Program Pensiun dan Imbalan Kerja Pension Plan and Other Employee Benefits

PT JAYA KONSTRUKSI MANGGALA PRATAMA Tbk DAN PERUSAHAAN ANAK CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN Lanjutan Untuk Tahun-tahun yang Berakhir pada 31 Desember 2010 dan 2009 Dalam Rupiah Penuh PT JAYA KONSTRUKSI MANGGALA PRATAMA Tbk AND SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS Continued For the Years Ended December 31, 2010 and 2009 In Full Rupiah d324 Maret 2011 92 Paraf Mata Uang Ekuivalen Mata Uang Ekuivalen Asing Rupiah Asing Rupiah Foreign Rupiah Foreign Rupiah Currencies Equivalent Currencies Equivalent Kewajiban Liabilities Hutang Usaha Account Payables JPY 6,860,892.43 756,655,580 -- -- JPY USD 1,457,207.21 13,101,750,024 1,709,439.74 16,068,733,556 USD EURO 12,386.00 148,084,415 3,891.60 52,574,310 EURO SGD 180.00 1,256,510 38,251.74 256,230,045 SGD Hutang Leasing Lease Payable USD 55,580.37 499,723,107 160,308.04 1,506,895,576 USD Jumlah Kewajiban 14,507,469,636 17,884,433,487 Total Liabilities 2010 2009 40. Ikatan dan Perjanjian Penting 40. Significant Agreements a. Perusahaan mempunyai komitmen untuk melaksanakan pekerjaan konstruksi sebagai berikut: a. The Company has significant commitments for completing the construction of the project, which details as follows: Nilai Kontrak Value Conract Mulai Selesai Rp Start Due Date 1 Jl Semarang Demak - JO 97,111,607,040 Dinas Pekerjaan Umum RI 113007 111909 2 Jl Karang Ampel Cirebon 59,726,304,365 Dinas Pekerjaan Umum RI 113007 111909 3 Banjir Kanal Timur 157,852,287,455 Dinas Pekerjaan Umum Dirjen Sumber Daya Air 120307 112209 4 Kantor Bupati Kep. Riau 264,191,757,114 Dinas Pekerjaan Umum Provinsi Riau 121507 060110 5 Jl Lolowau Teluk Dalam 65,469,330,569 Badan Rehabilitasi dan Rekonstruksi BRR NAD - Nias 022508 022409 6 Jl Payakumbuh Pangkalan 34,388,770,000 SNVT Pemb Jalan Jembatan Sumatera Barat 041108 081909 7 Jl Pati Rembang 32,135,720,874 Departemen Pekerjaan Umum Republik Indonesia 041108 110209 8 Jl Geumpang - Tutut 48,248,311,458 Badan Rehabilitasi dan Rekonstruksi BRR NAD - Nias 042108 042109 9 Jl Pangkalan Lada 32,570,229,283 SNVT Pemb Jalan Jembatan Kalimantan Tengah 052308 020710 10 Gerbang Tol Pondok Gede 171,757,746,056 PT Jasa Marga Persero Tbk 062308 032009 11 Hotmix Jl Semarang Demak 7,542,805,585 JK - Duta Graha 090108 113009 12 Drainase Lhokseumawe 113,965,977,411 Procurement Committee for Water Sanitation 090108 022310 13 Jl Lahusa - Gomo Nias 59,409,818,428 Procurement Committee for Water Sanitation 091108 120409 14 Tutup Lubang Jl DKI 36,875,777,273 Dinas Pekerjaan Umum Provinsi DKI Jakarta 102008 090409 15 Pemel Jl Lingkar Kudus 39,028,872,183 Kuasa Pengguna AnggaranKepala SNVT Tertentu Preservasi Jalan 112608 011910 16 Normalisasi Kali Sabi 63,220,871,898 DPU Dirjen Sumber Daya Air Satker NVT Sumber Daya Air Ciliwung 120308 072010 17 Jl Tohpati - Kusumba Bali 90,409,714,648 DPU Dirjen Bina Marga Satker Non Vertikal Tertentu Pemb Jalan Jembatan 120508 120510 18 GOR Sarolangun 61,663,909,091 Dinas Pekerjaan Umum Perumahan Rakyat Kab. Sarolangun 120908 040310 19 Utility PLTU 1 Banten 15,024,633,000 PT Rekayasa Industri 022409 092309 20 By Pass Sumbawa Besar 65,010,404,770 Bendahara SNVT Pembangunan Jalan dan Jembatan Sumbawa 030509 082609 21 Jl KM50 - Puruk Cahu II 13,136,932,651 SNVT Pembangunan Jalan Jembatan Kalteng 031409 110809 22 Jl Sicincin Malalak 21,545,116,364 Bendahara Pengeluaran Dinas Prasarana Jalan Tarkim 050509 101110 23 Pemeliharaan Tol Ciawi 19,021,645,455 PT Jasa Marga Persero Tbk 051209 110810 24 Pemeliharaan Tol Kanci 5,843,399,016 PT Jasa Marga Persero Tbk 060309 103109 25 Perawatan Jl Jakpus Zona 2 17,914,227,273 Pemerintah Provinsi DKI Jakarta 060409 100209 26 Tol Tangerang Merak 15,272,727,273 PT Marga Mandala Sakti 060409 010410 27 Tol Tangerang Merak II 14,090,909,091 PT Marga Mandala Sakti 060409 010410 28 Jl Bontang Sangatta III 12,664,020,503 SNVT Preservasi Jalan Jembatan Kaltim 061709 112309 29 Substruktur Ciputra World 61,753,283,000 PT Ciputra Adigraha 062909 092609 30 Gedung Mess Penghubung Aceh 59,887,493,274 Bendahara Pengeluaran Kantor Penghubung Pemereintah Aceh 062909 092609 No Nama Proyek Project Pemberi Kerja Project Owner Tenggang Waktu PT JAYA KONSTRUKSI MANGGALA PRATAMA Tbk DAN PERUSAHAAN ANAK CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN Lanjutan Untuk Tahun-tahun yang Berakhir pada 31 Desember 2010 dan 2009 Dalam Rupiah Penuh PT JAYA KONSTRUKSI MANGGALA PRATAMA Tbk AND SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS Continued For the Years Ended December 31, 2010 and 2009 In Full Rupiah d324 Maret 2011 93 Paraf Nilai Kontrak Value Conract Mulai Selesai Rp Start Due Date No Nama Proyek Project Pemberi Kerja Project Owner Tenggang Waktu 31 Pemeliharaan Tol Jakarta Tangerang 15,303,515,455 PT Jasa Marga Persero 061809 121509 32 Pemeliharaan Tol Ulujami 3,932,255,569 PT Jasa Marga Persero 061909 091709 33 Gedung Bandara Fisabilillah 42,321,000,000 PT Angkasa Pura II Persero Kantor Cabang Bandara Fisabilillah 073109 052710 34 Jl Pamanukan - Lohbener 26,448,702,802 SNVT Preservasi Jalan Jembatan Provinsi Jawa Barat 081009 121609 35 Gedung Kantor DPRD Sumut 165,893,034,545 Pemerintah Daerah Provinsi Sumatera Utara 090409 112710 36 Break Water Muara Angke 66,538,842,727 Dinas Pekerjaan Umum Provinsi DKI Jakarta 092409 121509 37 Jalan Sumbawa Paliv Km70 - JO 72,802,136,500 SNVT Pembangunan Jalan Jembatan Sumbawa 120909 091211 38 Gedung DPRD Balaikota DKI 356,277,295,591 Dinas Perumahan dan Gedung Pemda Provinsi DKI Jakarta 123109 121512 39 Jalan Bontang Sangatta IV 11,904,060,459 SNVT Pembangunan Jalan Jembatan Kalimantan Timur 020910 110510 40 Jalan Bontang Sangatta V 11,904,060,110 SNVT Pembangunan Jalan Jembatan Kalimantan Timur 020910 110510 41 Underpass Arteri Row50 7,271,760,000 PT Jaya Real Property Tbk 020410 042710 42 Tanggul Jedi Ancol Timur 37,987,628,925 PT Pembangunan Jaya Ancol Tbk 030110 082810 43 Jalan KM50 Puruk Cahu III 12,029,528,182 Kementerian Pekerjaan Umum Dirjen Bina Marga Provinsi Kalimantan Tengah 041710 122210 44 Overpass Arteri Row50 7,844,974,000 PT Jaya Real Property Tbk 042510 082710 45 Rumah Sehat Zona Madina 22,536,363,636 Yayasan Dompet Dhuafa Republika 061710 071610 46 Ciputra World - JO 213,520,581,818 PT Ciputra Adigraha 062210 082010 47 Saluran Jl Thamrin cs 32,592,504,545 Dinas Pekerjaan Umum Provinsi DKI Jakarta 081110 122410 48 Gedung Bandara Fisabilillah 2 35,590,909,091 PT Angkasa Pura II Persero Kantor Cabang Bandara Fisabilillah 090610 050311 49 Tanggul Jedi Ancol Timur 2 35,636,908,125 PT Pembangunan Jaya Ancol Tbk 092110 022011 50 Fly Over Rawa Buaya 115,437,047,743 SNVT Pembangunan Jalan Jembatan Metropolitan Jakarta 101110 060112 51 Pemeliharaan Jl Arteri 12,550,708,182 DPU Provinsi DKI Jakarta 100410 100211 52 Rusun Waduk Pluit 18,112,289,984 Dinas Perumahan dan Gedung Pemda Provinsi DKI Jakarta 101510 121310 53 Jalan Layang Casablanca - JO 139,998,503,590 Dinas Pekerjaan Umum Provinsi DKI Jakarta 111910 080912 54 Rumah Sakit Pulomas 38,927,738,182 PT Pulo Mas Jaya 111810 071811 55 Terminal Bus Pulo Gebang - JO 265,107,035,725 Dinas Perhubungan Provinsi DKI Jakarta 121610 101612 56 Hotmix Recycling 6,408,801,825 PT Jagat Karsa Mandiri Pratama 111010 121510 b. Fasilitas Bank Garansi dan Non Cash Loans dari PT Bank Mandiri Persero Tbk. b. Bank Guarantee Facility and Non Cash Loans from PT Bank Mandiri Persero Tbk. Pada tanggal 9 September 2008, sesuai dengan addendum III atas perubahan Perjanjian Pemberian Non Cash Loan No. KP-COD028PNCL2006. Perusahaan memperoleh perpanjangan waktu fasilitas untuk periode sampai dengan 1 Oktober 2009, serta penambahan nilai fasilitas sebesar Rp 40.000.000.000 sehingga total fasilitas menjadi sebesar Rp 100.000.000.000. On September 9, 2008, based on the amendment III of the change of Non Cash Loan Agreement No. KP-COD028PNCL2006, the Company obtained credit term facility extention up to October 1, 2009 and addition of credit limit amounting to Rp 40,000,000,000 there one new credit limit is Rp 100,000,000,000. Pada tanggal 30 Oktober 2009, sesuai dengan addendum VI atas perubahan Perjanjian Pemberian Non Cash Loan No. KP-COD028PNCL2006. Perusahaan memperoleh perpanjangan waktu fasilitas untuk periode sampai dengan 1 Oktober 2010, serta penambahan nilai fasilitas sebesar Rp 200.000.000.000 sehingga total fasilitas menjadi sebesar Rp 300.000.000.000. On October 30, 2009, based on the amendment III of the change of Non Cash Loan Agreement No. KP-COD028PNCL2006, the Company obtained credit term facility extention up to October 1, 2010 and addition of credit limit amounting to Rp 200,000,000,000 there for the new credit limit is Rp 300,000,000,000. Pada tanggal 30 September 2010, sesuai dengan addendum VII atas perubahan Perjanjian Pemberian Non Cash Loan No. KP-COD028PNCL2006 No.17. Perusahaan memperoleh perpanjangan waktu fasilitas untuk periode sampai dengan 1 Oktober 2011. On September 30, 2010, based on 7 th addendum of Non Cash Loan Agreement No KP-COD028PNCL2006 No. 17, the Company obtained the facility of non cash loan until October 1, 2011. PT JAYA KONSTRUKSI MANGGALA PRATAMA Tbk DAN PERUSAHAAN ANAK CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN Lanjutan Untuk Tahun-tahun yang Berakhir pada 31 Desember 2010 dan 2009 Dalam Rupiah Penuh PT JAYA KONSTRUKSI MANGGALA PRATAMA Tbk AND SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS Continued For the Years Ended December 31, 2010 and 2009 In Full Rupiah d324 Maret 2011 94 Paraf c. Fasilitas Cash Loans dari PT Bank Mandiri Persero Tbk. Pada 20 November 2008, sesuai dengan Perjanjian Kredit Modal Kerja No. KC-CRO54PK-KMK2008 No 03, Perusahaan mendapatkan fasilitas Kredit Modal Kerja Transaksional switchable Fasilitas Non Cash Loan sebesar Rp 100.000.000.000 untuk periode 20 November 2008 sampai dengan 1 Oktober 2009. c. Cash Loan Facility from PT Bank Mandiri Persero Tbk. On November 20, 2008, based on Working Capital Credit Agreement No. KC-CRO54PK-KMK2008 No. 03, the Company obtained Transactional Working Capital Credit switchable Non Cash Loan Facility amounting to Rp 100,000,000,000 for period from November 20, 2008 up to October 1, 2009. Pada tanggal 30 September 2010, sesuai dengan addendum II yang merubah addendum I atas perubahan Perjanjian Pemberian Non Cash Loan No. KP- CRO54PK-KMK2008 No.03. Perusahaan memperoleh perpanjangan waktu fasilitas untuk periode sampai dengan 1 Oktober 2011. On September 30, 2010 based on addendum II which changes addendum I on Agreement of Non Cash Loan Facility No KP-CRO54PK-KMK2008 No.03, the Company obtained the facility until October 1, 2011. Jaminan atas fasilitas tersebut di atas antara lain : The collaterals used for the facility are as follows: a. Jaminan non fixed asset berupa seluruh Piutang Dagang serta persediaan yang ada dan akan ada yang diikat dengan Fidusia dengan total nilai pengikatan sebesar Rp 601.347.000.000. a. Guarantee of non fixed assets represents an entire of existing Trade Receivable and Inventory and will exist which will be bounded with fiducia amounting to Rp 601,347,000,000 b. Dua 2 bidang tanah dan bangunan sertifikat HGB antara lain : b. Two 2 lands and buildings with Building Right as follows: Tanah sertifikat Hak Guna Bangunan No. 137 seluas 12.910 m2, terletak di kecamatan Cakung, Kelurahan Jatinegara, Jakarta Timur; Certificate of Building Use Rights SHGB No.137 with the total area of 12,910 m 2 , located in subdistrict Cakung, Village Jatinegara, East Jakarta; Tanah sertifikat Hak Guna Bangunan No. 993 seluas 6.830 m2, terletak di kecamatan Pesanggrahan, Kelurahan Bintaro, Jakarta Selatan. Certificate of Building Use Rights SHGB No.993 with the total area of 6,830 m2, located in subdistrict Pesanggrahan, Village Bintaro, South Jakarta. Kedua asset diatas bernilai sebesar Rp 54.991.000.000. Both the above assets have value amounting to Rp 54,991,000,000. d. Perjanjian Fasilitas Perbankan PT Bank DBS Indonesia: d. Several facility from PT Bank DBS Indonesia: Pada 4 Pebruari 2010, sesuai dengan Akta Perjanjian Fasilitas Perbankan No 12 tertanggal 4 Pebruari 2010, Perusahaan mendapatkan Fasilitas Perbankan dalam bentuk ”uncomittted bank guarantee facility” dengan jumlah fasilitas tersedia maksimum sebesar Rp 50.000.000.000 yang akan berakhir pada tanggal 4 Pebruari 2011. On February 4, 2010 based on Agreement Deed Banking Facility No. 12 dated February 4, 2010, the Company obtained banking facility called “uncommitted bank gu arantee facility” with maximum available facility of Rp 50,000,000,000 which will be mature on February 4,2011. Jaminan atas fasilitas tersebut di atas antara lain : The collaterals used for the facility are as follow: a. Perjanjian gadai atas deposito yang disimpan di Bank dengan nilai penjaminan sebesar 10 dari nilai setiap Bank Garansi BG yang akan diterbitkan selanjutnya disebut sebagai ”Gadai Deposito”. a. Covenant pledged over bank deposits held in the collateral value of 10 of the value of each Bank Guarantee B G to be issued hereinafter referred to as the Pledge of Deposit ”. PT JAYA KONSTRUKSI MANGGALA PRATAMA Tbk DAN PERUSAHAAN ANAK CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN Lanjutan Untuk Tahun-tahun yang Berakhir pada 31 Desember 2010 dan 2009 Dalam Rupiah Penuh PT JAYA KONSTRUKSI MANGGALA PRATAMA Tbk AND SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS Continued For the Years Ended December 31, 2010 and 2009 In Full Rupiah d324 Maret 2011 95 Paraf b. Jaminan kebendaan fidusia atas tagihanpiutang dengan nilai penjaminan hingga sejumlah Rp 50.000.000.000 selanjutnya disebut sebagai ”Fidusia Tagihan”. b. Fiduciary of property collateral guarantee receivables amounting to Rp 50,000,000,000 hereinafter referred to as Claims Fiduciary. c. Untuk bank garansi yang akan diterbitkan atas Joint Operation, tambahan deposito atau Counter Guarantee harus diberikan oleh Joint Operator dengan nilai yang sesuai dengan bagiannya dalam Joint Operation tersebut. c. For bank guarantee that will be issued on the Joint Operation, additional deposit or Counter Guarantee shall be given by the Joint Operator with value corresponding to its share in the Joint Operation. e. Beberapa Perjanjian Kerjasama Operasi sebagai berikut: e. Several Joint Operation Agreements are as follows:

1. JO Jaya Konstruksi Duta Graha - Proyek Jalan

Semarang Demak 1. JO Jaya Konstruksi Duta Graha - Proyek Jalan Semarang Demak Berdasarkan Perjanjian Kerjasama Operasi, pada tanggal 8 Agustus 2007 dari Notaris Wartiana, SH, Perusahaan dan PT Duta Graha Indah membentuk kerjasama operasi KSO untuk melaksanakan pembangunan Strategic Roads Infrastructure Project di Semarang Demak dengan pembagian penyertaan masing-masing sebesar 55 untuk Perusahaan dan 45 untuk PT Duta Graha Indah. Based on the Joint Operation Agreement, dated August 8, 2007 of Notary Wartiana, SH, the Company and PT Duta Graha Indah forming a joint operation KSO to carry out development of the Strategic Roads Infrastructure Project in Semarang Demak with each participation 55 to the Company and 45 for PT Duta Graha Indah.

2. JO Jaya Duta Graha - Proyek Jalan Tohpati

Kusamba Bali 2. JO Jaya Duta Graha - Proyek Jalan Tohpati Kusamba Bali Berdasarkan Perjanjian Kerjasama Operasi, pada tanggal 6 Agustus 2008 dari Notaris Wartiana, SH, MKn, Perusahaan dan PT Duta Graha Indah Tbk membentuk kerjasama operasi KSO untuk melaksanakan Proyek Jalan Tohpati Kusamba Bali, dengan pembagian penyertaan masing-masing sebesar 55 dan 45. Based on the Joint Operation Agreement, dated August 6, 2008 of Notary Wartiana, SH, Mkn the Company and PT Duta Graha Indah Tbk established a joint operation KSO to carry out Tohpati Kusamba Bali Road Project, with a share of respectively 55 and 45 .

3. JO BCK Jaya Konstruksi

– Proyek Jalan Lolowau – Teluk Dalam

3. JO BCK Jaya Konstruksi – Proyek Jalan Lolowau –

Teluk Dalam Berdasarkan Perjanjian Kerjasama Operasi, pada tanggal 28 September 2008 dari notaris Wartiana, SH, Perusahaan dan PT Bangun Cipta Kontraktor membentuk kerjasama operasi KSO untuk melaksanakan pembangunan Proyek Pekerjaan Jalan Lolowau-Teluk Dalam Km 58,412 dengan pembagian penyertaan masing-masing sebesar 65 untuk Perusahaan dan 35 untuk PT Bangun Cipta Kontraktor. Based on the Joint Operation Agreement on September 28, 2008 of Notary Wartiana, SH, the Company and PT Bangun Cipta Kontraktor established a joint operation KSO to carry out the construction of Road Works Project Lolowau - Teluk Dalam 58.412 Km with participation 65 for the Company and 35 for PT Bangun Cipta Kontraktor.