Western I ndonesia National Roads I mprovement Project 22
Qualification. As well as for all NCB the World Bank also requested to follow Post Qualification in procurement process.
All subprojects for WP-1 have been started with prequalification since 30 December 2011 for ICB multiple
contract. This was an advanced procurement action agreed by both DGH and the World Bank prior to the CTC establishment. All AWP-1 sub-projects had signed the contract. The last 2 sub-projects, Package 02: Pd.
Sawah Simpang Empat and Package 03: Manggopoh Padang Sawah, signed the contract on December 6, 2013 and NOL for disbursement for all 4 packages had been issued by the World Bank on December 10,
2013. As of the reporting month December 2014, a more detailed current updates are fully described in
Sub-Chapter 1.4 Procurement on Page 3 of this Report and consolidated project status in a tabulated format shown in Table 1.1 on page 7 of this Report.
Under Category 3 of Loan Agreement there are three 3 consultancy packages namely ;
1. Capacity Building For Disaster Risks Reduction 2. Capacity Building For Environmental Management
3. Capacity Building For Road Safety
Consultants for the three 3 consultancy packages are still to be procured. A more detailed updates can be
found in Sub-Chapter 1.5 Procurement on Page 6 of this Report. Draft Terms of References for the three packages are in the process of finalization.
The WINRIP updated Procurement Plan is attached as Appendix F.
4.3 Civil Works Implementation
All 4 contract packages under AWP-1 are currently under construction by different contractors. Commencement of works for all the 4 packages commenced on the 2
nd
week of January 2014. As the year ended, award of contract and signing of Contract Agreements for three 3 packages
between the Government of Indonesia and the winning Contractors has been excuted. Two 2 of the contract packages are under implementation schedule AWP-2 and the other contract package is
under AWP-3.
Table 4.1 shows the details for each contract packages.
Western I ndonesia National Roads I mprovement Project 23
Table 4.1
Program Contract
Package Contractor
Name of Road Province
Contract Signed
Notice to
Proceed Contract
Time Completion
Date
AWP-1 1
Jaya Konstruksi Manggala
Pratama Tbk Biha - Krui
Lampung Nov 25,
2013 Jan 8,
2014 640 CD
Oct 9, 2015 2
Jaya Konstruksi Manggala
Pratama Tbk Padang Sawah
Sp. Empat including Air
Gadang West
Sumatera Dec 6,
2013 Jan 6,
2014 730 CD
Jan 5, 2016 3
Jaya Konstruksi Manggala
Pratama Tbk Manggopoh
Padang Sawah West
Sumatera Dec 6,
2013 Jan 6,
2014 730 CD
Jan 5, 2016 4
PT. Waskita Karya and PT. Mulya
Turangga JO Ipuh - Bantal
Bengkulu Nov 14,
2013 Jan 10,
2014 730 CD
Jan 9, 2016
AWP-2 11
PT. Hutama KaryaPT. Daya
Mulya J.O. Bantal
Mukomuko Bengkulu
Dec 18, 2014
Still to be
issued 720 CD
Still to be determined
13 PT. Waskita Karya
Persero Tbk. Sp. Rukis TJ.
Kemuning Bengkulu
Dec 18, 2014
Still to be
issued 720 CD
Still to be issued
AWP-3 17
PT. Jaya Konstruksi
Manggala Pratama Tbk
Sp. Gunung Kemala
Pugung Tampak
Lampung Nov 17,
2014 Still to
be issued
24 MOS Still to be
issued
4.4 Civil Works Progress
All the 4 Contractors substantially completed their mobilization and construction of Base Camps in all packages have been completed. Other activities done during this month were repair and
restoration of deteriorated existing pavements, roadway excavation, embankment formation, spreading of granular pavement for roadway widening, asphalt paving, structural works,
construction of stone masonry side ditches, stockpiling of raw material, production of crush aggregates and other minor works. Progress status of the four 4 on-going civil work contracts as of
this reporting period are shown in Table 4.2.
Table 4.2
Program Contract
Package Contractor
Name of Road Target Progress
Schedule Ending December 2014
Actual Progress Accomplished Slippage Time Elapsed
AWP-1 1
Jaya Konstruksi Manggala Pratama
Tbk Biha - Krui
60.68 16.08
- 44.60 55.00
2 Jaya Konstruksi
Manggala Pratama Tbk
Padang Sawah Sp.Empat
incl.Air Gadang Brd
44.72 33.73
- 10.99 48.36
3 Jaya Konstruksi
Manggala Pratama Tbk
Manggopoh Padang Sawah
44.01 24.38
- 19.63 48.36
4 PT. Waskita Karya
and PT. Mulya Turangga JO
Ipuh - Bantal 40.88
9.35 - 31.53
47.81