Packages 5 Simpang Rampa Poriaha AWP-2
1. Package No. 15 Sibolga Batas Tapsel AWP-3
This sub-project is included in the implementation schedule AWP-3. The project road is 36 kilometer long and located in the Province of Sumatera Utara. The Bank agreed on DGH to pilot the use of MPW s full e-procurement system, using the World Bank ICB Standard Bidding Documents SBD for procurement of works after incorporating in the ICB bidding documents for this package the changes required for use e-procurement system. The bidding documents are on-going finalization. It is expected that DGH can invite bids within this coming month of January 2015. 1.5 Procurement of Three 3 Consultancy Packages Under Category 3 of the Loan Agreement, Part 3 : Road Sector Institutional Development1. Technical Assistance for Capacity Building for Disaster Risk Reduction
Terms of Reference had been finalized with the incorporation of Bank s comments and formally submitted to World Bank for final review and issuance of No Objection Letter NOL. Standard Bidding Documents for ICB full e-procurement method is under final preparation. A practical demonstration to present how the e-procurement system for selection of consultants actually works in practice for the selection process is tentatively scheduled on the first working week of January 2015.2. Technical Assistance for Capacity Building for Environmental Management
Consultant still to be procured.3. Technical Assistance for Capacity Building for Road Safety
Consultant still to be procured.1.6 Consolidated Update of the Progress of the Project
Other brief updates of the pre-construction activities of this reporting month are shown in Table 1.1.Parts
» WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Visit WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Package 17 Sp. Gunung Kemala Pugung Tampak AWP-3.
» Package 11 Bantal Mukomuko AWP-2
» Package 13 Sp. Rukis Tj. Kemuning AWP-2
» Packages 5 Simpang Rampa Poriaha AWP-2
» Package No. 6 Pasar Pedati Kerkap AWP-2
» Package No.19 Lais Bintunan AWP-3
» Package No. 15 Sibolga Batas Tapsel AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» 16.08 33.73 24.38 WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» - 31.53 WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4 Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No. 13 : Sp. Rukis Tj. Kemuning
» Monitoring Report of the LARAP Package No. 14 : Painan - Kambang
» Monitoring Report of the LARAP Package No. 15 : Sibolga Bts. Tapsel
» Monitoring Report of the LARAP Package No.16 Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.24 2014 12 2014 12 11 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues