Draw Downs and Future Costs Disbursement Management Information System Establish the Document Management System DMS to provide:

Western I ndonesia National Roads I mprovement Project 46 b. Document Management System DMS, used to record all information of letter and document files. The URL address of the DMS application will be at http:dms.winrip- ibrd.com . The DMS have 2 main modules below:

1. Letter Database System, used to record all information of incoming and

outgoing letter.

2. Document Library System, used to record all information of document and

report files. Western I ndonesia National Roads I mprovement Project 47 6 PROJECT PERFORMANCE

6.1 World Bank and GOI Compliance

6.1.1 World Bank Missions

No World Bank implementation mission this period. 6.1.2 Agreed Key Actions and Mission Plans During Recent World Bank Visit A list of the key actions monitored during the period are listed below. No. Action By Whom Status and Target dates 1 Medium Term Review Meeting DGH, Bappenas, MoF and Bank • January 14, 15 - 2015 2 ToR for Capacity Enhancement on Disaster Risk Mitigation PMU and CTC • Bank and CTC have provided comments • PMU has submitted the revised TOR for Bank NOL, ROI and RFP in December 19, 2014. 3 Complete and send to the Bank UKL UPL for package 4 CTC • Environmental Agency has issued recommendation of the UKL UPL on October 30, 2014. • The Environmental permit was issued on Dec 8, 2014 and UKLUPL informally submitted to WB on Nov. 14, 2014. 4 Submit LARAP documents for packages 7, 8, 10 and 12 for Bank review DGH • 8, 10 - NOL given on August 12, 2014. • 7, 12 NOL given on October 14, 2014. 5 Submit to the Bank the LARAP monitoring report for package 2 PMU • Will be submitted in January, 2015. 6 Submit to the Bank the LARAP monitoring reports for packages 6, 11 and 19 PMU • Package 11 submitted on Dec. 2014 • Package 6 and 9 to be submitted on Jan. 2015 7 Submit to the Bank the LARAP monitoring report for packages 13 and 15 PMU • Will be submitted in April to June, 2015. 8 Submit to the Bank the LARAP for packages 14, 20 and 21 PMU • Will be submitted in July, 2015. 9 Submit to the Bank the LARAP monitoring report for package 17 PMU • Will be submitted on April to June, 2015. 10 Finalize NCB standard bidding document SBD for full e- procurement MPW Bintek, PMU, Pusdata, and Bapekon and Bank • Resolved 11 Package 6 and 19 start bidding process using NCB full e-proc PMU • Bids were submitted and opened on December 29, 2014 12 Bidding of Package 17 PMU • Contract awarded on Nov. 17, 2014 • Commencement of work will depend on LARAP implementation progress • Send weekly LARAP progress report to Bank every Monday 13 Bidding of package 5 PMU • Bid Evaluation Report for the Bank s prior review have been submitted on November 19, 2014. Resubmission on end of January 2015. 14 Bidding of packages 11 PMU • Contract awarded on December 18, 2014 15 Bidding of packages 13 PMU • Contract awarded on December 18, 2014 • Commencement of work will depend on LARAP implementation progress • Send weekly LARAP progress report to Bank every Monday