Monitoring Report of the LARAP Package No. 14 : Painan - Kambang
18. Monitoring Report of the LARAP Package No.18
: Mukomuko Bts. Sumbar Province : Bengkulu A. Previous Status : • LARAP documents are still to be prepared B. Pending Issues, Concern and Actions a Still no issues and concerns C. Update during this reporting month of December 2014 a Still no update during this period. b Proposed to be replaced.19. Monitoring Report of the LARAP Package No.19
: Lais - Bintunan Province : Bengkulu A. Previous Status : • September 30, 2013, CTC received the LARAP documents from BBPJN III Palembang. • After CTC s review, PMU forwarded the documents to World Bank on November 13, 2013 requesting for No Objection Letter NOL. • Bank conducted their review and their comments were relayed to PMU thru letter on November 20, 2013. • On November 27, 2013, the World Bank sent letter to the Director of Planning to request the Director of Implementation Affairs thru SatkerPPK to revise the LARAP documents by incorporating their comments. • PMU resubmitted to the World Bank on January 9, 2014 the revised LARAP documents and was resubmitted again on May 21, 2014 due to some minor corrections. • World Bank issued on May 30, 2014 No Objection Letter NOL on the revised LARAP documents for implementation B. Pending Issues, Concern and Actions a Monitoring Reports of the LARAP s implementation have to be prepared and submitted for review and for submission to World Bank. b Head of Satker in Bengkulu informed PMU thru letter that LARAP implementation regarding land acquisition will be completed by the end of August 2014.Parts
» WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Visit WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Package 17 Sp. Gunung Kemala Pugung Tampak AWP-3.
» Package 11 Bantal Mukomuko AWP-2
» Package 13 Sp. Rukis Tj. Kemuning AWP-2
» Packages 5 Simpang Rampa Poriaha AWP-2
» Package No. 6 Pasar Pedati Kerkap AWP-2
» Package No.19 Lais Bintunan AWP-3
» Package No. 15 Sibolga Batas Tapsel AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» 16.08 33.73 24.38 WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» - 31.53 WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4 Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No. 13 : Sp. Rukis Tj. Kemuning
» Monitoring Report of the LARAP Package No. 14 : Painan - Kambang
» Monitoring Report of the LARAP Package No. 15 : Sibolga Bts. Tapsel
» Monitoring Report of the LARAP Package No.16 Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
Show more