Procurements WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.

Western I ndonesia National Roads I mprovement Project 23 Table 4.1 Program Contract Package Contractor Name of Road Province Contract Signed Notice to Proceed Contract Time Completion Date AWP-1 1 Jaya Konstruksi Manggala Pratama Tbk Biha - Krui Lampung Nov 25, 2013 Jan 8, 2014 640 CD Oct 9, 2015 2 Jaya Konstruksi Manggala Pratama Tbk Padang Sawah Sp. Empat including Air Gadang West Sumatera Dec 6, 2013 Jan 6, 2014 730 CD Jan 5, 2016 3 Jaya Konstruksi Manggala Pratama Tbk Manggopoh Padang Sawah West Sumatera Dec 6, 2013 Jan 6, 2014 730 CD Jan 5, 2016 4 PT. Waskita Karya and PT. Mulya Turangga JO Ipuh - Bantal Bengkulu Nov 14, 2013 Jan 10, 2014 730 CD Jan 9, 2016 AWP-2 11 PT. Hutama KaryaPT. Daya Mulya J.O. Bantal Mukomuko Bengkulu Dec 18, 2014 Still to be issued 720 CD Still to be determined 13 PT. Waskita Karya Persero Tbk. Sp. Rukis TJ. Kemuning Bengkulu Dec 18, 2014 Still to be issued 720 CD Still to be issued AWP-3 17 PT. Jaya Konstruksi Manggala Pratama Tbk Sp. Gunung Kemala Pugung Tampak Lampung Nov 17, 2014 Still to be issued 24 MOS Still to be issued

4.4 Civil Works Progress

All the 4 Contractors substantially completed their mobilization and construction of Base Camps in all packages have been completed. Other activities done during this month were repair and restoration of deteriorated existing pavements, roadway excavation, embankment formation, spreading of granular pavement for roadway widening, asphalt paving, structural works, construction of stone masonry side ditches, stockpiling of raw material, production of crush aggregates and other minor works. Progress status of the four 4 on-going civil work contracts as of this reporting period are shown in Table 4.2. Table 4.2 Program Contract Package Contractor Name of Road Target Progress Schedule Ending December 2014 Actual Progress Accomplished Slippage Time Elapsed AWP-1 1 Jaya Konstruksi Manggala Pratama Tbk Biha - Krui

60.68 16.08

- 44.60 55.00 2 Jaya Konstruksi Manggala Pratama Tbk Padang Sawah Sp.Empat incl.Air Gadang Brd

44.72 33.73

- 10.99 48.36 3 Jaya Konstruksi Manggala Pratama Tbk Manggopoh Padang Sawah

44.01 24.38

- 19.63 48.36 4 PT. Waskita Karya and PT. Mulya Turangga JO Ipuh - Bantal 40.88

9.35 - 31.53

47.81 Western I ndonesia National Roads I mprovement Project 24 At the end of this reporting month of December 2014, all the four 4 contract packages did not achieved any significant accomplishments to catch up with the schedule and were still lagging farther behind schedule. The situation remains the same as in previous month as four 4 of the contract packages continue to follow a downward trend of delayed schedules. With time elapsed at the halfway mark 50 of the contract time for each of the four 4 contract packages, the Contractors will have hard time to deliver the Works on the target dates of completion, unless a workable and realistic action plans or Catch-up Schedules will be strictly implemented. Package No. 1 : Biha Krui At the end of this month, there was no substantial work accomplished to reduce previous month slippage of -39.91, instead the behind works further slipped behind to 44.60 as 54.84 of the contract time have elapsed. This problem have been going on for the past several month. The major work item which should have been given more concentration in order to attain a modest progress during the period would have been the drainage works 34.19 granular pavement 9.22 and asphalt pavement 40.14 which have a combine total work value of 83.55 . However, the Contractor was able to accomplished only 3.05 , progress for the three 3 major works item out of the overall month s progress of 3.46 . As agreed during the progress meeting held in Jakarta Bina Marga Office during the middle of the month, the Contractors committed to conduct a Test Case for a period of two 2 weeks from December 17-31, 2014 with targeted accomplishment of 4 . The Test Case was unsuccessful as only 3.46 progress was attained not in two 2 weeks time, but for the whole month. The overall situation of this contract package which to date, only 16.08 of progress is attained in the last 12 months of the contract time is so critical with respect to timely completion taking into consideration the short remaining contract time of only ten 10 months to complete the huge deficit of remaining works. As time is running out and with the balance of remaining works which is equivalent to 83.92 that is still to be completed by the Contractor within the remaining 45 of the contract period or 283calendar days cannot be attained unless the Contractor start a workable Action Plan this coming of January 2015. A high level management meeting between DGH and Contractors was held in Padang during the middle of the month wherein the main agenda were to resolved all issues and major problems that hampers the progress of the works. It is expected that in the coming months, the work progress will ultimately offset the previous slippage and be on time at the target date of completion. A more detailed status of this Package is presented in ANNEX P-I Executive Summary Report.