•PTBORNEOLUMBUNGENERGIMETALTbk | 141
PT BORNEO LUMBUNG ENERGI METAL TBK. DAN ENTITAS ANAKAND SUBSIDIARIES Lampiran 28 Schedule
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN
31 DESEMBER 2011 DAN 2010 Dinyatakan dalam jutaan Rupiah,
kecuali dinyatakan secara khusus
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
31 DECEMBER 2011 AND 2010
Expressed in millions of Rupiah, unless otherwise stated
2. IKHTISAR KEBIJAKAN AKUNTANSI PENTING
lanjutan
2. SUMMARY
OF SIGNIFICANT
ACCOUNTING POLICIES continued
h. Aset tetap
h. Fixed assets
Aset tetap diakui sebesar harga perolehan dikurangi akumulasi penyusutan.
Aset tetap disusutkan menggunakan metode garis lurus mana yang lebih pendek antara
estimasi umur aset atau umur tambang atau sisa umur PKP2B:
Fixed assets
are stated
at cost,
less accumulated depreciation.
Fixed assets are depreciated using the straight- line method over the shorter of the estimated
useful lives of the assets or the mine life or the term of the CCoW as follows:
TahunYears Bangunan
5 – 20 Buildings
Infrastruktur 10 – 30
Infrastructure Peralatan dan perlengkapan kantor
4 Office furniture and equipment
Kendaraan 4 – 8
Vehicles Alat berat
4 – 8 Heavy equipment
Masa manfaat dan nilai sisa aset dievaluasi dan disesuaikan kembali, jika diperlukan, pada
setiap akhir tahun buku. Perubahan yang terjadi
diakui dalam
laporan pendapatan
komprehensif konsolidasian secara prospektif. The assets’ useful lives and residual values are
reviewed and adjusted as appropriate at each financial year end. The effects of any revision
are recognised in the consolidated statements of comprehensive income prospectively.
Biaya yang terjadi setelah tanggal transaksi dimasukkan ke dalam nilai tercatat aset atau
diakui sebagai aset yang terpisah hanya jika manfaat dari aset tersebut di masa depan bisa
didapatkan oleh Grup, dan biaya dari aset tersebut dapat ditentukan secara meyakinkan.
Nilai tercatat dari aset pengganti dihapus. Biaya pemeliharaan dan perbaikan dibebankan
sebagai beban pada periode terjadinya dalam laporan
pendapatan komprehensif
konsolidasian. Subsequent costs are included in the asset’s
carrying amount or recognised as a separate asset, as appropriate, only when it is probable
that future economic benefits associated with the item will flow to the Group and the cost of
the item can be measured reliably. The carrying amount of the replaced part is derecognised. All
other repairs and maintenance expenditure are charged to the consolidated statements of
comprehensive income
during the financial period in which they are incurred.
Apabila penggunaan aset tetap dihentikan lagi atau aset yang bergerak dijual, nilai tercatat
dikeluarkan dari
laporan keuangan
konsolidasian, dan keuntungan dan kerugian yang timbul akibat penarikan atau penjualan
aset tetap tersebut diakui dalam laporan pendapatan komprehensif konsolidasian.
When assets are retired or otherwise disposed of, their carrying amounts are eliminated from
the consolidated financial statements, and the resulting gains and losses on the disposal of
fixed assets are recognised in the consolidated statements of comprehensive income
Akumulasi biaya
konstruksi bangunan,
infrastruktur, pabrik
dan instalasi
mesin dikapitalisasi
sebagai aset
dalam penyelesaian.
Akumulasi biaya
tersebut dipindahkan ke akun aset tetap pada saat
konstruksi atau
pemasangan selesai.
Penyusutan dimulai pada saat aset tersebut siap untuk digunakan.
The accumulated costs of the construction of buildings,
infrastructure, plants
and the
installation of machinery are capitalised as construction in progress. These accumulated
costs are reclassified to fixed asset accounts when
the construction
or installation
is complete. Depreciation is charged when the
date of assets are ready for use.
142
| PTBORNEOLUMBUNGENERGIMETALTbk • Laporan Tahunan 2011
PT BORNEO LUMBUNG ENERGI METAL TBK. DAN ENTITAS ANAKAND SUBSIDIARIES Lampiran 29 Schedule
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN
31 DESEMBER 2011 DAN 2010 Dinyatakan dalam jutaan Rupiah,
kecuali dinyatakan secara khusus
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
31 DECEMBER 2011 AND 2010
Expressed in millions of Rupiah, unless otherwise stated
2. IKHTISAR KEBIJAKAN AKUNTANSI