86
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Organization Structure
sEKRETARis PERUsAHAAN
CORPORATE sECRETARY
T. Ari Widiyantoro
DiREKTUR i DiRECTOR i
R. SOETANTO
DiREKTUR ii DiRECTOR ii
BAMBANG PRAMUSINTO
DIV.	PENGEMB.	JALAN	TOL		BISNIS		TOLL ROAD	AND	BUSINESS	DEVELOPMENT	DIVISION
M. Rizal Sutjipto
DIV.	GEDUNG		BUILDING	DIVISION
Koentjoro
DIV.	PENGEMB.	BISNIS	KONSTRUKSI CONSTRUCTION	BUSINESS		DEVELOPMENT	DIVISION
Erry Sugiharto
DIV.	JALAN	JEMBATAN ROAD	AND	BRIDGE	DIVISION
Suroto
DIV.	PRODUKSI		PRODUCTION	DIVISION
Aji Prasetyani
DIV.	EPC		EPC	DIVISION
Sigit Winarto
DIV.	SYSTEM		RISIKO SYSTEM		RISK	DIVISION
Tjahjo Purnomo
WiLAYAH i  REGiON i
Sarjono
DIV.	KEUANGAN		FINANCIAL	DIVISION
Moch. Kosim
WiLAYAH ii  REGiON ii
Ari Asmoko
DIV.	AKUNTANSI		ACCOUNTANT	DIVISION
Bambang Joko Sutarto
WiLAYAH iii  REGiON iii
Bambang Mustaqim
DIV.	SDMU HUMAN	RESOURCE	DIVISION
Wikumurti
WILAYAH	IV		REGION	IV
Eko Yulianto
WILAYAH	V		REGION	V
Agung Fajaryanto
WILAYAH	VI		REGION	VI
Manaf Sitorus
WILAYAH	VII	REGION	VIII
Y. Widi Suharyanto
HK REALTiNDO
M. Fauzan
HAKA AsTON
M. Ibnu fajar
HK TOL HK PRECAsT
Entitas Minoritas
DiREKTUR UTAMA  PREsiDENT DiRECTOR
I Gusti Ngurah Putra
s U
P P
O R
T iNG
B U
s iNE
s s
U Ni
T
HAKA	POLE		HAKA	PRIMA
Kriswandono  Efendi Ermandi
Kilas Kinerja 2014 Flashback Performance 2014
Analisis dan Pembahasan Manajemen Management Discussion and Analysis
Laporan Manajemen Management Report
Proil	Perusahaan
Company Proile Tinjauan Unit Pendukung
Supporitn Bussiness Review Tata Kelola Perusahaan
Good Corporate Governance Tanggung Jawab Sosial Perusahaan
Corporate Social Responsibility
8 7
A n
n u
a l R
ep or
t 2
1 4
| P
T H
U T
A M
A K
A R
YA P
e rs
e ro
s Pi
Ek w
an H
ad ya
nto
D iR
EKT U
R iii
D iR
EC T
O R
iii
SUGE N
G RO
CH ADI
D IR
EKT U
R	IV D
IR EC
TO R	IV
PUT UT
A RIW
IBO W
O
D IR
EKT U
R	V D
IR EC
TO R	V
AN IS
A N
JA YA
N I
88
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Group Structure
Pemerintah indonesia
100
PT Hutama Karya Persero
PT HK REALTiNDO
99,75
PT HAKAAsTON
99,75 PT HAKAPOLE
99,75
Perseroan tidak memiliki grup. Namun, struktur Perseroan beserta entitas anak sebagai berikut:
The Company does not have any group. However, the structure of the Company and its subsidiaries are as
follows:
Kilas Kinerja 2014 Flashback Performance 2014
Analisis dan Pembahasan Manajemen Management Discussion and Analysis
Laporan Manajemen Management Report
Proil	Perusahaan
Company Proile Tinjauan Unit Pendukung
Supporitn Bussiness Review Tata Kelola Perusahaan
Good Corporate Governance Tanggung Jawab Sosial Perusahaan
Corporate Social Responsibility
8 9
A n
n u
a l R
ep or
t 2
1 4
| P
T H
U T
A M
A K
A R
YA P
e rs
e ro
8 9
A n
n u
a l R
ep or
t 2
1 4
| P
T H
U T
A M
A K
A R
YA P
e rs
e ro
90
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
ACHMAD HERMANTO DARDAK
Komisaris Utama President Commissioner
Board of Commissioners Proile
Warga  Negara  Indonesia  ini  dilahirkan  di  Trenggalek,  9  Januari  1957, berumur  57  tahun.  Menjabat  Komisaris  Utama  berdasarkan  Surat
Keputusan  Menteri  Negara  BUMN  No.  SK-284MBU2012  tanggal 29  Oktober  2012.  Ia  memperoleh  gelar  Sarjana  di  Institut  Teknologi
Bandung  pada  tahun  1980,  gelar  Magister  di  University  of  New  South Wales, Sydney pada tahun 1985, gelar Doktor di University of New South
Wales, Sydney pada tahun 1990.
Ia  memulai  kariernya  pada  tahun  1980  sebagai  Staf  Dit.  Bipran  Ditjen Bina  Marga  selama  sepuluh  tahun.  Pada  tahun  1990-1993  ia  menjadi
Pjs.  Kepala  Bid.  Teknik  Jalan  Pusat  Litbang  Jalan,  Badan  Litbang  PU, Kepala  Bagian  Perencanaan  Lintas  Sektoral  Biro  Perencanaan,  Setjen
PU pada tahun 1993-1994, dan Kepala Bagian Perencanaan Umum Biro Perencanaan, Setjen PU pada tahun berikutnya. Selama 3 tahun, 1995-
1998 ia menjabat sebagai Kepala Biro Kerjasama Luar Negeri, Setjen PU dan  di  tahun  1998-1999  menjabat  sebagai  Kepala  Biro  Perencanaan,
Setjen  PU.  Hingga  pada  tahun  2005-2007  ia  menjadi  Direktur  Jenderal Penataan  Ruang  Departemen  PU  dan  Direktur  Jenderal  Bina  Marga
Departemen  PU  pada  tahun  2007-2009.  Sejak  tahun  2009  sampai sekarang, ia juga menjabat sebagai Wakil Menteri Pekerjaan Umum.
Indonesian citizen, born in Trenggalek,  January  9, 1957, aged 57 years old. He served as Comissioner in accordance with State Ministry for State-
Owned Enterprise Directive No. SK-284MBU2012 dated on October 29, 2012. He received a Bachelor degree at Bandung Institute of Technology
in 1980, Master degree at University of New South Wales, Sydney in 1985, and a Doctoral degree at University of New South Wales, Sydney in 1990.
He began his career in 1980 as a Bipran Staf Directorate at Bina Marga for  ten  years.  In  1990-1993  he  served  as  a  Head  of  Road  Engineering
at  Research  and  Development  Center  Roads  of  Public  Works  Ministry, Head of Intersectoral Planning in Planning Bureau, General Secretariat
of  Public  Works  in  1993-1994,  and  the  Head  of  General  Planning  of Planning Bureau, General Secretariate of Public Works in the following
year. For 3 years, from 1995 to 1998 he served as a Head of the Bureau of International cooperation, Secretariate General of Public Works, and in
1998-1999 he served as Head of Planning, Secretariate of Public Works. In 2005-2007 he became Director General of Bina Marga of the Department
of Public Works and the Director General of Bina Marga in Department of  Public  Works  in  2007-2009.  Since  2009  until  now,  he  also  serves  as
Deputy Minister of Public Works.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
91
Annual Report 2014 | PT HUTAMA KARYA Persero
Board of Commissioners Proile
MAX TAMAELA
Komisaris Independen Independent Commissioner
Warga Negara Indonesia ini dilahirkan di Amahai, Maluku pada 29 November  1947,  berumur  67  tahun.  Menjabat  sebagai  Komisaris
berdasarkan  Surat  Keputusan  Menteri  Negara  BUMN  No.  SK-284 MBU2012  tanggal 29 Oktober 2012. Tidak hanya belajar di sekolah
umum, ia juga pernah mengenyam pendidikan di sekolah militer di AKABRI 1970, SESKOAD 1985, SESKO ABRI 1993, dan LEMHAMNAS 1996.
Ia  memulai  kariernya  di  Tentara  Nasional  Indonesia  sebagai Kepala  Zeni  Kodam  Jaya  1993-1996,  Direktur  Fasilitas  dan
Jasa  DEPHANKAM  1996-1999,  Pangdam  XVIPatimura  Maluku 1999-  2001,  dan  Komandan  Pusat  Teritorial  TNI  AD  2001.  Pada
tahun  2001  menjadi  Anggota  DPR    MPR  RI,  Anggota  Pansus  UU Ketenagakerjaan  DPR  RI  2001-2002,  Anggota  Pansus  UU  Praktek
Kedokteran  DPR  RI  2002,  Anggota  Pansus  UU  Perlindungan  Anak DPR  RI  2002,  hingga  menjadi  Komisaris  di  PT  Hutama  Karya.
Indonesian  Citizen,  born  in  Amahai,  Maluku  on  November  29,  1947, aged  67  years  old.  Served  as  Commissioner  based  on  Decree  of
SOE  Minister  No.  SK-284MBU2012  dated  October  29,  2012.  Not only studied in public school, he also studied in military school
in  AKABRI  1985,  SESKO  ABRI  1993,  nad  LEMHAMNAS  1996. He began his career in the Tentara Nasional Indonesia as the Head of Zeni
Kodam Jaya 1993-1996, Director of Facilities and DEPHANKAM Services 1996-1999, Pangdam XVIPatimura Maluku 1999-2001, and Komandan
Pusat  of  the  Teritorial  TNI  AD  2001.  In  2001  he  became  a  member of House of RepresentativePeople’s Consultative Assembly, Member
of Special Committee on Labour Law 2001- 2002, Member of Special Committee on Medical Practice 2002, Member of Special Committee
on the child protection 2002, and a Commissioner of PT Hutama Karya.
92
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
MUKHAMAD TAUFIQ
Komisaris Commissioner
Warga Negara Indonesia ini dilahirkan di Batang, 14 Mei 1970, berumur 44  tahun.  Menjabat  sebagai  Komisaris  berdasarkan  Surat  Keputusan
Menteri  Negara  BUMN  No.  SK-238MBU102014  tanggal  17  Oktober 2014.  Ia  memperoleh  gelar  Sarjana  bidang  Manajemen  di  Universitas
Diponegoro  pada  tahun  1995  dan  gelar  Master  bidang  Ilmu  Hukum Ekonomi di Universitas Indonesia Jakarta pada tahun 2013.
Ia memiliki karier di Kementerian BUMN sejak 1996 sampai sekarang. Ia juga mendapatkan penugasan di beberapa BUMN sebagai Sekretaris
Dewan  Komisaris  PT  ASDP  Indonesia  Ferry  Persero  2003  -  2009, Sekretaris Dewan Komisaris PT Djakarta Lloyd Persero 2005 - 2013,
Komisaris Utama PT Pabrik Gula Candi Baru RNI Grup 2011 - 2013, Komisaris Mega Eltra PIHC Grup 2011 - 2014.
Indonesian  citizen,  born  in  Batang,  May  14,  1970,  aged  44  years  old. He served as a Commissioner based on State Ministry for State-Owned
Enterprise  Directive  No.  SK-238MBU2014  dated  on  October  17, 2014.  He  received  a  Bachelor  degree  of  Management  in  University  of
Diponegoro  in  1995,  and  Magister  of  Economics  Law  in  Univeristy  of Indonesia in 2013.
He started his career in State Ministry for State Owned Enterprise since 1996 until now. He also worked in several State Owned Enterprise as the
Board  of  Commissioners  of  PT  ASDP  Indonesia  Ferry  Persero  2003- 2009, the Board of Commissioner of PT Djakarta Lloyd Persero 2005-
2013,  the  Commissioner  of  PT  Pabrik  Gula  Candi  Baru  RNI  Group 2011-2013,  the  Board  of  Commissioner  of  Mega  Eltra  PIHC  Group
2011-2014.
Board of Commissioners Proile
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
93
Annual Report 2014 | PT HUTAMA KARYA Persero
Board of Commissioners Proile
MOHAMMAD IMRAN ZULKARNAIN DUKI
Komisaris Commissioner
Warga  Negara  Indonesia  ini  dilahirkan  di  Lampung,  16  Januari  1970, berumur  44  tahun.  Menjabat  sebagai  Komisaris  berdasarkan  Surat
Keputusan  Menteri  Negara  BUMN  No.  KEP-127MBU2012  tanggal 7  Maret  2012.  Ia  memperoleh  gelar  Sarjana  di  Universitas  Lampung
pada  tahun  1994,  gelar  Magister  Hitotsubashi  University,  Japan  pada tahun 2004, dan gelar Doktor di University of Gunma, Japan pada tahun
2000.
Ia memulai kariernya sebagai Asisten pengajar Biostastics, Public Health, and  Environment  Classes  di  University  of  Gunma  pada  tahun  1995-
1998.  Di  tahun  1998-1999  ia  sempat  magang  sebagai  Environmental Risk  Research  Division  di  Japan  National  Institute  of  Environmental
Studies NIES, Tsukuba, Japan. Pria berdomisili di Jakarta ini pun sempat menjadi penyiar dan Translator-Editor paruh waktu di Radio Japan, NHK
World.  Di  tahun  2003  ia  menjadi  Diplomat  Spesialis  Lingkungan  oleh Departemen Luar Negeri RI. Di tahun 2007-2009 ia menjabat sebagai
Researcher Health and Environment di Japan National Institute of Public Health, Wako, Japan. Menjadi konsultan di berbagai organisasi bisnis di
Jepang. Selain menjadi Komisaris di PT Hutama Karya, ia juga menjadi Sekretaris Bidang Ekonomi dan Lingkungan Hidup di Advisory Council
to the President of the Republic Indonesia sejak 2010.
Indonesian  citizen,  born  in  Lampung,  January  16,  1970,  aged  44.  He served  as  Commissioner  based  on  State  Ministry  for  State-Owned
Enterprise Directive No. KEP-127MBU2012 dated on March 7, 2012. He received a Bachelor degree at University of Lampung in 1994, a Master
degree  at  Hitotsubashi  University,  Japan  in  2004,  and  his  PhD  at  the University of Gunma, Japan in 2000.
He began his career as an assistant lecturer of Biostastics, Public Health, and Environment classes at the University of Gunma in 1995-1998. In
1998-1999 he was an intern in an Environmental Risk Research Division at Japan’s National Institute of Environmental Studies NIES, Tsukuba,
Japan.  He  lives  in  Jakarta  and  once  became  a  freelance  broadcaster and Translator-Editor on Japan Radio, NHK World. In 2003 he earned
a  Diploma  of  the  Environmental  Specialist  at  Department  of  Foreign Afairs. In 2007-2009 he served as Health and Environment Researcher
at  Japan’s  National  Institute  of  Public  Health,  Wako,  Japan.  He  also became a consultant in various business organizations in Japan. Besides
being  the  Commissioner  of  PT  Hutama  Karya,  he  also  becomes  the Secretary of Economy and the Environment at the Advisory council to
the President of the Republic of Indonesia since 2010.
94
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
ACHMAD BUDHI PATRIA
Komisaris Commissioner
Warga  Negara  Indonesia  ini  dilahirkan  di  Jakarta,  26  November  1958, berumur  66  tahun.  Menjabat  sebagai  Komisaris  berdasarkan  Surat
Keputusan  Menteri  Negara  BUMN  No.  SK-410MBU2012  tanggal  19 November  2012.  Ia  memperoleh  gelar  Sarjana  di  Universitas  Jayabaya
pada  tahun  1985  dan  gelar  Magister  di  STIE  IPWI  Jakarta  pada  tahun 1998.
Ia memulai kariernya di Departemen Perhubungan sejak 1990 sampai sekarang.  Bermula  menjadi  Staf  Bagian  Pengadaan  1990-1996,  ia
akhirnya menjadi Kasubag Inventarisasi 1996-2003. Pada tahun 2003- 2005 ia menjabat sebagai Kasubag Penghapusan, sedangkan pada tahun
2005-2011  menjabat  sebagai  Kabag  Perlengkapan.  Hingga  akhirnya, pada  tahun  2011  sampai  sekarang  menjabat  Karo  Keuangan  dan
Perlengkapan di Departemen Perhubungan dan Komisaris di PT Hutama Karya.
Indonesian  citizen,  born  in  Jakarta,  November  26,  1958.  He  served  as a  Commissioner  based  on  State  Ministry  for  State-Owned  Enterprise
Directive  No.  SK-410MBU2012  dated  on  November  19,  2012.  He received a Bachelor degree in Jayabaya University in 1985 and a Master
degree in STIE IPWI Jakarta in 1998.
He began his career at Department of Transportation since 1990 until now.  Started  career  as  a  Procurement  Section  staf  1990-1996,  he
eventually served as a Head of Inventory 1996-2003. In 2003-2005 he served  as  Head  of  Removal,  and  in  2005-2011  he  served  as  Head  of
Equipment.  In  2011-now,  he  served  as  a  Head  of  Finance  and  Supply Bureau at the Department of Transportation and a Commissioner of PT
Hutama Karya.
Board of Commissioners Proile
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
95
Annual Report 2014 | PT HUTAMA KARYA Persero
EDDY YUSBAR BADARUDDIN
Komisaris Commissioner
Warga  Negara  Indonesia  ini  dilahirkan  di  Prabumulih,  16  Juni  1947, berumur  67  tahun.  Menjabat  sebagai  Komisaris  berdasarkan  Surat
Keputusan  Menteri  Negara  BUMN  No.  SK-248MBU2013  tanggal  16 Mei 2013. Hingga tahun 2013, beliau juga menjabat sebagai Komisaris
PT  Semen  Baturaja  sejak  tahun  2008.  Sebelumnya,  beliau  telah berpengalaman menjabat berbagai posisi strategis diantaranya sebagai
staf Senior Dirut PT Semen Baturaja dari tahun 1999-2002, dan Direktur Komersial PT Semen Baturaja pada 1995-1999, dan Kepala Departemen
Niaga PT Semen Baturaja pada tahun 1991-1995.
Beliau  memperoleh  gelar  S1  Industri  dari  Institut  Teknologi  Bandung ITB Bandung pada tahun 1976.
Indonesian citizen, born in Prabumulih, June 16, 1947, aged 67. He served as a Commissioner based on State Ministry for State-Owned Enterprise
Directive No. SK-248MBU2013 dated on May 16, 2013. Until 2013, he served as a Commisioner of PT Semen Baturaja since 2008. He previously
served many strategic positions, such as Senior staf or President Director of  PT  Semen  Baturaja  from  1999¬-2002,  Director  of  commercial  at  PT
Semen Baturaja in 1995-1999, and Head of Commercial Department of PT Semen Baturaja in 1991-1995, and Head of Commerce in 1991-1995.
He  received  his  Bachelor  degree  majoring  Industrial  Engineering  from Bandung Institute of Technology in 1976.
Board of Commissioners Proile
96
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
I GUSTI NGURAH PUTRA
Direktur Utama President Director
Board of Directors Proile
Warga Negara  Indonesia ini dilahirkan di Gianyar,  pada 30 Juli 1959, berumur  55  tahun.  Menjabat  sebagai  Direktur  Utama  berdasarkan
Surat  Keputusan  Menteri  Badan  Usaha  Milik  Negara  No.  SK-165 MBU082014.  Ia  memperoleh  gelar  Sarjana  di  Universitas  Brawijaya
Jurusan  Teknik  Sipil  pada  tahun  1984  dan  gelar  Magister  di  Institute Manajemen Prasetya Mulya pada tahun 2004.
Ia  memulai  kariernya  di  PT  Waskita  Karya  Persero  Tbk,  pada  2001 menjabat sebagai Kepala Wilayah III, pada 2002-2008 menjabat sebagai
Kepala Wilayah II dan menjabat sebagai Direktur Produksi PT Waskita Karya  Persero  Tbk  pada  2008-2011.  Beliau  juga  pernah  menjabat
sebagai Direktur Utama PT Nindya Karya Persero pada 2011-2014.
Indonesian citizen, born in Gianyar on July 30, 1959, aged 55. He served as  the  President  Director  based  on  State  Ministry  for  State-Owned
Enterprise Decree No. SK-165MBU082014. He received his Bachelor degree  in  University  of  Brawijaya  majoring  Civil  Engineering  in  1984
and Magister degree in Institute Manajemen Prasetya Mulya in 2004.
He started his career in PT Hutama Karya Persero Tbk in 2011 as the Head of Regional III in 2011, as the Head of Regional II in 2002-2008
and  as  Director  of  Production  in  2008-2011.  He  also  once  served  as President Director of PT Nindya Karya Persero in 2011-2014.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
97
Annual Report 2014 | PT HUTAMA KARYA Persero
v
R. SOETANTO
Direktur I Direktur I
Board of Directors Proile
Warga Negara Indonesia ini dilahirkan di Pare, 28 April 1956, berumur 58 tahun. Menjabat sebagai Direktur Operasi I berdasarkan Surat Keputusan Menteri
Badan  Usaha   Milik   Negara   No.  KEP-111MBU2011. Ia  memperoleh gelar Sarjana di Institut Teknologi Bandung Jurusan Sipil  Perencanaan pada tahun 1980
dan gelar Magister di LPPM Jurusan Manajemen Pemasaran pada tahun 1989. Ia  memulai  kariernya  sebagai  pegawai  percobaan  di  PT  Hutama  Karya
selama  satu  tahun  pada  1980.  Diawali  sebagai  pegawai  percobaan  hingga menjadi Direktur Operasional I, ia sempat menduduki banyak jabatan di PT
Hutama Karya. Pria berdomisili di Jakarta Timur ini, sempat menjadi Kepala Unit Pelaksanaan 1982, Pegawai Organik Ahli Teknik Gol. E 1982-1989,
Kepala Bagian Pengendalian Karya 1989-1992, Wakil Kepala Cabang + Kabag Pengendalian Karya 1992-1993, Kepala Proyek + Wakil Kepala CABANG XII
Irian Jaya 1993-1995, Staf Muda Bidang PelaksanaanOperasional Biro KSO 1995-1997, dan Staf Direktorat Operasi II 2002-2003. Ia juga sempat menjadi
Kepala  Proyek  selama  tahun  2003-2004.  Di  tahun  2008-2009  ia  sebagai General Manager Divisi Pengembangan dan General Manager Divisi Sumber
Daya di tahun 2009-2010. Setelah itu, selama setahun ia juga sempat menjadi Direktur Utama PT HAKAASTON, hingga akhirnya menjadi Direktur Operasi I.
Beliau  juga  sempat  menjalankan  beberapa  proyek  antara  tahun 1980-2004,  di  antaranya  Survey  Perbaikan  Jln.  Jember  –  Situbondo  –
Banyuwangi,  Overlay  Jalan  Jayapura  dengan  Hotmix,  Rehabilitasi  Jalan Sentani  -  Genyem  dengan  Burda,  Pembangunan  Pintu  Air  Rumah
Sakit  Merauke,  Pembangunan  Landasan  Pelabuhan  Udara  Mopah, Pengaspalan  Jalan  Maruni  Oransbari,  Perpanjangan  dan  Pelebaran
Land.  Pelabuhan  Udara  Sentani,  Pelebaran  Appron    Taxi  way  Bandara Frans  Kaisepo,  Pembangunan  Kampus  IPB  Paket  A-I  THP-2,  dan  lain-lain.
Indonesian  citizen,  born  in  Pare,  April  28,  1956,  aged  58.  He  served  as the  Director  of  Production  I  based  on  State  Ministry  for  State-Owned
Enterprise Directive No. KEP-111MBU2011. He received a Bachelor degree in  Bandung  Institute  of  Technology  majoring  Civil  Engineering  in  1980
and  Magister  degree  in  LPPM  majoring  Marketing  Management  in  1989. He started his career as a trial employee in PT Hutama Karya for a year in
1980. Started from a trial employee to the Director of Operational I, he served many positions in PT Hutama Karya. He lives in East Jakarta, and once served
as  a  Head  of  Implementation  Unit  1982,  employee  of  organic  engineers class. E 1982-1989, Head of Controlling Work 1989-1992, Branch Deputy
+ Head of Controlling Work 1992-1992, Head of Project + Deputy of Brancg XII Irian Jaya 1993-1995, staf of Operational of KSO Field 1995-1997, and
staf  of  Director  of  Operational  II  2002-2003.  He  also  served  as  General Manager of Develoment Division and General Manager of Human Resource
Development in 2009-2010. Besides, he also served as the President Director of PT HAKAASTON for a year, until he serves as the Director of Operational I.
He  conducts  several  projects  between  1980-2004,  including  the improvement survey of Jl. Jember - Situbondo - Banyuwangi road, Jayapura
Road  Overlay  with  hotmix,  Sentani  Road  improvement-  Genyem  with Burda, the development of Merauke Hospital’s Air Doors, the development
of  Mopah  Air  Port  Landing  Strip,  the  Maruni  Oransbari  road  asphalting, Sentani  Landing  Strip’  widening  road,  Appron    Taxi  way  widening  of
Frans  Kaisepo  Airport,  IPB  Campus  Development  Package  A-I  THP-2,  etc.
98
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Warga  Negara  Indonesia,  lahir  pada  11  September  1959,  berumur 55  tahun.  Menjabat  sebagai  Direktur  berdasarkan  Surat  Keputusan
Menteri  Badan  Usaha  Milik  Negara  No.  SK-165MBU082014.  Ia memperoleh  gelar  Sarjana  di  Institut  Teknologi  Bandung  jurusan
Teknik Sipil pada 1983.
Ia  pernah  menjabat  berbagai  posisi  di  PT  Adhi  Karya  Persero  Tbk yakni sebagai Kepala Cabang VII Balikpapan 2000 - 2007. Kemudian
pernah menduduki posisi lain seperti Kepala Divisi Konstruksi II 2007 - 2010 dan Direktur Operasi II 2010-2014 di perusahaan yang sama.
Indonesian  citizen,  September  11,  1958,  aged  55.  He  served  as  the Director based on State Ministry for State-Owned Enterprise Directive
No. SK-165MBU082014. He received Bachelor degree from Bandung Institute of Technology majoring Civil Engineering in 1983.
He  served  several  positions  in  PT  Adhi  Karya  Persero  Tbk,  which are  Head  of  Branch  VII  Balikpapan  2000-2007,  Head  Division  of
Construction II 2007-2010 in the same Company.
Board of Directors Proile
BAMBANG PRAMUSINTO
Direktur II Direktur II
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
99
Annual Report 2014 | PT HUTAMA KARYA Persero
Board of Directors Proile
Warga  Negara  Indonesia,  lahir  pada  21  Februari  1966,  berumur  49 tahun.  Menjabat  sebagai  Direktur  berdasarkan  Surat  Keputusan
Menteri  Badan  Usaha  Milik  Negara  No.  SK-222MBU102014.  Ia memperoleh  gelar  Sarjana  di  Universitas  Merdeka,  Malang  jurusan
Teknik Sipil pada 1990.
Ia  memiliki  pengalaman  di  berbagai  posisi  di  PT  Brantas  Abipraya Persero yakni sebagai Kepala Proyek Lankeme, Pinrang dan Sulawesi
Utara 1992–1997. Kemudian pernah menduduki posisi seperti Kepala Cabang III Surabaya 2003–2004, Kepala WIlayah III Surabaya 2004–
2009, Kepala Divisi Produksi II 2009–2011, Kepala Biro Perencanaan dan  Pengendalian  Produksi  2011–2012,  serta  menjadi  General
Manager Produksi di Departemen Produksi 2012–2014 di PT Brantas Abipraya Persero.
Indonesian citizen, born in February 21, 1866, aged 49. He served as the Director based on State Ministry for State-Owned Enterprise Decision
No. SK-222MBU102014. He received a Bachelor degree in University of Merdeka, Malang, majoring Civil Engineering in 1990.
He has worked in various positions in PT Brantas Abipraya Persero as Head of Projects in Lankeme, Pinrang, and North Sulawesi 1992-1997.
He  once  held  position  as  Head  of  Branch  III  Surabaya  2003-2004, Head of Regional III Surabaya 2004-2009, Head of Production Division
II 2009-2011, Head of Planning and Production Control Bureau 2011- 2012, and General Manager of Production of Production Department
2012-2014 at PT Brantas Abipraya Persero.
SUGENG ROCHADI
Direktur III Director III
100
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Board of Directors Proile
PUTUT ARIWIBOWO
Direktur IV Director IV
Warga Negara Indonesia, lahir pada 11 April 1965, berumur 49 tahun. Menjabat sebagai berdasarkan Surat Keputusan Menteri Badan Usaha
Milik Negara No. SK-222MBU102014. Ia memperoleh gelar Sarjana di Univeritas Gajah Mada jurusan Teknik Sipil pada 1990 dan Magister di
Sekolah Tinggi Manajemen PPM pada 2008.
Ia  memulai  kariernya  di  PT  Hutama  Karya  Persero  sebagai  General Manager  Divisi  Pengembangan  2009.  Kemudian,  menduduki  posisi
lain seperti General Manager Divisi Penunjang Usaha PT Hutama Karya Persero  2009  dan  Direktur  Utama  PT.  HK  Realtindo  2010  -  2014
sebelum akhirnya menjabat sebagai Direktur di Perseroan.
Indonesian  citizen,  born  on  April  11,  1965,  aged  49.  He  served  as  the Director based on State Ministry for State-Owned Enterprise Decree No.
SK-222MBU102014.  He  received  a  Bachelor  degree  in  University  of Gajah Mada majoring Civil Engineering in 1990 and Master degree in
Sekolah Tinggi Manajemen PPM in 2008.
He  started  his  career  in  PT  Hutama  Karya  Persero  as  the  General Manager of Development Division 2009. He served several positions,
that are General Manager of Supporting Business Division of PT Hutama Karya Persero 2009 and President Director of PT HK Realtindo 2010-
2014 before serving as the Director of the Company.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
101
Annual Report 2014 | PT HUTAMA KARYA Persero
ANIS ANJAYANI
Direktur V Director V
Warga  Negara  Indonesia,  lahir  pada  21  Oktober  1961,  berumur  53 tahun.  Menjabat  sebagai  Direktur  berdasarkan  Surat  Keputusan
Menteri  Badan  Usaha  Milik  Negara  No.  SK-165MBU082014.  Ia memperoleh gelar Sarjana di Universitas Diponegoro pada 2000.
Ia  pernah  menjabat  berbagai  posisi  di  PT  Adhi  Karya  Persero  Tbk yakni sebagai Kepala Divisi Keuangan 2011 - 2014, Komisaris PT Adhi
Persada  Gedung  2014,  dan  Direktur  V  Pengembangan  Bisnis  dan Manajemen Resiko 2014.
Indonesian  citizen,  born  on  October  21,  1961,  aged  53.  She  served as  the  Director  based  on  State  Ministry  for  State-Owned  Enterprise
Directive  No.  SK-165MBU082014.  She  received  Bachelor  degree  in University of Diponegoro in 2000.
She  served  several  positions  in  PT  Adhi  Karya  Persero  Tbk,  which are Head of Financial Division 2011-2014, Commissioner of PT Adhi
Persada Gedung 2014, and the Director V of Business Development and Risk Management 2014.
Board of Director Proile
102
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Proile of Division Below the Board of Directors
AJI PRASETYANI
GM Teknik dan Produksi General Manager of Technique and Production
Wanita  kelahiran  Pati,  2  Agustus  1971,  memperoleh  gelar Sarjana  Teknik  di  Universitas  Diponegoro  pada  tahun  1996
kemudian melanjutkan Strata 2 di Institut Teknologi Bandung pada tahun 1998.
Ia memulai kariernya di Perseroan sejak tahun 1995 sebagai Staf  hingga  menjadi  PLH  Genenral  Manager  Teknik  dan
Produksi Direktorat Operasi I, II, III di Jakarta tahun 2014. Ia juga memiliki pengalaman di beberapa proyek Perseroan
yang berada di wilayah V daerah Jawa Tengah, Jogjakarta dan Kalimantan.
Born in Pati, August 2, 1971, received Bachelor of engineering in University of Diponegoro in 1996, and continued her study
of Magister in Bandung Institute of Technology, Bandung, in 1998.
She started her career in the Company since 1995 as a staf to  PLH  General  Manager  of  Technique  and  Production  of
Directorate I, II, III in Jakarta in 2014. She also has experiences in several Company’s projects in Regional V Central Java,
Jogjakarta and Kalimantan.
ERRY SUGIHARTO
GM Pengembangan Bisnis Konstruksi General Manager of Construction Business Development
Pria kelahiran Kulonprogo, 25 Maret 1974, memperoleh gelar Sarjana  Teknik  di  Universitas  Islam  Indonesia,  pada  tahun
1999.
Ia memulai kariernya di Perseroan sejak tahun 1999 sebagai Staf hingga menjadi General Manager, Direktorat Operasi I,
II,  III  tahun  2013.  Ia  juga  memiliki  pengalaman  di  beberapa proyek Perseroan, diantaranya;
•  Proyek  Jembatan  Mahakam  di  Tenggarong  Kalimantan
Timur •  Proyek Irigasi Serayu Gambarsari
•  Proyek Jembatan Ngabang-Landak di Kalimantan Barat •  Proyek Track Baru HTD JO Tegal
•  Proyek Jembatan Gebang •  Proyek  Pembangunan  Jalan  Baru  Pare-Pare  II  Sulawesi
Selatan •  Proyek Jalan Tol Mojokerto - Kertosono
•  Suramadu  Bridge  Project  Consortium  of  Indonesian Contractor CIC
Born  in  Kulonprogo,  March  25,  1974,  received  Bachelor  of engineering in Universitas Islam Indonesia in 1999.
He started his career in the Company since 1999 as a staf to General Manager of Regional IV, Operational Directorate II in
2013. He also has experiences in several Company’s projects, such as:
•  Project of Mahakam Bridge in Tenggarong, East Kalimantan •  Project of Serayu Gambarsari Irrigation
•  Project of Ngabang-Landak Bridge in West Kalimantan •  Project of New Track of HTD JO Tegal
•  Project of Gebang Bridge •  Project of the improvement of Pare-Pare II Road, West
Sulawesi •  Project of Mojokerto-Kertosono Toll Road
•  Project  of  Suramadu  Bridge  Consortium  of  Indonesian Contractor CIC
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
103
Annual Report 2014 | PT HUTAMA KARYA Persero
Proile of Division Below the Board of Directors
BAMBANG JOKO SUTARTO
GM Akuntansi General Manager of Accounting
Pria  kelahiran  Sukoharjo,  6  April  1969,  memperoleh  gelar Sarjana  Akuntansi  di  Universitas  Yapis,  Papua  pada  tahun
2008.
Ia memulai kariernya di Perseroan sejak tahun 1991 sebagai Staf hingga menjadi General Manager Akuntansi, Direktorat
Keuangan tahun 2014. Ia juga memiliki pengalaman di proyek Perseroan, sebagai Koordinator Akuntansi  PPDSMMK3L di
Kantor Cabang VI-C di Jayapura.
Born  in  Sukoharjo,  April  6  1969,  received  Bachelor  of Accounting in University of Yapis, Papua in 2008.
He  started  his  career  in  the  Company  in  1991  as  a  staf  to General  Manager  of  Accountant,  Directorate  of  Financial  in
2014. He also has experiences in the Company’s projects as Accountant  Coordinator    PPDSMMK3L  in  branch  oice  of
VI-C in Jayapura.
MOCH. KOSIM
GM Keuangan General Manager of Financial
Pria kelahiran Jakarta, 27 Juli 1961, memperoleh gelar Sarjana Teknik di Universitas Muslim Indonesia, pada tahun 1991.
Ia memulai kariernya di Perseroan sejak tahun 1980 sebagai Staf hingga menjadi General Manager Keuangan, Direktorat
Keuangan tahun 2013.
Born  in  Jakarta,  July  27,  1961,  received  a  Bachelor  of engineering in  Universitas Islam Indonesia in 1991.
He started his career in the Company since 1980 as a staf to General Manager of Financial, Directorate of Financial 2013.
104
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Proile of Division Below the Board of Directors
M. RIZAL SUTJIPTO
GM Pengembangan Bisnis dan Jalan Tol G
eneral Manager of Business and Toll Road Development
Pria  kelahiran  Magelang,  10  Juni  1963,  memperoleh  gelar Sarjana  Teknik  di  Universitas  Sains  dan  Teknologi  Nasional,
Jakarta pada tahun 1988 kemudian melanjutkan Strata 2 di Universitas Mulawarman, Samarinda pada tahun 2004.
Ia memulai kariernya di Perseroan sejak tahun 1988 sebagai Staf hingga menjadi General Manager Pengembangan Bisnis
dan  Jalan  Tol,    tahun  2014.  Ia  juga  memiliki  pengalaman  di beberapa proyek Perseroan, diantaranya;
•  Proyek  Sistem  Penyediaan  Air  Bersih  Sederhana  SIPAS
Kab. Pati, Rembang  Blora di Kalimantan Timur •  Proyek Toll Cawang - Tj. Priok NS Link Jakarta
•  Proyek Rehabilaitasi dan Pemeliharaan Jalan di DPU Jakarta •  Proyek Putri Hijau Flyover pada PT. Hutama Karya Cabang
XIV Usaha Khusus “PRESTRESSED” di Jakarta •  Proyek Pembangunan Jembatan Barelang
•  Proyek Toll Cikunir - Cakung •  Proyek Gedung BPD tanah Grogot
Born  in  Magelang,  June  10,  1963,  received  Bachelor  of Engineering in National Institute of Science and Technology,
Jakarta  in  1998,  continued  her  Magister  in  University  of Mulawarman, Samarinda in 2004.
He started his career in the Company since 1988 as a staf to General Manager of Business and Toll Road Development
in 2014. He also has experiences in the Company’s projects, such as:
•  Project of SIPAS Sistem Penyediaan Air Bersih Sederhana
in Pati, Rembang  Blora, East Kalimantan •  Project of Cawang-Tj. Priok Road Toll NS Link Jakarta
•  Project  of  Road  Improvement  and  Maintenance  in  DPU Jakarta
•  Project of Putri Hijau Flyover at PT Hutama Karya branch XIV Special Business “PRESTRESSED” in Jakarta
•  Project of Barelang Bridge Development •  Project of Cikunir-Cakung Road Toll
•   Project of BPD Building Grogot
WIKUMURTI
GM SDM  Umum General Manager of Human Capital  General Afair
Pria  kelahiran  Bandung,  25  Mei  1970,  memperoleh  gelar Strata  1  di  Universitas  Brawijaya,  Malang  pada  tahun  1993
kemudian melanjutkan Strata 2 di IPWI, Jakarta pada tahun 1998.
Ia memulai kariernya di Perseroan sejak tahun 1994 sebagai Staf  hingga  menjadi  General  Manager  SDM    Umum
merangkap  General  Manager  Sistem    Risiko,  tahun  2014. Ia juga memiliki pengalaman di beberapa proyek Perseroan,
diantaranya; •  Proyek Taman Mini Junction
•  Proyek Jalan Tol Cikunir - Cakung
Born  in  Bandung,  May  25,  1970,  received  Bachelor  degree in  University  of  Brawijaya,  Malang  in  1993,  continued  his
Magister in IPWI in 1998.
He started his career in the Company since 1994 as a staf to General Manager of Human Capital and General Afair as well
as  General  Manager  of  System    Risk  in  2014.  He  also  has experiences in several Company’s projects, such as:
•  Project of Taman Mini Junction •  Project of Cikunir-Cakung Road Toll
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
105
Annual Report 2014 | PT HUTAMA KARYA Persero
Proile of Division Below the Board of Directors
T. ARI WIDIYANTORO
Sekretaris Perusahaan Corporate Secretary
EKWAN HADYANTO
Kepala SPI Head of SPI
Pria kelahiran Jakarta, 8 Maret 1964, memperoleh gelar Strata 1  di  Universitas  Krisnadwipayana,  Jakarta  pada  tahun  1996
kemudian melanjutkan Strata 2 di Filipina pada tahun 1998.
Ia memulai kariernya di Perseroan sejak tahun 1987 sebagai Staf hingga menjadi Sekretaris Perusahaan sampai saat ini.
Ia juga memiliki pengalaman di beberapa proyek Perseroan, diantaranya:
•  Proyek Jalan Tol Jakarta - Tangerang •  Proyek North South Inter Urban Toll Expressway Yong Peng
- Ayer Hitam, Malaysia •  Proyek Pembangunan Chimneys di Suralaya
•  Proyek Skyway di Manila, Filipina
Born in Jakarta, March 8, 1964, received a Bachelor degree in University of Krisnawipayana, Jakarta in 1996, continued his
Magister in Philippines in 1998.
He started his career in the Company since 1987 as a staf to the Corporate Secretary. He also has several experiences,
such as: •  Project of Jakarta-Tangerang Road Toll
•  Project of North South Inter Urban Toll Expressway Young
Peng – Ayer Hitam, Malaysia •  Project of Chimneys Improvement in Surabaya
•  Project of Skyway in Manila, Philippines Warga  Negara  Indonesia  ini  dilahirkan  di  Grobogan,  25
Mei 1973, berumur 44 tahun. Ia memperoleh gelar Sarjana Teknik di Universitas Diponegoro pada tahun 1996 dan gelar
Magister Management pada kampus yang sama di tahun 2008.
Ia memulai karier sejak tahun 1996 sebagai Staf Site Engineer Project  Engineer  Hutama  Karya  pada  tahun  1996.  Pada
tahun  1996-1999  ia  menjadi  Staf  Bagian  Teknik  Cabang  VII. Sejak  2001  hingga  2004  menjadi  Site  Operation  Manager
SOM di beberapa proyek Hutama Karya kemudian menjadi Kepala Proyek dalam rentang waktu 2004-2005. Pada tahun
2008  hingga  2011  menjabat  manager  dan  Senior  Manager pada  Divisi  Pengembangan  Hutama  Karya.    Dan  mulai
menjabat General Manager sejak tahun 2012 dengan posisi saat ini sebagai Kepala SPI Hutama Karya.
Indonesian citizen, born in Grobogan, May 25, 1973, aged 44. Received Bachelor of Engineering in University of Diponegoro
in 1996, and his Magister Management in the same campus in 2008.
He started his career since 1996 as a Site  Engineer  Project Engineer Hutama Karya staf on 1996. In 1996-1999, he was
a  staf  of  branch  engineering  VII.  Since  2001-2004,  he  was a  Site  Operation  Manager  SOM  in  several  Hutama  Karya’s
projects,  after  that  he  became  Head  of  Projcet  in  between 2004-2005. In 2008-2011 he served as a Manager and Senior
Manager in the division of Hutama Karya Development. He started to serve as General Manager since 2012 with his
current position as Head of SPI Hutama Karya.
106
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Proile of Division Below the Board of Directors
SARJONO
GM Wilayah I General Manager of Regional I
TJAHJO PURNOMO
GM Sistem Risiko General Manager of System  Risk
Pria  kelahiran  Surakarta,  24  Maret  1966,  memperoleh gelar  Sarjana  Teknil  Sipil  di  Universitas  Diponegoro  pada
tahun  1990.  Kemudian,  melanjutkan  Strata  2  di  Universitas Mulawarman pada tahun 2007.
Memulai karier di Perseroan sejak tahun 1994 sebagai Staf hingga menjadi PJ GM Sistem  Risiko pada Direktorat IV pada
2014. Memiliki berbagai pengalaman di beberapa proyek Perseroan diantaranya:
•  Manager Operasional Proyek The Grove  Media Walk di Jakarta. •  Deputy Project Manager Proyek Renovasi  perbaikan KP Gedung
Pertamina di Jakarta •  Project  Manager  Proyek  Perbaikan  Masjid  Raya  Tangerang  di
Jakarta. •  Deputy  Project  Manager  Proyek  Perbaikan  M  Tangerang  Masjid
Raya Tangerang di Jakarta. •  Project Manager Proyek Kayamas Residence di Jakarta
•  Project Manager Pemangunan Asrama atlet Sempaja Samarinda.
Born  in  Surakarta,  March  24,  1966,  received  Bachelor  of Civil  Engineering,  continued  his  Magister  in  University  of
Mulawarman in 2007. He started his career in the Company since  1994  as  a  staf  to  General  Manager  of  System    Risk
in  Directorate  IV  in  2014.  He  has  experiences  in  several Company’s projects, such as:
•  Operational Manager of The Grove  Media Walk Project
in Jakarta •  Deputy  Project  Manager  of  Renovation    Improvement
Project of KP Pertamina Building in Jakarta •  Project Manager of the Improvement M Tangerang Project,
Masjid Raya Tangerang in Jakarta •  Project Manager of Kayamas Residence Project in Jakarta
•  Project Manager Proyek Kayamas Residence di Jakarta •  Project  Manager  of  Athlete  Dormitory  of  Sempaja
Samarinda Improvement
Pria  kelahiran  Bojonegoro,  28  September  1968,  memperoleh  gelar Sarjana  Teknik  di  Universitas  Brawijaya  pada  tahun  1992  kemudian
melanjutkan Strata 2 di Universitas Sumatera Utara pada tahun 2011.
Ia  memulai  kariernya  di  Perseroan  sejak  tahun  1996  sebagai  Staf hingga menjadi General Manager Wilayah I, Direktorat Operasi I  tahun
2014. Ia juga memiliki pengalaman di beberapa proyek Perseroan, diantaranya:
•  Proyek Pembangunan Jalan Suak Kandis-Simpang di Jambi •  Proyek Penggantian Jembatan Muaro  Penjalinan OP-08 di Padang
•  Proyek pemeliharaan Jalan Paket BPJP-03 di Sijunjung •  Proyek Peningkatan Jalan Komplek BPP Rawang di Sawahlunto
•  Proyek Penggantian Jemb. Ma.Penjalinan OP-08 Lanjutan di Padang •  Proyek Peningkatan Jalan Paket KB 114, KB115 di Sijunjung
•  Proyek  Peningkatan  Jalan  Bukittinggi-Payakumbuh  Pkt  BS-78
Bukittinggi •  Proyek Penggantian Jembatan Limau Manis Padang
•  Proyek Lanjutan Pembangunan Jembatan Siti Nurbaya Padang •  Proyek  Pembangunan  Jalan  dan  Jembatan  di  Areal  PT.  Rimba
Sungkyong Padang •  Proyek Jembatan Siak Sri Indrapura Riau
•  Proyek Jembatan Kelok 9 Padang •  Proyek Bandara Kualanamu
Born in Bojonegoro, September 28, 1968, received Bachelor of engineering in University of Brawijaya in 1992, continued
his Magister in University of Sumatera Utara in 2011.
He started his career in the Company since 1996 as a staf to  General  Manager  of  Regional  I  in  2014.  He  also  has
experiences in several Company’s project, such as:
•  Project of Suak Kandis-Simpang Road Construction in Jambi •  Project  of  the  Replacement  of  Muaro  Penjalinan  OP-08  Bridge  in
Padang •  Project of the maintenance of Paket BPJP-03 Road in Sijunjung
•  Project  of  the  Improvement  of  BPP  Rawang  Residence  Road  in Sawahlunto
•  Continuation project of Ma.Penjalinan OP-08 Bridge Replacement in Padang
•  Project  of  the  Improvement  of  KB  114,  KB115  Package  Road  in Sijunjung
•  Project  of  the  Improvement  of  Bukittinggi-Payakumbuh  Road  Pkt BS-7B in Bukittinggi
•  Project of the Replacement of Limau Manis Bridge in Padang •  Project  of  the  Continuity  Development  of  Siti  Nurbaya  Bridge  in
Padang •  Project of the Construction of  Road and Bridge in the area of PT
Rimba Sungkyong Padang •  Project of Siak Sri Indrapura Bridge in Riau
•  Project of Kelok 9 Bridge in Padang •  Project of Kualanamu Airport
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
107
Annual Report 2014 | PT HUTAMA KARYA Persero
Proile of Division Below the Board of Directors
ARI ASMOKO
GM Wilayah II General Manager of Regional II
Pria  kelahiran  Solo,  19  September  1965,  memperoleh  gelar Sarjana Teknik di Universitas Sebelas Maret, Surakarta pada
tahun 1991.
Ia memulai kariernya di Perseroan sejak tahun 1993 sebagai Staf hingga menjadi General Manager Wilayah II, Direktorat
Operasi  I  tahun  2014.  Ia  juga  memiliki  pengalaman  di beberapa proyek Perseroan, diantaranya;
•  Proyek Rumah Susun Perumnas Tanjung Diayu dan proyek
Pembagunan Gedung Walikotamadya Batam Center •  Proyek - proyek yang berada Pulau Batam dan Kualanamu,
Sumatera  Utara  serta  Terminal  Multipurpose  Inggom Pelabuhan Tanjung Priok.
Born  in  Solo,  September  19,  1965,  received  a  Bachelor  of engineering in University of Sebelas Maret, Surakarta, in 1991.
He started his career in the Company since 1993 as a staf to General Manager of Regional II, Operational Directorate I in
2014. He also has experiences in several Company’s projects, such as:
•  Project  of  Rumah  Susun  Perumnas  Tanjung  Diayu  and
project  of  the  construction  of  Walikotamadya  Building  in Batam Center
•  The  projects  in  Pulau  Batam  and  Kualanamu,  North Sumatera  as  well  as  Multipurpose  Terminal  of  Inggom  in
Pelabuhan Tanjung Priok
BAMBANG MUSTAQIM
GM Wilayah III General Manager of Regional III
Pria  kelahiran  Jepara,  7  Februari  1969,  memperoleh  gelar Sarjana Teknik di Universitas Diponegoro, pada tahun 1993
kemudian melanjutkan Strata 2 di Universitas Mulawarman, Samarinda pada tahun 2006.
Ia memulai kariernya di Perseroan sejak tahun 1993 sebagai Staf hingga menjadi General Manager Wilayah III, Direktorat
Operasi  I  tahun  2014.  Ia  juga  memiliki  pengalaman  di beberapa proyek Perseroan, diantaranya;
•  Proyek Jembatan Rumpiang Kalsel •  Proyek Dermaga Tenggarong Kaltim
•  Proyek Perkuatan Tebing Sungai Mahakam •  Proyek Jemb. Mahakam II Kaltim
•  Poyek Jalan Tapin Kalsel •  Proyek Jembatan Dr. Ir Soekarno Menado
Born  in  Jepara,  February  7,  1969,  received  Bachelor  of engineering  in  University  of  Diponegoro  in  1993,  continued
his  Magister  in  University  of  Mulawarman,  Samarinda,  in 2006.
He started his career in the Company since 1993 as a staf to General  Manager  of  Regional  III,  Operational  Directorate  in
2004. He also has experiences in several Company’s projects, such as: • Project of Rumpiang Bridge in West Kalimantan
•  Project of Tenggarong Port in East Kalimantan •  Project of the reinforcement of Tebing Sungai   Mahakam
•  Project of Mahakam II Bridge in East Kalimantan •  Project of Tapin Road in West Kalimantan
•  Project of Dr. Ir Soekarnoa Bridge in Manado
108
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Proile of Division Below the Board of Directors
EKO YULIANTO
GM Wilayah IV General Manager of Regional IV
AGUNG FAJARYANTO
GM Wilayah V General Manager of Regional V
Pria  kelahiran  Surabaya,  24  Maret  1973,  memperoleh  gelar Sarjana Teknik di Universitas Diponegoro pada tahun 1996. Ia
memulai kariernya di Perseroan sejak tahun 1996 sebagai Staf hingga  menjadi  Senior  Manager  pada  bagian  Teknik,  Divisi
Jalan dan Jembatan tahun 2014. Ia juga memiliki pengalaman di beberapa proyek Perseroan, diantaranya;
•  Proyek Jalan Palur - Sragen - Mantingan, Surakarta •  Proyek  Saluran  Irigasi  Colo  Barat-Proyek  Bengawan  Solo
BPS di Surakarta •  Proyek Irigasi Bengawan Solo
•  Proyek Jembatan Serenan •  Proyek  Rehabilitasi  Jaringan  Irigasi  dan  Bangunan  Air,
Peningkatan  dan  Rehabilitasi  Irigasi  Bangunan  Air, Peningkatan Jalan Colo BaratTimur
•  Proyek Jembatan Kaliprogo di Magelang •  Proyek Jembatan Musi II di Palembang
Born  in  Surabaya,  March  24,  1973,  received  Bachelor  of engineering in University of Diponegoro in 1996.
He started his career since 1996 as a staf to Senior Manager in the ield of Engineer, Road and Bridge Division in 2014. He
also has experiences in several Company’s projects, such as: •  Project of Palur- Sragen – Mantingan Road in Surakarta
•  Project of Colo Barat Irrigation Canal - Project of Bengawan
Solo BPS in Surakarta •  Project of Bengawan Solo Irrigation
•  Project of Serenan Bridge •  Project of Irrigation Canal Improvement, Irrigation
Rehabilitation  and  Improvement,  Colo  BaratTimur  Road Improvement
•  Project of Kaliprogo Bridge in Magelang •   Project of Musi II Bridge in Palembang
Pria  kelahiran  Pati,  1  Juli  1970,  memperoleh  gelar  Sarjana Teknik di Universitas Diponegoro, pada tahun 1994 kemudian
melanjutkan Strata 2 di Universitas Mulawarman, Samarinda pada  tahun  2007.  Ia  memulai  kariernya  di  Perseroan  sejak
tahun 1994 sebagai Site Engineer Manager hingga menjadi General Manager Wilayah IV, Direktorat Operasi II tahun 2013.
Ia juga memiliki pengalaman di beberapa proyek Perseroan, diantaranya;
•  Proyek  Sistem  Penyediaan  Air  Bersih  Sederhana  SIPAS
Kab. Pati, Rembang  Blora di Kalimantan Timur •  Proyek Jaringan Irigasi Air Tanah JIAT Kabupaten Blora di
Kalimantan Timur •  Proyek Rehabilitasi Normalisasi Kali Banger di Kalimantan
Timur •  Proyek Rehabilitasi Waduk Klego  Gembong di Kalimantan
Timur •  Proyek Jemb. Mahakam II Kaltim
•  Proyek Jalan Tapin Kalsel •  Proyek Jembatan Dr. Ir Soekarno Menado
•  Proyek Pengadaan dan Pemasangan Pipa Interseptor
Sewerage System-1 di Kalimantan Timur •  Proyek Jembatan Bathokan di Kalimantan Timur
•  Proyek Stadion Kabupaten Kendal •  Proyek Pembangunan Jalan Lingkar Nagreg IV di Bandung
Born in Pati, July 1, 1970, received a Bachelor of engineering in University of Diponegoro in 1994 as a Site Engineer Manager
to General Manager of Regional IV, Operational Directorate II  in  2013.  He  also  has  experiences  in  several  Company’s
projects, such as: •  Project of SIPAS Sistem Penyediaan Air Bersih Sederhana
in Pati, Rembang  Blora in East Kalimantan •  Project  of  JIAT  Jaringan  Irigasi  Air  Tanah  in  Blora,  East
Kalimantan •  Project of the Rehabilitation of Banger River Normalization
in East Kalimantan •  Project of the Rehabilitation of Waduk Klego  Gembong
in East Kalimantan •  Project of Mahakam II Bridge in East Kalimantan
•  Project of Tapin Road in West Kalimantan •  Project of Dr. Ir Soekarno Bridge in Manado
•  Project of the Procurement and Installation of Interceptor
Pipe Sewerage System-1 in East Kalimantan •  Project of Bathokan Bridge in East Kalimantan
•  Project of Kabupaten Kendal Stadion •  Project of the Improvement of Lingkar Nagreg IV Road in
Bandung
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
109
Annual Report 2014 | PT HUTAMA KARYA Persero
MANAF SITORUS
GM Wilayah VI General Manager of Regional VI
Pria kelahiran Tapanuli Utara, 5 September 1963, memperoleh gelar  Sarjana  Teknik  di  Institut  Teknologi  Bandung  pada
tahun  1988  kemudian  melanjutkan  Strata  2  di  Universitas Tarumanegara, Jakarta pada tahun 2006.
Ia memulai kariernya di Perseroan sejak tahun 1988 sebagai Pelaksana hingga menjadi General Manager Wilayah VI,
Direktorat  I  tahun  2014.  Ia  juga  memiliki  pengalaman  di beberapa proyek Perseroan, diantaranya;
•  Proyek Semanggi Fly Over di Jakarta •  Proyek Peningkatan Jalan  Jemb ADB Paket 59 Sumba NTT
•  Proyek Biak Beach Hotel di Biak. •  Proyek Graving Dock di Jakarta
•  Proyek Pluit Laguna •  Proyek Lakespra
•  Proyek Pramuka Suprapto Fly Over •  Proyek Permata Eksekutif
•  Proyek Rusun manis Jatake Tangerang •  Proyek Rehabilitasi Istana Presiden Bogor
Born  in  Tapanuli  Utara,  September  5,  1963,  received  a Bachelor of engineering in Bandung Institute of Technology in
1988, continued his Magister in University of Tarumanegara, Jakarta, in 2006.
He started his career in the Company since 1988 as a Manager to General Manager of Regional VI, Directorate I in 2014. He
also has experiences in several Company’s projects, such as: •  Project of Semanggi Fly Over in Jakarta
•  Project of ADB Paket 59 Road and Bridge Improvement in
Sumba NTT •  Project of Biak Beach Hotel in Biak
•  Project of Graving Dock in Jakarta •  Project of Pluit Laguna
•  Project of Lakespra •  Project of Pramuka Suprapto Fly Over
•  Project of Permata Eksekutif •  Project of Rusun Manis Jatake in Tangerang
•  Project of Istana Presiden Improvement in Bogor
Proile of Division Below the Board of Directors
Y. WIDI SUHARYANTO
GM Wilayah VII General Manager of Regional VII
Pria  kelahiran  Temanggung,  29  Agustus  1970,  memperoleh gelar Sarjana Teknik di Universitas Sebelas Maret, Surakarta
pada tahun 1996.
Ia  memulai  kariernya  di  Perseroan  sejak  tahun  1996 sebagai Site Engineer Manager hingga menjadi General
Manager  Wilayah  VII,  Direktorat  III,  Surabaya    tahun  2014. Ia juga memiliki pengalaman di beberapa proyek Perseroan,
diantaranya; •  Proyek Jembatan Kali Krasak di Yogyakarta
•  Proyek  Pembangunan  Dam  Penahan  Sedimen    Dam
Konsolidasi Kali Senowo  Kali Pabelan paket M-8 Proyek Merapi Yogyakarta
•  Proyek Jembatan Dadahup di Banjarmasin •  Proyek Bendung Tandrahean di Muara Teweh
•  Proyek  Penyediaan    Pemasangan  Air  Baku  Kabupaten Banjar di Banjarmasin
Born in Temanggung, August 29, 1970, received a Bachelor of engineering in University of Sebelas Maret in 1996.
He  started  his  career  in  the  Company  since  1996  as  a  Site Engineer Manager to General Manager of Regional VII,
Directorate III, Surabaya in 2014. He also has experiences in several Company’s projects, such as:
•  Project of Kali Krasak Bridge in Yogyakarta •  Project of the Construction of Sediment Retention Dam
Consolidation  Dam  of  Kali  Senowo    Kali  Pabelan  paket M-8 Project of Merapi Yogyakarta
•  Project of Dadahup Bridge in Banjarmasin •  Project of Tandrahean Bendung in Muara Teweh
•  Project of Installation of Raw Water of Kabupaten Banjar in Banjarmasin
110
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Proile of Division Below the Board of Directors
SUROTO
GM Divisi Jalan dan Jembatan General Manager of Road and Bridge Division
Pria kelahiran Karang Anyar, 24 Agustus 1964, memperoleh gelar Sarjana Teknik di Universitas Sebelas Maret, Surakarta
pada tahun 1990 kemudian melanjutkan Strata 2 di Institut Teknologi Bandung pada tahun 2004.
Ia memulai kariernya di Perseroan sejak tahun 1993 sebagai Staf  hingga  menjadi  General  Manager  Divisi  Jalan  dan
Jembatan, Direktorat Operasi II  tahun 2013. Ia juga memiliki pengalaman di beberapa proyek Perseroan, diantaranya;
•  Proyek Jemb. Barelang Paket 2 Tonton Nipah Batam •  Proyek  Kantor  Walikotamadya  Tahap  II    Tahap  III  untuk
Pekerjaan Struktur dan Arsitektur di Batam •  Proyek  Pembangunan  Tribun  dan  Fasilitas  Penunjang
Kawasan Olah Raga Muka Kuning di Batam •  Proyek  Perbaikan  Sub  Base  Jalur  A  Ruas  Palimanan
Plumbon dan Perbaikan Perkerasan Jalan Ruas Plimbon Kanci di Batam
•  Proyek Jalan Tol Cibitung Cikampek •  Proyek Gedung Basic Science Centre ITB di Bandung
•  Proyek Jalan Jatibarang - By Pass I dan By Pass II di Jatibarang •  Proyek Pembangunan Fasum Kesatrian Brimob di Bandung
•  Proyek Toll Cipularang II seksi IV.3 di Padalarang •  Proyek  Pembangunan  Jalan  Toll  Cikampek  -  Purwakarta-
Padalarang Paket IV.3 Ruas Cikubang-Cipada •  Proyek Penanganan Bencana Alam Sumedang
•  Proyek  USAID    Indonesian  RFF  No.  07.001  Aceh  Road Bridge  Reconstruction  Project  Banda  Aceh  to  Calang  di
Aceh Born in Karang Anyar, August 24, 1964, received a Bachelor of
engineering in University of Sebelas Maret, Surakarta, in 1990, continued  his  Magister  in  Bandung  Institute  of  Technology,
Bandung, in 2004. He started his career in the Company since 1993 as a staf
to General Manager of Road and Bridge Division, Directorate II  in  2013.  He  also  has  experiences    in  several  Company’s
projects, such as: •  Project of Barelang Bridge Paket 2 Tonton Nipah Batam
•  Project  of  Walikotamadya  Oice  Stage  II    III  for  Work Structure and Architecture in Batam
•  Project  of  the  Construction  of  Tribun  and  Supporting Facilities in Kawasan Olahraga Muka Kuning in Batam
•  Project  of  the  Improvement  of  Sub  Base  Jalur  A  Ruas Palimanan Plumbon and the Improvement of Ruas Plimbon
Kanci Road in Batam •  Project of Cibitung-Cikampek Toll Road
•  Project of Basic Science Centre ITB Building in Bandung •  Project  of  Jatibarang-By  Pass  I  and  By  Pass  II  Road  in
Jatibarang •  Project of the Construction of Fasum Kesatrian Brimob in
Bandung •  Project of Cipularang III Seksi IV.3 Toll in Padalarang
•  Project  of  the  Construction  of  Cikampek-Purwakarta- Padalarang Road Toll Paket IV.3 Ruas Cikubang-Cipada
•  Project of Sumedang Disasters •  Project  of  USAIDIndonesian  RFF  No.  07.  001  Aceh  Road
Bridge Reconstruction in Aceh
KOENTJORO
GM Divisi Gedung General Manager of Building Division
Pria kelahiran 2 Juli 1970, memperoleh gelar Sarjana Teknik di Universitas Diponegoro pada tahun 1993.
Ia memulai kariernya di Perseroan sejak tahun 1993 sebagai Site Engineer hingga menjadi General Manager Divisi Gedung
pada Direktorat I tahun 2014. Ia juga memiliki pengalaman di beberapa proyek Perseroan, diantaranya;
•  Proyek  Sistem  Penyediaan  Air  Bersih  Sederhana  SIPAS
Kab. Pati, Rembang  Blora di Kalimantan Timur •  Crash  Program  Irigasi  di  Desa  Kebarongan  Kemrajen
Proyek Irigasi Serayu Gambarsari •  Proyek  Jembatan  Mahakam  di  Tenggarong  Kalimantan
Timur •  Proyek Jembatan Ngabang-Landak di Kalimantan Barat
•  Proyek Track Baru HTD JO Tegal •  Proyek Jembatan Gebang
•  Proyek SU-2 JO •  Proyek  Pembangunan  Jalan  Baru  Pare-Pare  II  Sulawesi
Selatan. •  Proyek Jalan Tol Mojokerto - Kertosono
Born  on  July  2,  1970,  received  a  Bachelor  of  Engineering  in University of Diponegoro in 1993.
He started his career in the Company in 1993 as a Site Engineer to  General  Manager  of  Building  Division  in  Directorate  I  in
2014. He also has experiences in several Company’s projects, such as:
•  Project of SIPAS Sistem Penyediaan Air Bersih Sederhana
in Pati, Rembang  Blora in East Kalimantan •  Project  of  Irrigation  Crash  Program  in  Desa  Kebarongan
Kemrajen Project of Serayu Gambarsari Irrigation •  Project of Mahakam Bridge in Tenggarong East Kalimantan
•  Project of Ngabang-Landak Bridge in West Kalimantan •  Project of New Track of HTD JO Tegal
•  Project of Gebang Bridge •  Project of SU-2 JO
•  Project  of  the  Construction  of  New  Pare-Pare  II  Road  in
South Sulawesi •  Project of Mojokerto-Kertosono Toll Road
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
111
Annual Report 2014 | PT HUTAMA KARYA Persero
Proile of Division Below the Board of Directors
SIGIT WINARTO
GM Divisi EPC General Manager of EPC Divison
M. FAUZAN
Direktur Utama PT HK Realtindo President Director of PT HK Realtindo
Pria  kelahiran  Bengkalis,  6  April  1973,  memperoleh  gelar Sarjana  Teknik  di  Institut  Teknologi  Sepuluh  November,
Surabaya pada tahun 1998 kemudian melanjutkan Strata 2 di Universitas Riau pada tahun 2009.
Ia memulai kariernya di Perseroan sejak tahun 1999 sebagai Staf  hingga  menjadi  General  Manager  Divisi  Gedung  pada
Direktorat Operasi I tahun 2013. Ia juga memiliki pengalaman di beberapa proyek Perseroan, diantaranya;
•  Proyek Dermaga CPI Caltex Dumai •  Proyek Jembatan Danau Bingkuang di Pekanbaru
•  Proyek Pengganti Jembatan Parit I di Pekanbaru
Born  in  Bengkalis,  April  6,  1973,  received  a  Bachelor  of engineering  in  Sepuluh  November  Institute  of  Technology,
Surabaya 1998, continued his Magister in University of Riau in 2009.
He started his career in the Company since 1999 as a staf to  General  Manager  of  Building  Division  on  Operational
Directorate  I  in  2013.  He  also  has  experiences  in  several Company’s projects, such as:
•  Project of CPI Caltex Dumai Port •  Project of Danau Bangkuang Bridge in Pekanbaru
•  Project of the Replacement of Parit I Bridge in Pekanbar
Pria kelahiran Jakarta, 22 Desember 1968, memperoleh gelar Sarjana  Teknik  di  Universitas  Sebelas  Maret,  Surakarta  pada  tahun
1993  kemudian  melanjutkan  Strata  2  di  Universitas  Tarumanegara, Jakarta pada tahun 2006.
Ia  memulai  kariernya  di  Perseroan  sejak  tahun  1993  sebagai  Staf hingga  menjadi  General  Manager  Divisi  EPC  tahun  2014.  Ia  juga
memiliki pengalaman di beberapa proyek Perseroan, diantaranya; •  Proyek  Jalan  Tanjung  Iman-  M.Saung  Batas  Sumatera  Selatan  di
Bengkulu •  Proyek Pnk Jalan Liwa - Krui di Lampung
•  Proyek Pembangunan Jembatan Air Batang di Bengkulu •  Proyek Pembangunan Derm Peti Kemas Pelab Panjang di Lampung
•  Perbaikan Jaringan Irigasi Desa di Lahat •  Proyek  Rehabilitasi  Bendungan    Jaringan  Air  D.I  Way  Curup  di
Lampung •  Penyiapan Lahan Usaha Tani Berpengairan PLUB  Pemb. Jaringan
Irigasi Skunder 550 Ha D.I Way Biha di Lampung •  Proyek  RehabPemel  Jalan    Jemb.  Terbanggi  Besar  KM  70+800
Bujung Tenuk KM. 199+000 di Lampung •  Proyek Pembangunan Dermaga Perikanan Muara Baru di Jakarta
•  Proyek Penanggulangan Darurat Jalan Lintas Timur di Jakarta •  Proyek  Pembangunan  Graving  Dock  Polairud  Tanjung  Priuk  di
Jakarta •  Proyek Dermaga Armabar Pondok Dayung Jakarta di Jakarta
•  Proyek PLTU Tanjung Awar-Awar •  Proyek Civil Work PLTU Jeneponto
Born in Jakarta, December 22, 1968, received a Bachelor of engineering in  University  of  Sebelas  Maret,  Surakarta,  in  1993,  continued  his
Magister in University of Tarumanegara in 2006. He started his career in the Company since 1993 as a staf to General
Manager of EPC Division in 2014. He also has experiences in several Company’s projects, such as:
• Project of Tanjung Iman-M. Saung Batas South Sumatera Road in
Bengkulu •  Project of Pnk Liwa-Krui Road in Lampung
•  Project of the Construction of Air Batang Bridge in Bengkulu •  Project of the Construction of Derm Peti Kemas Pelab Panjang in
Lampung •  Project of Irrigation Improvement in Lahat
•  Project  of  DamWater  Canal  of  D.I  Way  Curup  Imrpovement  in Lampung
•  Project of PLUB Penyiapan Lahan Usaha Tani Berpengairan  the Construction of Irrigation Canal of Skunder 550 Ha D.I Way Biha in
Lampung •  Project  of  the  Construction  and  Maintenance  of  Tervanggi  Besar
Road  Bridge KM 70+800 Bujung Tenuk KM. 199+000 in Lampung •  Project of the Construction of Perikanan Muara Baru Port in Jakarta
•  Project of Eemergency Prevention of Lintas Timur Road in Jakarta •  Project of the Construction of Graving Dock Polairud Tanjung Priok
in Jakarta •  Project of Armabar Pondok Dayung Port Tanjung Priuk in Jakarta
•  Project of PLTU Tanjung Awar-Awar •  Project of Civil Work PLTU Jeneponto
112
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Proile of Division Below the Board of Directors
KRISWANDONO
Direktur Utama PT Hakapole President Director of PT Hakapole
M. IBNU FAJAR
Direktur Utama PT Hakaaston President Director of PT Hakaaston
Pria  kelahiran  Semarang,  23  Juli  1960,  memperoleh  gelar Sarjana  Teknik  di  Institut  Teknologi  Bandung,  pada  tahun
1986.
Ia memulai kariernya di Perseroan sejak tahun 1987 sebagai Tenaga Honorer Divisi Aluminium di Jakarta hingga menjadi
Direktur Utama PT Hakapole pada tahun 2013.
Born in Semarang, July 23, 1960, received a Bachelor Degree in Engineering in Bandung Institute of Technology in 1986.
He started his career in the Company since 1987 as Tenaga Honorer  of  Alumunium  Division  in  Jakarta  to  President
Director of PT Hakapole in 2013. Pria kelahiran Jakarta, 20 Juni 1968, memperoleh gelar Sarjana
Teknik di UPN Veteran Jogjakarta, pada tahun 1997.
Ia memulai kariernya di PT Intitreatment Perkasa pada tahun 1993-1996  sebagai  Tecnical  Chemist  kemudian  PT  Servo
Indonesia  pada  tahun  1997-1999  sebagai  Service  Engineer, PT MI Indonesia pada tahun 1999-2000 sebagai Field Services
Engineer, PT Duta Polykemindo sebagai Technical Manager, Clearwater  Inc.  LLC,  Houston  Texas  pada  tahun  2003-2004
sebagai Representative for Asia Paciic, Weatherford Indonesia pada tahun 2004-2011 sebagai Business Manager, PT Elnusa
Petroin pada tahun 2012-2014 sebagai Direktur Operasi dan Pemasaran, PT Hakaaston pada tahun 2014-sekarang sebagai
Direktur.
Born  in  Jakarta,  June  20,1968,  received  Bachelor  Degree  in Engineering in UPN Veteran Jogjakarta in 1997.
He  started  his  career  at  PT  intitreatment  Perkasa  in  1993- 1996  as Technical Chemist, then PT Servo Indonesia in 1997-
1999  as  Service  Engineer,  PT  MI  Indonesia  in  1999-2000  as Field  Services  Engineer,  PT  Duta  Polykemindo  as  Technical
Manager,  Clearwater  Inc.  LLC.  Houston  Texas  in  2003-2004 as Representative for Asia Paciic, Weatherford Indonesia in
2004-2011 as Business Manager, PT Elnusa Petroin in 2012- 2014 as Director of Operations and Marketing, PT Hakaaston
in 2014-present as Director.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
113
Annual Report 2014 | PT HUTAMA KARYA Persero
Information of Shareholders Composition
Information of Obligation Listing Chronology of Share Listing
Pemegang Saham PT Hutama Karya Persero adalah 100 Pemerintah Republik Indonesia dengan struktur
permodalan sebagaimana Keputusan RUPS LB tentang Peningkatan Modal Dasar, Penambahan Modal Disetor
dan Perubahan Anggaran Dasar No.RIS-278MBU2012 tanggal 19 Juli 2012, sebagai berikut:
Tabel informasi komposisi kepemilikan saham
Uraian  Description jumlah Lembar saham  Total shares
Nominal  Nominal
Modal Dasar Authorized Capital
2.000.000 2.000.000.000.000
Modal Ditempatkan Issued Capital
500.000 500.000.000.000
Modal Disetor Paid up Capital
500.000 500.000.000.000
Saham dalam portapel Share in portepel
1.500.000 1.500.000.000.000
Shareholder of PT Hutama Karya Persero is 100 of Indonesia Government with capital structure as stated
in EGMS Decision regarding the Increase of Authorized Capital, an Additional of Paid-up Capital and the
Changes of Article of Association No.RIS-278MBU2012 on July 19, 2012 as follows:
Table of Shareholders Composition
Perseroan belum melakukan pencatatan saham perdana atau
Initial  Public  Ofering  IPO  sehingga informasi mengenai kronologi pencatatan saham
tidak dapat disajikan dalam laporan tahunan 2014 ini. The Company has not conducted Initial Public Ofering
IPO  yet,  thus  the  information  regarding  of  share listing can not be reported in Annual Report 2014.
Berdasarkan  pemeringkatan  terakhir  dari  Peindo pada tanggal 10 Maret 2015 untuk periode 10 Maret
2015  sampai  dengan  1  Maret  2016,  Perseroan memperoleh peringkat “idA-”, yang mencerminkan
kemampuan Perseroan untuk memenuhi komitmen keuangan jangka panjang atas efek utang tersebut.
Based  on  the  latest  rating  from  Peindo  on  March 10, 2015 for March 10, 2015 until March 1, 2016, the
Company obtained “idA-” that relected the Company’s capability  of  fulilling  the  commitment  of  long-term
inance on the debt securities.
114
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Bonds Listing Chronology
Pada  17  April  2013,  Perseroan  mencatatkan  obligasi pada Bursa Efek Indonesia BEI.
Nama Obligasi Nama  Obligasi  yang  ditawarkan  melalui  Penawaran
Umum  ini  adalah  “Obligasi  I  Hutama  Karya  Tahun 2013”  diterbitkan  berdasarkan  ketentuan-ketentuan
yang termuat dalam Akta Perjanjian Perwaliamanatan Obligasi  I  Hutama  Karya  Tahun  2013  No.  43  tanggal
17  April  2013,  sebagaimana  diubah  dengan  Akta Addendum  Perjanjian  Perwaliamanatan  Obligasi
I  Hutama  Karya  2013  No.  24  tanggal  16  Mei  2013 dan Akta Addendum II Perjanjian Perwaliamanatan
Obligasi I Hutama Karya tahun 2013 No. 52 tanggal 17 Juni 2013 yang dibuat di hadapan Ir. Nanette Cahyanie
Handari Adi Warsito, SH., Notaris di Jakarta.
Obligasi ini didaftarkan dalam Penitipan Kolektif KSEI berdasarkan Perjanjian Tentang Pendaftaran Obligasi
di KSEI No. SP-0022POKSEI0413 tertanggal 17 April 2013, yang dibuat di bawah tangan.
jenis Obligasi Obligasi ini diterbitkan tanpa warkat, kecuali Sertiikat
Jumbo Obligasi yang diterbitkan oleh Perseroan  atas nama  KSEI  sebagai  bukti  utang  untuk  kepentingan
Pemegang  Obligasi  melalui  Pemegang  Rekening  dan didaftarkan  pada  tanggal  diserahkannya  Sertiikat
Jumbo  Obligasi  oleh  Perseroan  kepada  KSEI.  Bukti kepemilikan  Obligasi  bagi  Pemegang  Obligasi  adalah
Konirmasi  Tertulis  yang  diterbitkan  oleh  KSEI  atau Pemegang Rekening.
jumlah Pokok Obligasi, Bunga Obligasi, dan jatuh Tempo Obligasi
Obligasi ini diterbitkan dengan jumlah pokok obligasi sebesar  Rp750.000.000.000  tujuh  ratus  lima  puluh
miliar Rupiah yang terdiri dari 3 tiga seri, yaitu: Seri A  :  Jumlah  Obligasi  Seri  A  yang  ditawarkan
adalah  sebesar  Rp135.000.000.000  seratus tiga  puluh  miliar  Rupiah  dengan  bunga
obligasi sebesar 8,75  delapan koma tujuh lima persen per tahun. Jangka waktu Obligasi
On  April  17,  2013,  the  Company  listed  its  bond  on Indonesia Stock Exchange IDX.
Bond Name Bond  ofered  through  this  Public  Ofering  is  “Bond  I
Hutama Karya Year 2013” issued based on provisions stipulated in the Trust Deed on Bond I Hutama Karya
Year 2013 No. 43 dated April 17, 2013, as amended by Trust Deed Addendum on Bond I Hutama Karya 2013
No. 24 dated May 16, 2013 and Trust Deed Addendum II on Bond I Hutama Karya year 2013 No. 52 dated June
17,  2013,  made  before  Ir.  Nanette  Cahyanie  Handari Adi Warsito, SH., Notary in Jakarta.
This bond is registered in KSEI’s collective depository based on Agreement on Registration of Bond in KSEI
No.  SP-0022POKSEI0413  dated  April  17,  2013, privately arranged and duly stamped.
Bond Type This bond is issued through scripless trading, except
Sertiikat  Jumbo  Obligasi  issued  by  the  Company  on behalf  of  KSEI  as  debentures  through  the  relevant
Account Holder and registered on the date when the Sertiikat Jumbo Obligasi is submitted by the Company
to KSEI. Note to Bond Ownership for Bond Holder is Written Conirmation issued by KSEI or Account Holder.
Bond Principals, Bond interest, and Bond Maturity
This  bond  is  issued  with  bond  principal  totaling Rp750,000,000,000 seven hundred ifty billion Rupiah
composing of 3 three series, namely: Series A :  Total Bond Series A is ofered at the amount
of  Rp135,000,000,000  one  hundred  thirty ive  billion  Rupiah  with  bond  rate  at  the
amount  of  8.75  eight  point  seventy  ive percent  per  annum.  The  bond  term  is  3
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
115
Annual Report 2014 | PT HUTAMA KARYA Persero
adalah  3  tiga  tahun.  Pembayaran  Obligasi dilakukan  secara  penuh  bullet payment
pada saat tanggal jatuh tempo Obligasi yaitu tanggal 28 Juni 2016.
Seri B  :  Jumlah  Obligasi  Seri  B  yang  ditawarkan adalah sebesar Rp290.000.000.000 dua ratus
sembilan puluh miliar Rupiah dengan Bunga Obligasi sebesar 9,1  sembilan koma satu
persen  per  tahun.  Jangka  waktu  Obligasi adalah  5  lima  tahun.  Pembayaran  Obligasi
dilakukan  secara  penuh  bullet payment pada saat tanggal jatuh tempo, yaitu tanggal
28 Juni 2018. Seri C  :  Jumlah  Obligasi  Seri  C  yang  ditawarkan
adalah sebesar Rp325.000.000.000 tiga ratus dua puluh lima miliar Rupiah dengan Bunga
Obligasi sebesar 9,5  sembilan koma lima persen  per  tahun.  Jangka  waktu  Obligasi
adalah 7 tujuh tahun. Pembayaran Obligasi dilakukan  secara  penuh  bullet payment
pada saat tanggal jatuh tempo, yaitu tanggal
28 Juni 2020. Bunga  Obligasi  dibayarkan  setiap  triwulan,  terhitung
sejak Tanggal Emisi, yaitu pada Tanggal Pembayaran Bunga Obligasi. Dalam hal Tanggal Pembayaran Bunga
Obligasi jatuh pada hari yang bukan Hari Bursa, maka Bunga  Obligasi  dibayar  pada  Hari  Bursa  sesudahnya
tanpa dikenakan denda.
Tingkat  Bunga  Obligasi  tersebut  merupakan persentase per tahun dari nilai nominal yang dihitung
berdasarkan jumlah hari kalender yang lewat sejak Tanggal  Emisi,  dimana  perhitungan  1  satu  tahun
adalah 360 tiga ratus enam puluh hari kalender dan 1  satu  bulan  adalah  30  tiga  puluh  Hari  Kalender
dan wajib dibayar oleh Perseroan kepada Pemegang Obligasi  melalui  Agen  Pembayaran  setiap  Tanggal
Pembayaran Bunga. three years. The bond payment is done in
bullet payment on the bond maturity date, namely June 28, 2016.
Series B :  Total Bond Series B is ofered at the amount of Rp290,000,000,000 two hundred ninety
billion Rupiah with bond rate of 9.1 nine point one percent per year. The bond term
is 5 ive years. The bond payment is done in bullet payment on the bond maturity
date, namely June 28, 2018.
Series C :  Total Bond Series C is ofered at the amount of  Rp325,000,000,000  three  hundred
twenty  ive  billion  Rupiah  with  bond  rate of 9.5 nine point ive per cent per year.
The bond term is 7 seven years. The bond payment is done in bullet payment on the
bond maturity date, namely June 28, 2020.
Bond  Interest  is  paid  every  quarter,  efective  since the Issuance Date, namely on Payment Date of Bond
Interest. In the event that the payment date of bond
interest falls on the day other than the Exchange Day, the Bond Interest shall be paid on the following
Exchange Day without any charge of ine.
The Bond Interest Rate is a percentage per year from the nominal value calculated based on total Calendar
Day since the Issuance Date, in which the calculation of 1 one year is 360 three hundred sixty Calendar Days
and 1 one month is 30 thirty Calendar Days and is obliged to be paid by the Company to the Bond Holder
through Paying Agent on the date of the Interest
Payment.
Bonds Listing Chronology
116
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Obligasi  harus  dilunasi  dengan  harga  yang  sama dengan  jumlah  Pokok  Obligasi  yang  tertulis  pada
Konirmasi  Tertulis  yang  dimiliki  oleh  Pemegang Obligasi,  dengan  memperhatikan  Sertiikat  Jumbo
Obligasi dan ketentuan Perjanjian Perwaliamanatan.
Jadwal pembayaran Pokok dan Bunga untuk masing- masing  seri  Obligasi  adalah  sebagaimana  tercantum
dalam tabel di bawah ini:
Pembayaran  Payment Tanggal Pembayaran Bunga  interest Payment Date
seri A  series A seri B  series B
seri C  series C
Bunga Obligasi ke-1 1
st
Bond Interest 28 September 2013
September 28, 2013 28 September 2013
September 28, 2013 28 September 2013
September 28, 2013 Bunga Obligasi ke-2
2
nd
Bond Interest 28 Desember 2013
December 28, 2013 28 Desember 2013
December 28, 2013 28 Desember 2013
December 28, 2013 Bunga Obligasi ke-3
3
rd
Bond Interest 28 Maret 2014
March 28, 2014 28 Maret 2014
March 28, 2014 28 Maret 2014
March 28, 2014 Bunga Obligasi ke-4
4
th
Bond Interest 28 Juni 2014
June 28, 2014 28 Juni 2014
June 28, 2014 28 Juni 2014
June 28, 2014 Bunga Obligasi ke-5
5
th
Bond Interest 28 September 2014
September 28, 2014 28 September 2014
September 28, 2014 28 September 2014
September 28, 2014 Bunga Obligasi ke-6
6
th
Bond Interest 28 Desember 2014
December 28, 2014 28 Desember 2014
December 28, 2014 28 Desember 2014
December 28, 2014 Bunga Obligasi ke-7
7
th
Bond Interest 28 Maret 2015
March 28, 2015 28 Maret 2015
March 28, 2015 28 Maret 2015
March 28, 2015 Bunga Obligasi ke-8
8
th
Bond Interest 28 Juni 2015
June 28, 2015 28 Juni 2015
June 28, 2015 28 Juni 2015
June 28, 2015 Bunga Obligasi ke-9
9
th
Bond Interest 28 September 2015
September 28, 2015 28 September 2015
September 28, 2015 28 September 2015
September 28, 2015 Bunga Obligasi ke-10
10
th
Bond Interest 28 Desember 2015
December 28, 2015 28 Desember 2015
December 28, 2015 28 Desember 2015
December 28, 2015 Bunga Obligasi ke-11
11
th
Bond Interest 28 Maret 2016
March 28, 2016 28 Maret 2016
March 28, 2016 28 Maret 2016
March 28, 2016 Bunga Obligasi ke-12
12
th
Bond Interest 28 Juni 2016
June 28, 2016 28 Juni 2016
June 28, 2016 28 Juni 2016
June 28, 2016 Bunga Obligasi ke-13
13
th
Bond Interest -
28 September 2016 September 28, 2016
28 September 2016 September 28, 2016
Bunga Obligasi ke-14 14
th
Bond Interest -
28 Desember 2016 December 28, 2016
28 Desember 2016 December 28, 2016
Bunga Obligasi ke-15 15
th
Bond Interest -
28 Maret 2017 March 28, 2017
28 Maret 2017 March 28, 2017
Bunga Obligasi ke-16 16
th
Bond Interest -
28 Juni 2017 June 28, 2017
28 Juni 2017 June 28, 2017
Bunga Obligasi ke-17 17
th
Bond Interest -
28 September 2017 September 28, 2017
28 September 2017 September 28, 2017
Bunga Obligasi ke-18 18
th
Bond Interest -
28 Desember 2017 December 28, 2017
28 Desember 2017 December 28, 2017
Bunga Obligasi ke-19 19
th
Bond Interest -
28 Maret 2018 March 28, 2018
28 Maret 2018 March 28, 2018
Bunga Obligasi ke-20 20
th
Bond Interest -
28 Juni 2018 June 28, 2018
28 Juni 2018 June 28, 2018
Bunga Obligasi ke-21 21
th
Bond Interest -
- 28 September 2018
September 28, 2018
The bond must be settled in the similar amount with the amount of Bond Principals written in the Written
Conirmation  held  by  Bond  Holder  by  considering Sertiikat  Jumbo  Obligasi  and  provisions  of  the  Trust
Deed.
Total payment of Principals and Interest for each series of Bond is as stated below:
Bonds Listing Chronology
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
117
Annual Report 2014 | PT HUTAMA KARYA Persero
Pembayaran  Payment Tanggal Pembayaran Bunga  interest Payment Date
seri A  series A seri B  series B
seri C  series C
Bunga Obligasi ke-22 22
th
Bond Interest -
- 28 Desember 2018
December 28, 2018 Bunga Obligasi ke-23
23
th
Bond Interest -
- 28 Maret 2019
March 28, 2019 Bunga Obligasi ke-24
24
th
Bond Interest -
- 28 Juni 2019
June 28, 2019 Bunga Obligasi ke-25
25
th
Bond Interest -
- 28 September 2019
September 28, 2019 Bunga Obligasi ke-26
26
th
Bond Interest -
- 28 Desember 2019
December 28, 2019 Bunga Obligasi ke-27
27
th
Bond Interest -
- 28 Maret 2020
March 28, 2020 Bunga Obligasi ke-28
28
th
Bond Interest -
- 28 Juni 2020
June 28, 2020
Hasil Pemeringkatan Untuk  memenuhi  ketentuan  Peraturan  Nomor  IX.C.1
Lampiran  Keputusan  Ketua  Bapepam  No.  KEP-42 PM2000 tanggal 27 Oktober 2000 tentang Pedoman
Mengenai  Bentuk  dan  Isi  Pernyataan  Pendaftaran Dalam  Rangka  Penawaran  Umum  dan  Peraturan
Nomor  IX.C.11  Lampiran  Keputusan  Ketua  Bapepam dan  LK  No.  KEP-712BL2006  tanggal  26  Desember
2012 tentang Pemeringkatan Efek Bersifat Utang dan atau Sukuk, Perseroan telah melakukan pemeringkatan
yang  dilaksanakan  oleh  Peindo.  Berdasarkan  surat Peindo  No.  354PEF-DirIII2015  tanggal  10  Maret
2015,  hasil  pemeringkatan  atas  Obligasi  Perseroan adalah:
id
A- single a minus
Hasil  Pemeringkatan  ini  berlaku  untuk  periode  10 Maret 2015 sampai dengan 1 Maret 2016.
Perseroan  tidak  memiliki  hubungan  ailiasi  dengan Peindo yang bertindak sebagai lembaga pemeringkat.
Perseroan akan melakukan pemeringkatan atas Obligasi  ini  setiap  1  satu  tahun  sekali  selama
kewajiban atas efek tersebut belum lunas
sebagaimana yang diatur dalam Peraturan Nomor IX.C.11  Lampiran  Keputusan  Ketua  Bapepam  dan
LK  No.  KEP-712BL2006  tanggal  26  Desember  2012 tentang Pemeringkatan Efek Bersifat Utang danatau
Sukuk.
Rating Result To comply with Regulation Number IX.C.1 Attachment
of  Decree  of  Bapepam  Chairman  Number:  KEP-42 PM2000  dated  October  27,  2000  on  Guidelines  on
Form and Content of Registration Statement for Public Ofering  and  Regulation  Number  IX.C.11  Attachment
of  Decree  of  Bapepam  and  LK  Chairman  Number: KEP-712BL2006 dated December 26, 2012 on Equity
andor Sukuk Securtities Rating, the Company has conducted rating by Peindo. Based on Peindo letter
No. 354PEF-DIRIII2015 dated March 10, 2015, rating result on the Company’s Bond is:
idA- single A Minus
This  Rating  Result  will  be  efective  for  the  period  of March 10, 2015 up to March 1, 2016.
The  Company  does  not  have  any  ailiation  with Peindo acting as rating agency.
The Company will conduct rating on this Bond every 1  one  year  as  long  as  the  obligation  on  the  said
securities  has  not  yet  fulilled  as  stipulated  in  the Regulation  Number  IX.C.11  Attachment  of  Decision
from  Bapepam  and  LK  Chairman  Number:  EKP-712 BL2006 dated December 26, 2012 on Rating of Equity
Securities andor Sukuk.
Bonds Listing Chronology
118
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Konsultan Hukum
1.  Hendi Gandasmiri Lawyers Wisma Pese, 1
st
Floor, Jl. Let. Jend. MT. Haryono,
Kav. 17, Jakarta 12810, Indonesia Telp  : +62-21 8379 2481
Fax  : +62-21 8379 2482
2.  OCK  Associates Kompleks Majapahit Permai
Blok B 122-123 Jl. Majapahit 18-20
Jakarta 10160, Indonesia Telp  : +62-21 3853250
Fax   : +62-21 3808193
3.  Lukas Budiono  Partners Gedung Bank Mandiri, Lantai 5 Ruang
503, Jl. Tanjung Karang No. 3-4 A, Jakarta 10230
Telp  : +62-21 3162530, 3162534,
3911062, 2911063 Fax   : +62-21 3148322, 3155251
Notaris
Sri Ismiyati, SH Jl. Raya Boulevard Blok RA I No. 24,
Kelapa Gading Permai, Jakarta Utara
Tel   : +62-21 4535096 Fax   : +62-21 4504530
Nama dan Alamat Perusahaan Pemeringkat Obligasi
PT Pemeringkat Efek Indonesia Panin Tower Senayan City 17
th
loor Jl. Asia Afrika Lot. 19,
Jakarta 10270, Indonesia Tel
: 02172782380 Fax
: 021 72782370 Website : http:peindo.com
Kantor Akuntan Publik
Kanaka Puradiredja, Suhartono The Royal Palace
Jl. Prof Soepomo No. 178A-C29 Jakarta 12810, Indonesia
Telp
: +62-21 8313861 hunting Fax
: +62-21 8313871 Email
: central.mailkanaka.co.id Website   : www.kanaka.co.id
Biro Administrasi Efek
Jl. Jend. Sudirman Kav. 52-53 Jakarta Selatan
Telp : 021 5150515
Fax : 021 5150330
Email : callcenteridx.co.id
Website : http:www.idx.co.id
Supporting Professional Institution
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
119
Annual Report 2014 | PT HUTAMA KARYA Persero
Information on Subsidiaries
Anak Perusahaan
Penyertaan
No Nama Perusahaan
Company Name Alamat  Address
Bidang Usaha Line of Business
status Kepemilikan
Ownership
1 PT HK Realtindo
Antam oice Park Tower II 18
th
loor Jl. TB Simatupang
Jakarta Selatan 12530 Telepon  : +62 21 2904 8810-11
Faksimile : +62 21 2904 8812 Email
: marketinghkrealtindo.co.id Properti
Property Beroperasi
Operating 99,75
2 PT Hakapole
Jl. Raya Narogong Km.13,5 Bekasi 17310
Telepon  : +62 21 8255134 Faksimile : +62 21 8255133
Email : hakapolegmail.com
Manufaktur Manufacturing
Beroperasi Operating
99,75
3 PT Hakaaston
Ruko Plaza Deminimalis Kav.10 Jl. Caman Raya, Jatibening
Bekasi 17412 Telepon  : +62 21 84995068
Faksimile : +62 21 84971161 Email
: infohakaaston.co.id Perdagangan
Trading Beroperasi
Operating 99,75
No Nama Perusahaan
Company Name Alamat  Address
Bidang Usaha Line of Business
status Kepemilikan
Ownership
1 PT Takenaka Indonesia
Mid Plaza 1 18
th
Jakarta 10210 Telepon  : +62 21 5735 660
Faksimile : +62 21 5741 684 Jasa Konstruksi
Construction Service
Beroperasi Operating
1,07
2 PT Hutama Prima
Jl. Metro Duta Niaga Blok II BA-3 Pondok Indah, Jakarta 12310
Telepon  : +62 21 7669501,750202 Faksimile : +62 21 7669501
Pengelolaan Aspal dan
Konstruksi Jalan Raya
Asphalt Management and
Road Construction Beroperasi
Operating 30,00
3 PT Citra Waspphutowa
Jl. Angkasa No. 20 Kemayoran Jakarta 10610
Telepon  : +62 21 42885282 Faksimile : +62 21 42885281
Jalan Tol Toll
Road Beroperasi
Operating 12,50
4 PT Jasa Marga Bali Tol
Kawasan Ikat Plaza, Jalan By Pass I Gusti Ngurah Rai No. 505 Denpasar,
Bali Telepon  : +62 361 725326
Faksimile : +62 361 725327 Jalan Tol
Toll Road
Beroperasi Operating
1,00
5 PT Gorontalo Energi
Jl. Bulungan Raya No.26 kebayoran Baru, Jakarta12130
Telepon  : +62 21 7279 6733 Faksimile : +62 21 7279 6747
Energi Energy
Beroperasi Operating
1,00
6 PT Prima Terminal
Petikemas Jl. Kartini No. 22
Medan, Sumatera Utara Telepon  : 061 4517787
Faksimile : 061 4517787 Pelayanan
Terminal Peti Kemas
Internasional International
Container Terminal Services
Beroperasi Operating
15
120
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Operational Maps
WilayahDivisi RegionalDivision
WilayahDivisi RegionalDivision
Wilayah Operasi Operational Regional
Kedudukan Operasi Operational	Oice
Wilayah I Regional I
Jl. D.I. Panjaitan No. 166 Medan 20154
Gedung Graha Gabah Pertani Lantai I Jl. D.I. Panjaitan No. 166
Medan 20154 Graha Gabah Pertani Building 1st Floor
Riau, Aceh, Sumatera Utara, Sumatera Barat, dan Kepulauan Riau
Riau, Aceh, North Sumatera, West Sumatera, and Kepulauan Riau
Medan
Wilayah II Regional II
Gedung HK Lantai 2 Jl. Letjen MT. Haryono Kav. 8 Jakarta 13340
HK Building 2nd Floor Jl. Letjen MT. Haryono Kav. 8 Jakarta 13340
DKI Jakarta, Banten, dan Jawa Barat DKI Jakarta, Banten, and West Jawa
Jakarta
Wilayah III Regional III
Jl. Marsma R Iswahyudi Ruko No. 392 394 Kel. Sepinggan Balikpapan Selatan
Kalimantan Timur Jl. Marsma R Iswahyudi Ruko No. 392 394
Kel. Sepinggan Balikpapan Selatan Kalimantan Timur
Kalimantan Timur, Kalimantan Barat, Kalimantan Selatan dan Kalimantan Tengah
East Kalimantan, West Kalimantan, South Kalimantan and Central Kalimantan
Balikpapan Wilayah IV
Regional IV Jl. Hayam Wuruk No. 171 Denpasar 80235
Jl. Hayam Wuruk No. 171 Denpasar 80235 Bali, NTT, dan NTB
Bali, NTT, and NTB Bali
Wilayah V Regional V
Jl. Andi Mappaodang No. 18 makassar 90125 Jl. Andi Mappaodang No. 18 makassar 90125
Sulawesi Selatan, Sulawesi Barat, Sulawesi Tengah, Sulawesi Utara, Gorontalo, Maluku,
Maluku Utara, Papua Barat, dan Papua South
Sulawesi, West Sulawesi, Central Sulawesi, North Sulawesi, Gorontalo, Maluku, North Maluku,
West Papua, dan Papua Makassar
Wilayah i Regional i
Wilayah	IV Regional	IV
Wilayah	VII Regional	VII
Wilayah ii Regional ii
Wilayah iii Regional iii
Wilayah	VI Regional	VI
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
121
Annual Report 2014 | PT HUTAMA KARYA Persero
WilayahDivisi RegionalDivision
WilayahDivisi RegionalDivision
Wilayah Operasi Operational Regional
Kedudukan Operasi Operational	Oice
Wilayah VI Regional VI
Jl. Diponegoro No. 31 Palembang Jl. Diponegoro No. 31 Palembang
Sumatera Selatan, Bengkulu, Lampung, Bangka Belitung, dan Jambi
South Sumatera, Bengkulu, Lampung, Bangka Belitung, and Jambi
Palembang Wilayah VII
Regional VII Jl. Comal No. 20 Surabaya
Jl. Comal No. 20 Surabaya Jawa Timur, Jawa Tengah,
Daerah Istimewa Yogyakarta East Jawa, Central
Jawa, Special Region of Yogyakarta Surabaya
Divisi Gedung Building Division
Kl. Iskandarsyah I No. 6 Kebayoran baru, Jakarta 12160 Kl. Iskandarsyah I No. 6 Kebayoran baru, Jakarta
12160 Seluruh Indonesia
Across Indonesia Jakarta
Divisi Jalan dan Jembatan Road and Bridge Division
Gedung HK Jl. Letjen MT. Haryono Kav. 8 Jakarta 13340
Gedung HK Jl. Letjen MT. Haryono Kav. 8 Jakarta 13340
Seluruh Indonesia Across Indonesia
Jakarta
Divisi EPC EPC Division
Gedung HK Jl. Letjen MT. Haryono Kav. 8 Jakarta 13340
Gedung HK Jl. Letjen MT. Haryono Kav. 8 Jakarta 13340
Seluruh Indonesia Across Indonesia
Jakarta
Wilayah	V Regional	V
Divisi yang beroperasi di seluruh Indonesia Divisions that operate in Indonesia:
Divisi EPC EPC Divison
Divisi Gedung Building Division
Divisi Jalan  Jembatan Road  Bridge Division
122
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Information on the Performance of Subsidiaries in 2014
PT HK Realtindo PT HK Realtindo merupakan entitas anak perusahaan
PT  Hutama  Karya  Persero  yang  bergerak  dalam bidang  usaha  properti.  Pemegang  saham  PT  HK
Realtindo  adalah  Perseroan  dan  YKK  PT  Hutama Karya  dengan  masing-masing  kepemilikan  saham
sebesar  99,75  dan  0,25.  Sebagai  perusahaan yang  bergerak  dalam  bidang  usaha  properti,  PT  HK
Realtindo senantiasa mendukung usaha Perseroan dalam  bidang  konstruksi.  HK  Realtindo  memberikan
tiga jenis layanan yang terintegrasi yaitu kemitraan
strategis dalam pembangunan properti untuk proyek perumahan maupun komersial, sampai dengan
pengelolaan proyek pelanggan. Tabel  informasi  kinerja  keuangan  PT  HK  Realtindo
2014
Dalam Miliar Rupiah
Uraian Description RKAP 2014
Realisasi 2014 Realization in 2014
Persentase Realisasi Terhadap Anggaran
Tahun 2014  Percentage of Realization Toward
Budget Year 2014
Pendapatan Usaha Operating Revenue
870,82 364,70
41,88 Beban Kontrak
Contract expenses 685,46
241,86 35,28
Laba Usaha Operating Proit
175,87 122,26
69,52 Laba Setelah Pajak
Proit after Tax 130,37
102,29 78,46
PT Hakapole PT  Hakapole  merupakan  entitas  anak  perusahaan
PT  Hutama  Karya  Persero  yang  bergerak  dalam bidang usaha properti. Pemegang saham PT Hakapole
adalah Perseroan dan YKK PT Hutama Karya dengan masing-masing  kepemilikan  saham  sebesar  99,75
dan 0,25. Sebagai perusahaan yang bergerak dalam bidang  usaha  manufaktur,  PT  Hakapole  senantiasa
mendukung usaha Perseroan dalam bidang konstruksi. PT  Hakapole  menawarkan  produk  berkualitas  atas
Tiang PJU, Tanki, Rental Scafolding, Bucket Cor, serta Tiang High MastTriangle.
PT HK Realtindo PT  HK  Realtindo  is  a  subsidiary  of  PT  Hutama  Karya
Persero  engaged  in  property.  The  Shareholders of  PT  HK  Realtindo  are  the  Company  and  YKK  PT
Hutama  Karya  with  the  share  ownership  amounting to  99.75  and  0,25  respectively.  As  a  company
engaged in property, PT HK Realtindo always support the  Company’s  business  in  the  ield  of  construction.
HK  Realtindo  provides  three  types  of  integrated services, namely strategic partnership in property
construction for housing or commercial projects, up to the management of customers’ project.
Table  of  inancial  performance  information  of PT HK Realtindo 2014
In Billion Rupiah
PT Hakapole PT  Hakapole  is  a  subsidiary  of  PT  Hutama  Karya
Persero engaged in property. The Shareholders of PT Hakapole are the Company and YKK PT Hutama Karya
with  the  share  ownership  amounting  to  99.75  and 0,25.  As  a  company  engaged  in  manufacturing,  PT
Hakapole always support the Company in the ield of construction. PT Hakapole ofers qualiied products on
PJU Pole, Tank, Scafolding Rental, Cast Bucket, as well as High MastTriangle Pole.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l	Pe ru
sah aan
Comp an
y Proi
le
T in
ja u
a n
Un it
Pen d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
T a
ta K
elola Per
u sa
h a
a n
G ood
Corp orat
e G
ov ern
an ce
T a
n g
g u
n g
J a
w a
b S
osia l
Per u
sa h
a a
n
Corp orat
e Soc
ial R
es p
on si
b il
it y
123
Annual Report 2014 | PT HUTAMA KARYA Persero
Tabel  informasi  kinerja  keuangan  PT  Hakapole 2014
Dalam Miliar Rupiah
Uraian Description RKAP 2014
Realisasi 2014 Realization in 2014
Persentase Realisasi Terhadap Anggaran
Tahun 2014  Percentage of Realization Toward
Budget Year 2014
Pendapatan Usaha Operating Revenue
243,11 17,50
7,20 Beban Kontrak
Contract Expenses 215,77
17,94 8.31
Rugi Usaha Business Loss
31,32 3,51
11.21 Rugi Setelah Pajak
Loss After Tax 22,59
10,45 -46.26
PT Hakaaston PT Hakaaston merupakan entitas anak perusahaan PT
Hutama Karya Persero yang bergerak dalam bidang usaha perdagangan. Pemegang saham PT Hakaaston
adalah Perseroan dan YKK PT Hutama Karya dengan masing-masing  kepemilikan  saham  sebesar  99,75
dan 0,25. Sebagai perusahaan yang bergerak dalam bidang usaha perdagangan, PT Hakaaston senantiasa
mendukung usaha Perseroan dalam bidang konstruksi.
PT  Hakaaston  menyediakan  berbagai  produk  untuk pembangunan jalan raya, bandara, jalan, parkir dan
lain-lain.  Produk  PT  Hakaaston  meliputi  beton  aspal, Aspal Asphalt Emulsion, foundation layer kelas Agregat
A dan kelas B serta rock burst untuk campuran beton, dan perdagangan khusus aspal dan semen.
Tabel informasi kinerja keuangan PT Hakaaston 2014
Dalam Miliar Rupiah
Uraian Description RKAP 2014
Realisasi 2014 Realization in 2014
Persentase Realisasi Terhadap Anggaran
Tahun 2014  Percentage of Realization Toward
Budget Year 2014
Pendapatan Usaha Operating Revenue
450,39 295,39
65,58 Beban Kontrak
Contract Expenses 410,51
259,49 63,21
Laba Usaha Operating Proit
36,33 26,64
73,31 Laba Setelah Pajak
Proit After Tax 27,85
18,96 68,09
Information on the Performance of Subsidiaries in 2014
Table  of  information  on  inancial  performance  of  PT Hakapole in 2014
In Billion Rupiah
PT Hakaaston PT Hakaaston is a subsidiary company of PT Hutama
Karya  Persero  engaged  in  the  business  sector  of trading.  The  shareholder  of  PT  Hakaaston  are  the
Company  itself  and  YKK  PT  Hutama  Karya  with  the amount of share of 99.75 and 0,25 respectively.  As
a company engaging in the business sector of trading, PT Hakaaston supports the business of the Company
in ield on construction.
PT  Hakaaston  provides  various  products  for  the construction of road, airport, street, parking lot, and
others.  Products  of  PT  Hakaaston  includes  asphalt concrete, asphalt emulsion, foundation layer class A
aggregate and class B, as well as rock burst for concrete mix, and trade of asphalt and concrete.
Table of information on the inancial performance of PT Hakaaston in 2014
In Billion Rupiah
Tingkat kompetisi dalam industri konstruksi semakin ketat. Perseroan menyadari bahwa untuk memenangkan persaingan yang ada membutuhkan keunggulan kompetitif tertentu. Oleh karena
itu, Perseroan membentuk manajemen sumber Daya Manusia yang unggul, menerapkan teknologi informasi yang modern, serta senantiasa memberikan karya terbaik dalam sentuhan produk dan
jasa Perseroan kepada seluruh pelanggan.
Competition level in the construction industry is increasingly tight. The Company realizes that special competitive advantage is required to win the competition that the Company faces. Therefore, the Company
establishes excellent Human Resources management, implements modern information technology, and continuously delivers the best results through the Company’s products and services to all customers.
tinjaUan Unit pendUkUng
suPPorTIng bussIness revIew
Sumber Daya Manusia
Human Resources
Teknologi Informasi
Information Technology
126 141
126
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Human Resources
Sumber Daya Manusia SDM merupakan aset penting sebagai  human capital yang dimiliki Perseroan guna
mencapai  visi,  misi,  dan  tujuan  Perseroan.  SDM  juga menjadi faktor penting dalam meraih keunggulan
bersaing dibandingkan oleh kompetitor sejenis. Karena itu, Perseroan menerapkan sistem standar manajemen
SDM  yang  berkualitas  dalam  meningkatkan  kualitas dan kompetensi karyawan dengan pengembangan
yang  bersifat komprehensif dan terintegrasi guna membangun sistem pengelolaan kebijakan human
capital.
Pengelolaan  Human Capital menggunakan modul Competency Based Human Resource Management
CBHRM. CBHRM
merupakan modul
yang dikembangkan Perseroan meliputi kamus
kompetensi,  proil  kompetensi,  sistem  assessment, sistem manajemen  kinerja,  sistem karier, sistem
pengembangan karyawan, serta sistem kompensasi. Modul tersebut ditujukan untuk meningkatkan
kualitas layanan dan produktivitas karyawan dengan menciptakan tenaga kerja yang berkualitas, profesional,
dan menjunjung tinggi nilai-nilai  Perusahaan.
Stretegi pengelolaan yang dilakukan Perseroan adalah dengan mengerahkan seluruh sumber daya
dan kemampuan yang dimiliki untuk merespon tantangan dan menyesuaikan diri terhadap tuntutan
pasar yang dinamis agar perusahaan menjadi kuat dan kompetitif. Setiap karyawan diberi kesempatan
untuk mengambil peran yang lebih besar dari tugas dan tanggungjawabnya untuk memberikan kontribusi
optimal bagi pencapaian kinerja perusahaan.
Pengelolaan  SDM  Perseroan  dilakukan  oleh Departemen  Sumber  Daya  Manusia  yang  memiliki
tugas  pokok  untuk  mengelola  dan  membina  SDM sebagai penggerak usaha Perseroan sebagai berikut:
•  Perumusan kebijakan dan sistem manajemen SDM; •  Perencanaan organisasi dan kebutuhan SDM;
•  Manajemen SDM; serta •  Penilaian kinerja individu.
Human  Resources  HR  is  an  important  asset  as  the human capital that belongs the Company to achieve
the vision, mission, and objectives of the Company. Human  Resources  also  become  important  factor  to
achieve competitive advantage compared to similar competitor.  Therefore,  the  Company  implemented
a quality system of human resources standards management in improving the quality and competence
of employees, with development that comprehensive and integrated in order to build human capital
management policy.
Human Capital Management using Competency Based Human  Resource  Management  CBHRM  modules.
CBHRM is a module that developed by The Company include  competency  dictionary,  competency  proiles,
assessment system, performance management system, career system, development employees
system,  and  also  compensation  system.  The  module intended to improve the quality of service and
employee productivity by creating quality energy of work, professional, and uphold high values of the
Company.
HR MANAGEMENT ORGANiZATiON sTRUCTURE
Management strategies which conducted by the Company to mobilize all the resources and capabilities
to respond the challenges and adapt to the demands of dynamic market for the company to be strong and
competitive. Each employee was given the opportunity to take greater role of task and responsibility to provide
an optimal contribution to company’s performance achievement.
Human  Resource  Management  of  the  Company conducted  by  Human  Resources  Department  which
has the main task to manage and develop human resources as a driver of business of the Company is:
•  Policy formulation and management system HR; •  Planning and organization of human resources
needs; •  Human Resource Management; and
•  Assessment of individual performance.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
T in
jau an
U n
it Pe
n d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
127
Annual Report 2014 | PT HUTAMA KARYA Persero
Pengelolaan human capital menggunakan modul
Competency Based Human Resource Management
CBHRM.
Human Capital Management using Competency Based Human
Resource Management CBHRM modules.
Human Resources
808 849
815
2012 2013
2014
Jumlah Sumber Daya Manusia Number of Human Resources
Jumlah Peserta Pelatihan dan Pengembangan Number of Participants Training and Development
2014 550
281 255
2013 2012
128
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Department of HR operated under Directorate of HR General Afairs. HR department consists of several
part  of  the  Human  Resources    Organizational Development  Division,  HR  Operations  Section  and
the General Section. HR management structure of the Company is follows:
Department of Human Resources HR  departments  have  an  important  role  to  provide
employment guidelines in order to move the Company’s business.  Company  through  the  Department  of
Human Resources preparing and issuing policies such as recruitment, career development, training and
development, as well as other policies.
Compotition of Employee Company Based on Positition Level
Departemen SDM berada di bawah Direktorat SDM Umum. Departemen SDM terdiri dari beberapa bagian
yakni  Bagian  Pengembangan  SDM    Organisasi, Bagian Operasional SDM, dan Bagian Umum. Struktur
pengelolaan SDM Perseroan adalah sebagai berikut:
Departemen sDM Departemen  SDM  memiliki  peran  penting  dalam
memberikan panduan kerja guna menggerakkan usaha Perseroan. Perseroan melalui Departemen SDM
menyusun dan mengeluarkan berbagai kebijakan seperti proses rekrutmen, pengembangan karier,
pelatihan dan pengembangan, serta kebijakan lainnya.
Komposisi Karyawan Perseroan Berdasarkan Level jabatan
Uraian  Description 2014
2013 Perubahan
Changes Persentase
Percentage GM  Setingkat
GM  Alike 19
22 3
14,29 Senior Manager  Setingkat
Senior Manager Alike
50 64
14 21,88
Manager  Setingkat Manager  Alike
27 18
9 50,00
Staf Staf
371 358
13 3,63
Personil Inti Proyek Project Personnel
348 384
36 9,38
jumlah  Total 815
846 31
3,66
GM  Setingkat GM  Alike
Senior Manager  Setingkat Senior Manager  Alike
Manager  Setingkat Manager  Alike
Staf Staf
Personil Inti Proyek Project Personnel
Diagram Komposisi Karyawan Perseroan Berdasarkan Level jabatan Diagram Compotition of Employee Company Based on Positition Level
2014 2013
371 358
348 384
50 64
27 18
19 22
Human Resources
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
T in
jau an
U n
it Pe
n d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
129
Annual Report 2014 | PT HUTAMA KARYA Persero
Employee’s Compotition Based on Education
Employee’s Composition Based on Employment status
Komposisi Karyawan Berdasarkan Pendidikan Uraian  Description
2014 2013
Perubahan Changes
Persentase Percentage
S2 Master’s degree
62 56
6 10,71
S1 Bachelor’s degree
402 403
1 0,25
D3 Diploma III
71 89
18 20,22
SLTA – D2 Senior High School – Diploma II
267 285
18 6,32
SLTP dan Lainnya Junior High School and Others
13 13
0,00
jumlah  Total 815
846 31
3,66
71
S2 Master’s degree
S1 Bachelor’s degree
D3 Diploma III
SLTA – D2 Senior High School – Diploma II
SLTP dan Lainnya Junior High School and Others
402 267
62 13
Diagram Komposisi Karyawan Berdasarkan Pendidikan Diagram of Employee’s Compotition Based on Education
2014
89 403
285 56
13
2013
Komposisi Karyawan Berdasarkan status Kepegawaian
Uraian  Description 2014
2013 Perubahan
Changes Persentase
Percentage Tetap
Permanent 815
846 31
3,66 Kontrak
Outsources 386
486 100
20,58
jumlah  Total 1.211
1.332 121
9,08
386
Tetap Permanent
Kontrak Outsources
815 846
486
2014 2013
Diagram Komposisi Karyawan Berdasarkan status Kepegawaian Diagram of Employee’s Composition Based on Employment status
Human Resources
130
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Komposisi Karyawan Berdasarkan Usia Uraian  Description
2014 2013
Perubahan Changes
Persentase Percentage
50 – 54 159
115 44
38,26 45 – 49
196 213
17 7,98
40 – 44 163
174 11
6,32 35 – 34
78
135
57
42,22 30 – 34
73
73 0,00
25 – 29
77
69
8
11,59 20 – 24
69
67
2
2,99
jumlah  Total
815
846
-31
3,66
2014 2013
115 50–54
40–44 45–49
35–34 30–34
213
174 135
73 69
67
196 163
78 73
77 69
59
Komposisi Karyawan Berdasarkan jenis Kelamin Uraian  Description
2014 2013
Perubahan Changes
Persentase Percentage
Pria Men
756 783
27 3,45
Wanita Women
59 63
4 6,35
jumlah  Total 815
846 31
3,66
Pria Men
Wanita Women
756 783
59 63
2014 2013
Diagram Komposisi Karyawan Berdasarkan jenis Kelamin Diagram of Employee’s Composition Based on Gender
Human Resources
Employee’s Composition Based on Age
Employee’s Composition Based on Gender
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
T in
jau an
U n
it Pe
n d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
131
Annual Report 2014 | PT HUTAMA KARYA Persero
Komposisi Karyawan Berdasarkan Keahlian Uraian  Description
2014 2013
Perubahan Changes
Persentase Percentage
Teknik Technic
587 591
4 0,68
Non Teknik Non Technic
228 255
27 10,59
jumlah Total 815
846 31
3,66
Teknik Technic
Non Teknik Non Technic
587 591
228 255
2014 2013
Diagram Komposisi Karyawan Berdasarkan Keahlian Diagram of Employee’s Composition Based on skills
Proses Rekrutmen Pada 2014, jumlah karyawan Perseroan sebanyak
815  orang.  Jumlah  tersebut  mengalami  penurunan 3,80  dibandingkan pada 2013 sebanyak 815 orang.
Penurunan in disebabkan karena Perseroan merekrut karyawan baru sebanyak 38 orang serta pengurangan
karyawan  sebanyak  69  orang  karena  pensiun.  Selain itu, Perseroan juga menerapkan kebijakan untuk
merekrut tenaga kerja tertentu melalui outsourcing.
Perseroan melakukan rekrutmen dengan menerapkan prinsip keterbukaan, kewajaran, dan kesetaraan.
Proses seleksi dilakukan berdasarkan kebutuhan dan kompetensi yang dimiliki calon karyawan. Calon
karyawan dijaring melalui beragam cara mulai dari website Perseroan, iklan media cetak, job fair, referensi,
serta melalui head hunter untuk posisi tertentu.
Perseroan merekrut karyawan baru secara selektif dari berbagai perguruan tinggi negeri dan swasta
terkemuka dengan indeks prestasi dan potensi yang memadai. Calon karyawan yang diterima kemudian
diberikan pelatihan dan pengembangan kompetensi serta pengenalan Perseroan secara intensif guna
mempercepat proses adaptasi dan meningkatkan kemampuannya untuk bekerja.
Human Resources
Employee’s Composition Based on skills
Recruitment Process In 2014, total number of employees in Company 815
peoples. That number has decreased 3.80 compared to  2013  as  many  as  815  people.  This  decrease  was
because the Company recruited new employees as many  as  38  people  and  reduced  the  number  of  its
employees at 69 people due to retirement. In addition, the Company also implemented policy to recruit
speciic labor through outsourcing.
Company does recruitment by applying the principles of  openness,  fairness,  and  equality.  The  selection
is based on need and competency of candidates. Employee candidates through a variety of ways
ranging  from  The  Company’s  website,  print  ads,  job fairs, references, as well as through a head hunter for
a particular position.
The  Company  selectively  recruit  new  employees from various public and private universities leading
to the achievement and potential index adequate. Prospective employees received later given training
and competence development as well as the Company’s intensive introduction to accelerate the
process of adaptation and increase ability to work.
132
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Pengembangan Karier Perseroan menjunjung tinggi aspek kesetaraan di
antara karyawan. Karena itu, Perseroan memberikan kesempatan yang sama bagi tiap individu untuk
mencapai tingkat posisi dalam struktur organisasi yang tinggi berdasarkan kemampuannya. Perseroan
melalui  Departemen  SDM  dan  Umum  telah  memiliki program dan kebijakan pengembangan karier seperti
promosi jabatan dan grade. Peningkatan karier di Perseroan senantiasa memperhatikan penilaian
kinerja masing-masing karyawan.
Pelatihan dan Pengembangan sDM Guna meningkatkan kualitas sumber daya manusia
yang profesional, andal dengan integritas yang tinggi, Perseroan menyelenggarakan program-
program pelatihan dan pengembangan SDM  melalui program pelatihan yang terencana dan terukur
termasuk pengelolaan sumber daya manusia berbasis kompetensi  competency based  serta  pemberian
remunerasi  yang  kompetitif.  Dengan  program yang terintegrasi dengan baik, diharapkan seluruh
karyawan siap dengan tantangan ke depan yang semakin meningkat.
Setiap  karyawan  mendapatkan  kesempatan  yang setara  dalam  meningkatkan  kompetensi  sesuai
dengan potensi, kemampuan dan keterampilan yang dibutuhkan. Pemberdayaan kemampuan karyawan
dilaksanakan dengan menyelenggarakan berbagai program pendidikan dan pelatihan, baik di internal
dan eksternal, meliputi peningkatan pada keahlian keterampilan teknis serta peningkatan manajerial
kepemimpinan,  mencakup  pelatihan  internal eksternal yang diselenggarakan di tingkat nasional
maupun internasional, baik dalam bentuk workshop dan seminar-seminar.
Human Resources
Career Development The  Company  upholds  aspect  of  equality  between
employees.  Therefore,  the  Company  provides  same opportunity for each individual to reach the level
of the position in the high structure organizational structure based on their ability. Company through the
Department of Human Resources and General already has programs and policies such as career development
promotion and grade. Advancement career of Company observes the assessment performance of
each employee.
Training and Human Resources Development In order to improve the quality of human resources
professional, reliable, with high integrity, Company organizes training programs and development of
human resources through planned and measured including human resource management based
competency  competency-based  as  well  as  the provision of competitive remuneration. With this
program well integrated, it is expected the whole employees are ready to challenge the future more
increasing.
Each employee has a same chance to improve their competence in accordance with the potential, abilities
and required skill. Empowerment of employees conducted by organizing various programs of
education and training, both internal and external, including enhancing the skills or technical skills as
well increased in managerial and leadership, training includes internal or external, held at national and
international levels, both in the form of workshops and seminars.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
T in
jau an
U n
it Pe
n d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
133
Annual Report 2014 | PT HUTAMA KARYA Persero
Kepemilikan Sertiikat Keahlian dan Keterampilan
Sertiikasi		Certiication jumlah  Total orangpersons
Sertiikasi Keahlian Expertise Certiication
303 Sertiikasi Ketrampilan
Skills Certiication 189
Tabel Pelatihan dan Pengembangan SDM pada 2014
jenis Pelatihan Kemampuan Dasar  Basic skill Training
Penyelenggara Organizer
Hari Days
jamHari Hours
Days Hari
jam Days
Hours jml Peserta
Total Participant
Kategori  Category
Magang Proyek Angkatan 14 Project Internship Batch 14
Internal - Div SDMU 14
8 112
7 Kemampuan Dasar Basic Skill
Presentasi  Sharing OJT 6 Bulanan Angkatan 13
6 Monthly OJT Presentation  Sharing Batch
13 Internal - Div SDMU
3 8
24 38 Kemampuan Dasar
Basic Skill
Human Resources
Perseroan menjunjung tinggi
aspek kesetaraan di antara
karyawan.
The Company Upholds An
Equality Aspect Among Employees.
Certiication Ownership of Expertise and Skills
Table of HR training and development in 2014
134
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
jenis Pelatihan Kemampuan Dasar  Basic skill Training
Penyelenggara Organizer
Hari Days
jamHari Hours
Days Hari
jam Days
Hours jml Peserta
Total Participant
Kategori  Category
Pembekalan Manajemen Dasar Angkatan 14
Basic Management Provisioning Batch 14
Internal - Div SDMU 2
8 16
17 Kemampuan Dasar Basic Skill
PRESENTASI  SHARING OJT 1 th Angkatan 13
1 year OJT PRESENTATION  SHARING Batch
13 Internal - Div SDMU
3 8
24 38 Kemampuan Dasar
Basic Skill PRESENTASI OJT 6 BULANAN
ANGKT. 2014 Angkatan 14 BATCH 2014 6 MONTHLY OJT
PRESENTATION Batch 14 Internal - Div SDMU
1 10
10 10
Kemampuan Dasar Basic Skill
Pelatihan Pusdikzi - Kepemimpinan Lapangan Angkatan V
Pusdikzi Training - Field Leadership Batch
V HK - Pusdikzi Bogor
15 10
150 33
Leadership Pelatihan Pusdikzi - Kepemimpinan
Lapangan Angkatan VI Pusdikzi
Training – Field Leadership Batch VI
HK - Pusdikzi Bogor 14
24 336
38 Leadership
Jenis	Pelatihan	Teknis Leadership  Type of Training of
Technical		Leadership Penyelenggara
Organizer hari
days jamhari
hours days
hari jam
days hours
jml Peserta Total
Participant Kategori  Category
Inhouse Training Akselerasi Kepala Proyek batch 1
Inhouse Training of Project Head Acceleration
batch 1 Internal - Div SDMU
6 10
60 29
Teknis  Leadership Technic
Leadership Inhouse Training Akselerasi Kepala
Proyek batch 2 Inhouse Training
of Project Head Acceleration batch 2
Internal - Div SDMU 6
10 60
29 Teknis  Leadership
Technic Leadership
Inhouse Training Peningkatan Kompetensi Kepala Proyek batch
3 Inhouse Training of the
Improvement of Project Head Competency batch 3
Internal - Div SDMU 3
10 30
32 Teknis  Leadership
Technic Leadership
Inhouse Training Peningkatan Kompetensi Kepala Proyek batch
4 Inhouse Training of the
Improvement of Project Head Competency batch 4
Internal - Div SDMU 3
10 30
35 Teknis  Leadership
Technic Leadership
Inhouse Training Peningkatan Kompetensi Kepala Proyek batch
5 Inhouse Training of the
Improvement of Project Head Competency batch 5
Internal - Div SDMU 3
10 30
37 Teknis  Leadership
Technic Leadership
Pelatihan Akselerasi Personil Inti Proyek untk SEM, SOM, K3L
Training of Project Core Personnel Acceleration for SEM, SOM, K3L
Internal - Div SDMU 3
8 24
25 Teknis  Leadership
Technic Leadership
Pelatihan Akselerasi Personil Inti Proyek untk SAM
Training of Project Core Personnel
Acceleration for SAM Internal - Div SDMU
3 8
24 15
Teknis  Leadership Technic
Leadership
Human Resources
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
T in
jau an
U n
it Pe
n d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
135
Annual Report 2014 | PT HUTAMA KARYA Persero
jenis Pelatihan Kemampuan Dasar  Basic skill Training
Penyelenggara Organizer
Hari Days
jamHari Hours
Days Hari
jam Days
Hours jml Peserta
Total Participant
Kategori  Category
Pembekalan Engineer Muda PT Hutama Karya Persero
Provisioning of Young Engineering of PT Hutama Karya Persero
Internal -  Wilayah VII Jatim, Jateng
DI. Yogyakarta Internal -  Region
VII East Java, Central Java  DI.
Yogyakarta 2
8 16
27 Teknis  Leadership
Technic Leadership
Pelatihan Personil Inti Proyek SEMSOM dan Calon SEMSOM
Training of Project Core Personnel for SEMSOM and the candidate of
SEMSOM Internal -  Divisi
Gedung Building
Division 2
9 18
33 Teknis  Leadership
Technic Leadership
Pelatihan Personil Inti Proyek PSMK3L dan Calon PSMK3L
Training of Project Core Personnel for PSMK3L and the Candidate of
PSMK3 L
Internal -  Divisi Gedung
Building Division
1 8
8 17
Teknis  Leadership Technic
Leadership Pelatihan Personil Inti Proyek
SAM dan Calon SAM Training of
Project Core Personnel for SAM and the Candidate of SAM
Internal -  Divisi Gedung
Building Division
1 8
8 29
Teknis  Leadership Technic
Leadership Finon Batch I
HK - Lembaga Manajemen UI
UI Management Institution
3 10
30 24
Teknis  Leadership Technic
Leadership Finon Batch II
HK - Lembaga Manajemen UI
UI Management Institution
3 10
30 23
Teknis  Leadership Technic
Leadership Pelatihan Site Manager
Site Manager Training Internal -  Wilayah I
Internal -  Wilayah I
3 8
24 31
Teknis  Leadership Technic
Leadership Workshop Peralatan
Equipment Workshop Internal -  Divisi
Gedung Building
Division 1
8 8
42 Keterampilan Teknis
Technic Skill Kursus Brevet Pajak A-B
A-B Tax Brevet Workshop
Internal - Div SDMU SDMU Division
36 3
108 10
Keterampilan Teknis Technic Skill
Workshop Trade FinanceSKBDN
Trade FinanceSKBDN Workshop HK - BNI Divisi
Trade Trade
Division 1
8 8
36 Keterampilan Teknis Technic Skill
Pelatihan Penanganan dan Penanggulangan Kebakaran
Fire Handling and Prevention Training
Internal - Wilayah III Region III
1 8
8 15 Keterampilan Teknis
Technic Skill Pelatihan Upgrade ISO 9001:2015
dan ISO 14001:2015  I SO
9001:2015 and ISO 14001:2015 Upgrade Training
HK - BSI Grup Indonesia
2 8
16 21
Keterampilan Teknis Technic Skill
One Day Workshop : ESKALASI
Internal -  Divisi Gedung
Building Division
1 8
8 75 Keterampilan Teknis
Technic Skill Sosialisasi P4GN Pencegahan
penyalahgunaan dan peredaran gelap narkoba
P4GN Socialization Prevention of misuse and spread
of drugs HK - BNN
1 8
8 44
Keterampilan Teknis Technic Skill
Human Resources
136
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
jenis Pelatihan Kemampuan Dasar  Basic skill Training
Penyelenggara Organizer
Hari Days
jamHari Hours
Days Hari
jam Days
Hours jml Peserta
Total Participant
Kategori  Category
Pelatihan Sosialisasi PP No. 50 Tahun 2012  Penyegaran
SMMK3L Hutama Karya Training
of Dissemination of PP No. 50 of 2012  SMMK3L Refreshment of
Hutama Karya Internal - Divisi
Sistem Risiko Risk
System Division 2
7 14
16 Keterampilan Teknis Technic Skill
Penyegaran SMMK3L 2014 dan Sosialisasi SMK3 Versi PP 50 tahun
2014 SMMK3L Refreshment and
Dissemination of SMK3 Version PP 50 of 2014
Divisi Sistem Risiko
Risk System Division
- Semua Wilayah
Divisi All Region
Division 2
8 16
103 Keterampilan Teknis Technic Skill
Pemantapan Pelaksanaan Simpro The Strengthening of Simpro
Implementation Internal - Divisi
Teknik  Produksi Engineering
Production Division 1
8 8
43 Keterampilan Teknis Technic Skill
Pelatihan Pemahaman Penggunaan  Fungsi Alat
Pelindung Diri Training of
Understanding the Use  Function of Personal Protective Equipment
Internal - HK Wilayah V
HK Region V
1 8
8 50 Keterampilan Teknis
Technic Skill Penyegaran Bidang Administrasi
dan Keuangan Refreshment of
Administration and Financial Internal - Divisi
Keuangan Financial Division
2 7
14 21
Keterampilan Teknis Technic Skill
Pemahaman Bahaya Potensial Ergonomi  Fisik
Understanding the potential danger of ergonomic
physic Internal - HK
Wilayah V HK
Region V 1
8 8
37 Keterampilan Teknis Technic Skill
Pelatihan  Sertiikasi P3K P3K
Training  Certiication Internal - HK
Wilayah VII  HK Region VII
3 8
24 15 Keterampilan Teknis
Technic Skill Sertiikasi Auditor MK3
Kemenakertrans RI Certiication
of MK3 Auditor of Kemenakertrans RI
HK - Kemenakertrans
3 8
24 4
Keterampilan Teknis Technic Skill
jenis Pelatihan Manajerial Managerial Training
Penyelenggara Organizer
Hari Days
jamHari Hours
Days Hari
jam Days
Hours jml Peserta
Total Participant
Kategori  Category
Workshop Values Internalization HK - ESQ Consultan
2 16
32 35
Manajerial Managerial
Human Resources
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
T in
jau an
U n
it Pe
n d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
137
Annual Report 2014 | PT HUTAMA KARYA Persero
jenis Pelatihan Kemampuan Dasar  Basic skill Training
Penyelenggara Organizer
Hari Days
jamHari Hours
Days Hari
jam Days
Hours jml Peserta
Total Participant
Kategori  Category
Training for Trainers Internal - Div SDMU
1 11
11 24
Manajerial Managerial
Pelatihan Public Speaking and Personality Development Training
of Public Speaking and Personality Development
Internal - HK wilayah VII HK
region VII 1
8 8
22 Manajerial
Managerial
Sepanjang 2014, Perseroan telah menyelenggarakan sebanyak  176  pelatihan  yang  terdiri  dari  pelatihan
primer, pelatihan kemampuan dasar, keahlian teknis, dan manajerial serta kepemimpinan. Biaya pelatihan
dan pengembangan kompetensi karyawan pada 2014 adalah sebesar Rp7,56 miliar, naik 91 dibandingkan
pada 2013 sebesar Rp3,96 miliar.
survei Kepuasan Karyawan
44 48
Sangat Tidak Puas Very Dissatisied
Tidak Puas Dissatisied
Berdasarkan Sample yang Diambil Perseroan Based on sample taken by the Company
Cukup Puas Fairly Satisied
Puas Satisied
Sangat Puas Very Satisied
22 19
26 23
6 7
2 2
Kepuasan Karyawan Terhadap Prestasi Diri pada Pekerjaannya
Employee satisfaction to self achievement in their job
Kepuasan Karyawan Terhadap Lingkungan Kerjanya
Employee satisfaction to work environment
2014 2014
Throughout  2014,  the  Company  has  organized 176  training  consisting  of  primary  training,  basic
skills training, technical expertise, managerial and leadership. Training costs and employee competence
development in 2014 amounted to Rp7,56 billion, up 91 compared to 2013 by Rp3,96 billion.
Employee satisfaction survey
Human Resources
138
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Produktivitas sDM Produktivitas SDM diukur melalui jumlah pendapatan
yang dihasilkan masing-masing karyawan, yaitu dengan membagi pendapatan usaha Perseroan
dengan  jumlah  SDM.  Pada  2014,  pendapatan  usaha Perseroan sebesar Rp5,72 triliun dengan jumlah SDM
sebanyak  815  orang  maka  tingkat  produktivitas  per masing-masing  SDM  adalah  sebesar  Rp7,01  miliar
orangtahun.
Remunerasi dan Kesejahteraan Di  tengah  persaingan  industri  konstruksi  yang
semakin kompetitif, kemampuan mengembangkan diri dan menciptakan nilai bagi perusahaan sangatlah
krusial agar Perusahaan dapat memberikan layanan prima dan profesional secara berkelanjutan. Sebagai
bentuk komitmen Perusahaan dalam menciptakan keunggulan, Perseroan menjamin kesejahteraan
karyawannya dengan memberikan kompensasi berupa gaji yang memadai dan tunjangan-tunjangan
kesejahteraan lainnya. Sistem remunerasi karyawan diterapkan berdasarkan hasil kajian konsultan,
yaitu penerimaan gaji pokok dan gaji terkait dengan tunjangan dan termasuk program pensiun dan
program pelayanan kesehatan pasca-kerja, tunjangan medis untuk mereka sendiri dan beberapa anggota
keluarga inti, tunjangan perumahan dan tunjangan tertentu lainnya.
Tabel Gaji Tertinggi dan Terendah Tahun 2014 Komponen Gaji  salary Component
Tertinggi  Highest Terendah  Lowest
Gaji Pokok Basic Salary
8.472.000 2.551.000
Tunjangan Allowance
23.809.642 2.458.135
HR Productivity HR  productivity  is  measured  by  amount  of  revenue
produced by each employee, dividing the Company’s revenues by number of human resources. In 2014,
operating  revenues  Liability  for  Rp5,72  trillion  by the  number  of  HR  as  many  as  815  people,  the  level
of productivity per HR respectively amounted Rp7,01 billion  person  year.
Remuneration and Welfare In the middle of construction industry competition
which is competitive, the ability to develop themselves and create value for the company is crucial for
Company to provide services professional excellence and sustainable manner. As a commitment of
Company to creating an excellence, the Company guarantees employees welfare with compensation
such as compensation salaries and welfare allowance. Employee remuneration system applied based on the
results of the study consultant, namely the acceptance of  a  basic  salary  and  linked  to  beneits  including
pension programs and program of health care post- employment,  medical  beneits  for  themselves  and
immediate family members, housing allowance and certain other allowances.
Tables of Highest and Lowest salary Tables in 2014
Human Resources
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
T in
jau an
U n
it Pe
n d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
139
Annual Report 2014 | PT HUTAMA KARYA Persero
Welfare and Employee Protection Program
The  Company  continues  to  provide  high  attention against  the  employee.  That  attention  is  visible  to
providing decent work and harmony with program development, technology, and number of employees.
The  Company  also  provides  high  attention  to employees through welfare programs and courses
protection for employees and families. Some beneits received by employees in terms of their welfare and
protection program as follows:
•   Social  security  and  welfare  programs  covering Social Security insurance Insurance Risk of Death,
Work  accidents,  and  Old  Age,  money  marriage donation, donations grief, facilities arts and sports,
recreation fee, business cooperatives, as well as worship facilities;
•  Health,  Safety  and  Environment  Program,  by providing facilities and protective devices
personal protection, establishment Committee Development  of  Occupational  Health  and  Safety,
and work equipment provision;
•   Examination,  treatment  and  care  program; by providing clinic company to employee,
implementation of check up and health examinations of employees, examination and
the treatment of employees, reimbursement hospitalization and surgery, replacement of
teeth, Family Planning, reimbursement birth, and replacement cost of glasses;
•   Companies of duty include annual leave, Long-term leave, menstruation leave, maternity leave, and
special leave because of a wedding, circumcision baptism, and others.
Kesejahteraan dan Program Perlindungan Karyawan
Perseroan senantiasa memberikan perhatian yang tinggi terhadap karyawan. Perhatian tersebut terlihat
dari penyediaan tempat kerja yang layak dan selaras dengan perkembangan program, teknologi, serta
jumlah karyawan. Perseroan juga memberikan perhatian yang tinggi kepada karyawan melalui
program-program kesejahteraan maupun program perlindungan bagi karyawan dan keluarga. Beberapa
keuntungan yang diterima karyawan dalam hal kesejahteraan dan program perlindungan karyawan
sebagai berikut: •  Program jaminan sosial dan kesejahteraan meliputi
asuransi  Jamsostek  Jaminan  Risiko  Kematian, Kecelakaan  Kerja,  dan  Hari  Tua,  sumbangan
uang perkawinan, sumbangan uang duka, fasilitas kesenian dan olah raga, biaya rekreasi, usaha
koperasi, serta fasilitas ibadah;
•  Program  Keselamatan,  Kesehatan  Kerja  dan Lingkungan, dengan menyediakan fasilitas dan
alat proteksi pelindung diri, pembentukan Panitia Pembinaan Keselamatan dan Kesehatan Kerja, dan
penyediaan perlengkapan kerja;
•  Program pemeriksaan, pengobatan dan perawatan kesehatan karyawan dengan menyediakan
klinik perusahaan, pelaksanaan check up dan pemeriksaan kesehatan karyawan, pemeriksaan
dan pengobatan karyawan, penggantian biaya rawat inap dan operasi, penggantian gigi, Keluarga
Berencana,  penggantian  biaya  kelahiran,  dan penggantian biaya kacamata;
•  Program cuti perusahaan antara lain cuti tahunan, cuti besar, cuti haid, cuti melahirkan, dan cuti
khusus karena melangsungkan pernikahan, khitananpembaptisan, dan lain-lain.
Human Resources
140
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Penghargaan Karyawan Berprestasi Perseroan senatiasa memberikan penghargaan
kepada karyawan berprestasi sebagai bentuk apresiasi atas kinerja dan dedikasi yang diberikan
kepada Perseroan. Penghargaan kepada karyawan berprestasi juga ditujukan untuk memotivasi dan
menjadi  panutan  bagi  karyawan  lainnya.  Beberapa bentuk penghargaan kepada karyawan yang diberikan
oleh Perseroan, sebagai berikut: •
Penghargaan  Satya  Karya  bagi  karyawan  yang telah berdinas 10 tahun, 20 tahun, dan 30 tahun.
• Penghargaan  Teladan  bagi  karyawan  yang
berdedikasi dan berprestasi tinggi bagi Perseroan. Penghargaan diselenggarakan setiap tahun.
• Penghargaan  kinerja  berupa  premi  eisiensi
proyek, premi kinerja wilayahdivisi, dan bonus korporasi.
• Pin Reward bagi karyawan yang berprestasi baik
internal maupun eksternal yang menaikkan citra perusahaan.
• Penghargaan  Purna  Bhakti  bagi  karyawan  yang
telah memasuki usia pensiun.
Perlakuan Adil dan setara Meski Perseroan beroperasi di berbagai wilayah
dengan keberagaman agama, budaya, tradisi, adat istiadat, kondisi, dan persyaratan ketenagakerjaan
yang berbeda-beda, namun Perseroan memberikan kesempatan yang setara kepada pekerja dalam
mengembangkan karier sesuai dengan potensi, karakter dan tingkat profesionalitasnya. Setiap individu
dinilai dan diukur berdasarkan sistem yang transparan serta pencapaian kinerja masing-masing karyawan.
Perlakuan adil dan setara bagi seluruh karyawan diharapkan mampu menumbuhkan motivasi untuk
terus  memperkuat  Perusahaan.  Terhadap  karyawan juga dilakukan assesment kompetensi dan tes psikologi
untuk menempatkan karyawan pada jabatan tertentu, promosi, mutasi dan rotasi.
Employee Achievement Award Company always give award to employees as a form
of achievement appreciation for their performance and  dedication  given  to  the  Company.  That  award
also intended to motivate and becomes role model for other employees. Some form of awards granted to
employees by the Company as follows:
•   Satya Karya award for employees who has served 10 years, 20 years, and 30 years.
•   Exemplary  Award  for  employees  who  very dedicated and high achievement for the Company.
Awards are held every year. •   Performance Award in form of premium eiciency
project, the premium performance of regions divisions, and bonus corporation.
•   Pin  Reward  for  employees  who  are  doing  well raising internal and external image company.
•   Purna  Bhakti  Award  for  employees  who  has reached retirement age.
Fair	and	Equal	Treatment Although Company operates in various regions with
a diversity of religions, cultures, traditions, customs, conditions  and  terms  of  diferent  employment,  but
Company provides equal opportunities to workers in accordance to develop potential career, character and
the level of professionalism. Each individual is assessed and measured based on a transparant system as well
as the achievement performance of each employee. Fair and equal treatment for all employees expected to
foster motivation for continue to strengthen Company. And also, employees conducted competence
assessment and psychology test to place employees in positions particular, promotion, transfer and rotation.
Human Resources
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
T in
jau an
U n
it Pe
n d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
141
Annual Report 2014 | PT HUTAMA KARYA Persero
Information Technology
implementasi Ti Perseroan  menyadari  bahwa  dukungan  Teknologi
Informasi  TI  sangat  penting  untuk  dapat meningkatkan kapabilitas Perseroan.  Pengembangan
TI yang selaras dengan proses bisnis Perseroan akan memberikan kontribusi bagi penciptaan nilai tambah,
service excellent, serta pelaksanaan operasional perusahaan yang eisien, efektif dan optimal.
Program Pengembangan Ti Perseroan  melalui  Departemen  Teknologi  Informasi
memiliki program pengembangan dan pengelolaan
informasi, sistem informasi, dan komunikasi yang efektif menjadi faktor penting dalam kesuksesan
perusahaan disebabkan antara lain: •
TI selaras dengan kebutuhan bisnis, •
TI  dapat  meng-enable bisnis dan memberikan beneit optimal,
• Sumber  daya  TI  digunakan  dengan  penuh
tanggung jawab, •
Risiko-risiko  yang  terdapat  dalam  Tl  dikelola dengan baik,
• Kebijakan Tata Kelola TI diterapkan dengan baik,
• Compliance
kepatuhan  terhadap  aturan  tata kelola yang diterapkan.
Program  pengembangan  TI  senantiasa  diselaraskan dengan  proses  usaha  Perseroan.  Beberapa  program
pengembangan teknologi yang modern di Perseroan
antara lain: •
Sistem Informasi Manajemen Terintegrasi •
Sistem Disposisi Online •
Sistem Video Converence seluruh Wilayah  Divisi dengan Kantor Pusat
• Sistem Network berbasis Fiber Optic
• Display Elektronik Informasi Perusahaan
iT implementation Company  realized  that  Information  Technology  IT
support is very important to improve the company capability.  Development  of  IT  which  balanced  with
Company business process will give a contribution
for creating an added value, service excellence, and operational  implementation  eicient  company  which
is eicient, efective and optimal.
iT Development Program Company through Information Technology Department
have developed and maintained information system, and  efective  communication  become  an  important
factor to gain Company success caused by:
• IT conformable with business needs,
• IT  could  enable  business  and  gives  optimal
beneit, •
IT  Resource  could  be  used  with  full  of responsibility,
• Risk that contained in IT could be well managed.
• IT Government Policy could be well applied,
• Compliance to Government policy that applied.
IT  Development  continues  to  be  balanced  with Company business process. Some technology
development program that are modern in Company such as:
• Integrated Management Information System
• Online Disposition System
• Video  Conference  System  in  whole  District
Division with Main Oice •
Fiber Optic based Network System •
Company Information Electric Display
142
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Information Technology
Pelatihan dan Pengembangan sDM Ti SDM yang andal merupakan aset yang penting untuk
menunjang  operasional  bisnis  Perseroan.  Untuk itu,  Departemen  TI  melakukan  perekrutan  SDM
TI  melalui  seleksi  yang  ketat  dan  kompetitif  guna memastikan calon karyawan yang direkrut memiliki
level kompetensi sesuai dengan standar yang sudah ditetapkan. Selain itu, untuk menjaga kesinambungan
proses pembelajaran dan meningkatkan tingkat kompetensi,  secara  berkala  Departemen  TI  juga
melakukan pelatihan eksternal maupun internal terhadap SDM, baik dalam area teknis maupun non-
teknis.
Rencana Ti Ke Depan Pada  masa  mendatang  Departemen    TI  akan  terus
melakukan inisiasi serta inovasi untuk menghasilkan
ide dan gagasan pembaruan sistem dan teknologi informasi Perseroan. Perseroan optimis hal ini dapat
dijalankan dengan baik dan membantu Perseroan untuk mencapai target bisnis yang ditargetkan.
Training and Developing Human Resource iT Human Resource that is reliable is an important asset
to complete Company business operational. Therefore, IT  Department  recruited  Human  Resource  of  IT  by
ITght  selection  and  competitive  to  ensure  employee candidate which recruited had competency level
according to standard that appointed. Furthermore, to protect continuity of educating process and increases
competency, periodically IT Department also conducts external  or  internal  training  to  Human  Resource,
whether in  technical area or non technical.
iT Plan to the Future In a future era IT Department will always initiate also
innovate to resulting notion and idea of updating
system and information technology Company. Company optimism this matter could works well and
helps Company to achieve the business goal which been targeted.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
T in
jau an
U n
it Pe
n d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
143
Annual Report 2014 | PT HUTAMA KARYA Persero
Green Construction
Dalam industri
jasa konstruksi
seringkali mengakibatkan beberapa dampak negatif, selain
konsumsi energi yang mendominasi juga kerusakan ekosistem dan berkurangnya ruang resapan air di muka
bumi.  Dengan  dampak  tersebut,  sudah  sewajarnya jika Perseroan berkomitmen lebih responsif terhadap
berbagai kebijakan dan isu-isu lingkungan dalam kegiatan usahanya. Salah satu caranya, adalah dengan
mengaplikasikan konsep konstruksi berwawasan lingkungan, atau disebut sebagai konstruksi hijau.
Kontruksi  hijau  merupakan  aktivitas  proses pembangunan gedung yang mencakup tahapan
proses pengerjaan hingga penggunaan gedung dengan  mempertimbangkan  lingkungan.  Hasil  akhir
yang diperoleh dari konstruksi hijau akan berpengaruh
positif terhadap harmonisasi antara gedung dan lingkungan secara berkelanjutan sustainable.
Perseroan menerapkan konsep konstruksi hijau berdasarkan prinsip Reduce
mengurangi pemakaian, Recycle
mendaur  ulang,  dan  Reuse  menggunakan kembali.  Beberapa  aspek    kontruksi    hijau  berfokus
pada pemakaian bahan material, daur ulang, pemanfaatan bahan bangunan dapat meminimalisir
dampak negatif bagi lingkungan sekitar, serta penghematan energi dengan memanfaatkan cahaya
matahari sebagai pengganti energi listrik, penghematan pemakaian lampu di gedung, penggunaan air tanah
seeisien mungkin, dan lain-lain. Konstruksi  Perseroan dibangun sedemikian rupa dan
ramah terhadap lingkungan, eisien dalam pemakaian energi dan sumber daya, serta berbiaya rendah. Selain
itu, prinsip pengerjaan konstruksi mengedepankan keseimbangan antara keuntungan jangka pendek dan
risiko jangka panjang, sehingga menghasilkan produk konstruksi yang bermutu, sehat, dan aman, serta tidak
merugikan pihak-pihak lain di masa depan. In the Construction service industry usually caused
some negative impact, besides of energy consumption which dominated also ecosystem damaged and
reduced of water catchment room in the earth surface. With those impact, naturally if Company committed to
be more responsive to every policy and environmental issues on every business activity. One of the way, is by
applying construction concept environmentally sound,
or called as green construction.
Green construction is an activity of process building oice that consist step-making process until building
usage with considered the environment. Final
result that gained from green construction will afected positively to harmony between building and
environment continually sustainable.
Company applied green construction concept based on Reduce principle reduce the use, Recycle remake
thing, and Reuse using again.  Some aspect of green Construction focused to the use of material matter,
recycle, utilization of building matter could minimalize negative impact to nearby environment, also saving
energy by utilizing sun light as a swap of electric energy, saving the uses of lamp in building, uses of earth water
as eicient as ever, etc.
Company Construction built in such way and environmental  friendly,  eicient  in  the  energy  uses
and resource, also low cost. Besides that, principle of constructing prioritizing balance between short term
proit and long term risk, so it could resulted product of construction which quality, healthy, and safe, also
did not harm the others in the future.
144
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
implementasi Konstruksi Hijau
Secara garis besar implementasi konstruksi hijau dalam kegiatan usaha Perseroan dapat dibagi dalam tiga
tahap.  Pertama, tahap perencanaan kontruksi. Pada tahap ini, perencanaan konstruksi akan menghasilkan
desain  konstruksi yang hemat energi, menggunakan bahan baku material yang dapat diperbaharui, didaur
ulang, dan digunakan kembali.
Kedua, tahap proses pengerjaan konstruksi. Pada tahap ini, pengerjaan konstruksi dituntut untuk ramah
terhadap lingkungan sekitar, seperti tidak mencemari udara, air, dan tanah, serta mampu mengendalikan
tingkat kebisingan selama proses pengerjaan konstruksi berlangsung.
Ketiga, tahap penggunaan produk konstruksi. Pada tahapan ini, pemakaian produk konstruksi diharapkan
dapat memanfaatkan produk tersebut secara bijak, yaitu sesuai dengan tujuannya untuk memberikan
manfaat sebesar-besarnya pengguna, lingkungan, sekaligus menjamin keberlanjutannya di masa depan.
Konstruksi hijau mengarah pada struktur dan proses yang memperhatikan aspek lingkungan dan hemat
sumber daya sepanjang siklus hidup bangunan tersebut, teknologi baru terus dikembangkan untuk
melengkapi praktik penciptaan konstuksi hijau yang bertujuan untuk mengurangi dampak lingkungan.
Proyek Konstruksi Hijau No
Nama Proyek  Project Name Lokasi  Location
Owner
1 Kantor Kementerian Kelautan
Perikanan Oice of the Ministry of Maritime
Afairs  Fisheries Gambir, Jakarta Pusat
Gambir, Central Jakarta Kementerian Kelautan  Perikanan
Ministry of Maritime and Fisheries 2
Hotel Alila Villas Bintan Hotel of Alila Villas Bintan
Riau Riau
PT Bintan Cipta Cemerlang PT Bintan Cipta Cemerlang
Green Construction implementation
In a big line implementation of green construction in Company business activity could divided to three
step, First, construction-planning step. In this step, construction-planning will result construction design
which energy eicient, using raw material, which could be renewed, recycled, and reused.
Second, construction works process step. In this step, construction works required to be friendly to nearby
environment, like not polluted air, water, land, also able to control noises during work process when
construction take place. Third, step of using construction product. In this step,
the use of construction product hopefully able to make beneit product wisely, it is according to its purpose to
give  beneit  as  big  as  it  can  user,  environment,  also ensure the continuity at the future.
Green construction directed to structure and process which giving attention to environment aspect and
eicient  resource  during  life  cycle  of  those  building, new technology always developed to complete creation
practice of green construction which its purpose is to reduce environmental impact.
Green Construction Project
Green Construction
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
T in
jau an
U n
it Pe
n d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
145
Annual Report 2014 | PT HUTAMA KARYA Persero
sumber Daya Manusia Dalam Bidang Konstruksi Hijau
Perseroan telah melakukan peningkatan kompetensi personil di bidang kontruksi hijau melalui training
dan  sertiikasi  seperti  Sertiikasi  Green  Associates, Sertiikasi  Green  Profesional  yang  diterbitkan  oleh
Green Building Council Indonesia GBCI.
Konstruksi Hijau ke Depan Dengan  kapabilitas  dan  kemampuan  Perseroan  saat
ini, realisasi pembangunan konstruksi hijau menjadi
komitmen bersama Perseroan dengan seluruh pemangku kepentingan sehingga Perseroan yang
bergerak di bidang industri jasa konstruksi dapat berkontribusi bagi pembangunan nasional yang
ramah lingkungan.
Human Resource in Green Construction Division
Company has doing increase of personel competency in green construction divison through training and
certiication like Green Associates Certiication, Green Professional  Certiication  which  were  published  by
Green Building Council Indonesia GBCI.
Green Construction to the Future
Within the capability and skill Company nowadays, realization of green construction development
become commitment together of Company and whole stakeholders so that Company which move
on construction service industry could contribute to national development which environmental friendly.
Green Construction
146
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Business Development
Perseroan menetapkan strategi pengembangan usaha berdasarkan formulasi antara integrasi vertikal dan
integrasi horizontal sebagai upaya untuk mendukung strategi utama yang ditetapkan Perseroan yaitu
pertumbuhan  growth strategy.  Strategi  integrasi vertikal lebih pada upaya perbaikan operasional
melalui  backward integration yang lebih menekankan pada upaya memperbaiki daya saing dengan
memperbaiki  supply chain dan forward integration yang lebih menekankan perbaikan daya saing dengan
memperkecil kemungkinan terjadinya rework dan keterlambatan delivery.
Strategi ini diformulasi dengan strategi integrasi horizontal sebagai upaya memperkuat forward
integration terutama dalam memenangkan persaingan dengan para pesaing di industri konstruksi guna
mendapatkan kinerja operasional yang maksimal. Perencanaan strategi Perseroan mengedepankan
pada sinergi dan integrasi kompetensi yang dimiliki oleh seluruh anak perusahaan dalam memaksimalkan
kemampuan usaha. Strategi  forward integration diperlihatkan dalam
hubungan antara kegiatan bisnis utama HK dengan
anak-anak perusahaan di mana Perseroan mendapat nilai tambah sebagai kontraktor dan mendukung
mempercepat pelaksanaan pembangunan pada proyek-proyek strategis yang meliputi investasi di
proyek-proyek jalan tol, power plant, minyak dan gas, serta bangunan gedung.
Company sets  a business development strategy according to formulation between vertical integration
and horizontal integration as an efort to support main strategy which been set of by Company it is growth
strategy. Vertical integrated Strategy more to the efort  of  ixing  operational  by  backward  integration,
which  more  pointed  at  efort  to  ix  competitiveness by ixing supply chain, and forward integration, which
more  pointed  at  ixing  competitiveness  by  reducing probability of rework and late delivery.
This  strategy  was  formulated  with  horizontal integration strategy as an efort to strengthen forward
integration especially in winning a competition
with rivals in construction industry to get maximal operational performance.
Strategic planning of Company forwarding at synergy and integrated competency, which had by whole
subsidiary in maximizing business skill.
Forward Integration Strategy showed in the relationship  between  main  business  activity  HK  with
subsidiary where Company gained plus value as a
contractor and supports the accelerate of development implementation at strategic projects which consist of
investigation in projects of toll highway, power plant, oil and gas, also building.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
T in
jau an
U n
it Pe
n d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
147
Annual Report 2014 | PT HUTAMA KARYA Persero
Trans Sumatera Toll Highway
Dalam rangka mendorong pengembangan wilayah di Pulau Sumatera dan guna mendukung pertumbuhan
perekonomian nasional serta mendukung pelaksanaan  MP3EI  tahun  2010-2028,  Pemerintah
berkomitmen mempercepat pembangunan jalan tol di
Pulau Sumatera. Berdasarkan  data  Masterplan  Percepatan dan
Perluasan Pembangunan Ekonomi Indonesia MP3EI, infrastruktur di wilayah Sumatera lebih didominasi
oleh infrastruktur darat karena intra koridor ekonomi yang lebih efektif terhubung melalui jalan darat.
Karana  itu,  Pemerintah  berencana  untuk  melakukan pembangunan jalan tol di daerah Sumatera
guna mendorong pertumbuhan ekonomi dan pengembangan wilayah di daerah.
Pengembangan jalan tol trans Sumatera terdiri dari 23 ruas. Ruas tersebut melewati 9 provinsi yang dibagi
dalam  koridor  utama  sebanyak  15  ruas  dan  koridor pendukung  sebanyak  8  ruas,  panjang  keseluruhan
jalan tol trans Sumatera mencapai 2.608 km.
Dari 23 ruas tersebut, pada tahap pertama Perseroan ditugaskan  untuk  mengembangkan  ruas  Medan  –
Binjai  17  Km,  ruas  Palembang  –  Indralaya  22  Km, ruas  Bakauheni  –  Terbalanggi  besar  139  Km,  serta
Pekanbaru  –  Dumai  126  Km.  Secara  total,  panjang keseluruhan jalan tol trans Sumatera yang telah
ditugaskan sepanjang 304 Km.
Pengembangan jalan tol trans Sumatera diharapkan dapat meningkatkan konektivitas untuk
mengembangkan potensi ekonomi daerah dan memberikan manfaat penyerapan tenaga kerja baik
selama masa konstruksi maupun setelah beroperasi. In order to supports development of region in
Sumatera Island and to supports national economic development  also  support  implementation  of  MP3EI
year 2010-2028, Government committed to accelerate development of toll highway in Sumatera Island.
According to Master plan of Accelerate and expansion of  Indonesia  Economic  Development  MP3EI,
infrastructure in Sumatera region more dominated by
land infrastructure because of intra economic corridor which efectively connected through land road. Because
of that, Government planned to do development of toll
highway in Sumatera Region to encourage economic development and region development in region.
Development  of  trans  Sumatera  toll  way  consist of  23  segment.  Those  segment  crossed  9  Province
divided in main corridor as much as 15 segment and supporting corridor as much as 8 segment, total length
of Sumatera trans toll road reach out 2,608 Km.
From the 23 segment, in the irst stage, the Company been  assigned  to  develop  Medan  –  Binjai  segment
17  Km,  Palembang  –  Indralaya  segment  22  Km, Bakauheni  –  Terbalanggi  segment  139  Km,  also
Pekanbaru  –  Dumai  126  Km.  Totallly,  total  length of  Trans  Sumatera  toll  way  which  been  assigned
throughout 304 Km.
Development  of  trans  Sumatera  toll  way  hopefully could increases connectivity to develop potential of
region  economy  and  give  beneit  of  employment whether during construction or even after operate.
148
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
TAHAP 1
www.hutamakarya.com
Pematang panggang Kayu Agung
Betung Jambi
Palembang
Terbanggi Besar Rengat
Pekanbaru Dumai
Rantau Prapat Kisaran
Tebing Tinggi
Medan Binjai
Langsa Lhokseumawe
Sigli
Banda Aceh
139 100
85 191
190 175
126 175
100 60
17 110
135 135
75
Bakauheni Bengk
ulu Lubuk Ling
gau Muar
a Enim Indr
alaya Bukit Ting
gi Padang
Sibolg a
95 125
88 22 55
185
TIPIKAL CROSS SECTION PERENCANAAN TEKNIS
FINAL STAGE
2 X 3
ROUNDINGBAHU LUAR JALUR LALIN
B A
H U
D A
LA M
1 : 2
POTONGAN MELINTANG JALAN TOL TAHAP AWAL
MEDIAN FG
-4 -2
SOIL STRIPPING 30 CM CL
±0.00 EGL
2.00 1.50
ROUNDING BAHU LUAR
JALUR LALIN B
A HU
D AL
A M
1 : 2 FG
-4 -2
1.000.50 2.00
1.50 1.00
0.50 21.00
3.50 3.50
3.50 3.50
INITIAL STAGE
2 X 2
POTONGAN MELINTANG JALAN TOL TAHAP AKHIR
ROUNDINGBAHU LUAR JALUR LALIN
B A
H U
D A
LA M
1 : 2 MEDIAN
FG -4
-2 CL
±0.00 EGL
1.50
JALUR LALIN B
A HU
D AL
A M
FG -2
1.000.50 1.00
0.50 28.00
3.50 3.50
3.50 3.50
3.50 2.00
ROUNDING BAHU LUAR
-4
1.50 3.50
2.00
1 : 2
PROGREs PERsiAPAN RENCANA PENUGAsAN jALAN TOL TRANs sUMATERA
Progres persiapan rencana penugasa jalan tol trans Sumatera yang telah dilakukan hingga 2014, sebagai
berikut:
Medan – Binjai Palembang – indralaya
Pekanbaru – Dumai Bakauheni – Terbanggi Besar
Teknis Pra Fs  = Selesai
Basic  = Selesai Business plan = draft
Detail desain = Proses Dok Lelang = Proses
Teknis Pra Fs  = Selesai
Basic  = Selesai Business plan = draft
Detail desain = Proses Dok Lelang = Proses
Teknis Pra Fs  = Selesai
Basic  = Selesai Business plan = Proses
Detail desain = Proses Dok Lelang = Proses
Teknis Pra Fs  = Selesai
Basic  = Selesai Business plan = draft
Detail desain = Proses Dok Lelang = Proses
Pembebasan Tanah SP2LP = Selesai
Sosialisasi = Selesai Inventarisasi = Selesai
Ganti Rugi = Proses Pembebasan Tanah
SP2LP = Selesai Sosialisasi = Selesai
Inventarisasi = Selesai Ganti Rugi = Seksi 1
Pembebasan Tanah SP2LP = Selesai
Sosialisasi = Selesai Inventarisasi = Selesai
Ganti Rugi = Seksi 1 C Pembebasan Tanah
SP2LP = Selesai Sosialisasi = -
Inventarisasi = - Ganti Rugi = -
PROGREss OF THE PREPARATiON OF AssiGNMENT PLAN OF TRANs-sUMATERA TOLL ROAD
The preparation of assignment plan of trans-Sumatera toll road that has been conducted is relected on the
following progress:
Trans Sumatera Toll Highway
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
A n
a lisis
d a
n Pem
b a
h a
sa n
M a
n a
jem en
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
T in
jau an
U n
it Pe
n d
u k
u n
g
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
149
Annual Report 2014 | PT HUTAMA KARYA Persero
DAsAR PENUGAsAN
Perseroan ditugaskan oleh Pemerintah berdasarkan Peraturan  Presiden  Nomor  100  Tahun  2014  tentang
Percepatan  Pembangunan  Jalan  Tol  di  Sumatera. Dasar  penugasan  Perseroan  adalah  ketentuan  PP
Nomor 432013 tentang perubahan kedua atas PP No. 152015 tentang Jalan Tol, Pasal 20:
1.  Pengusahaan jalan tol oleh Pemerintah
sebagaimana dimaksud dalam Pasal 19 terutama diperuntukan untuk ruas jalan yang layak secara
ekonomi, tetapi belum layak secara inansial. 2.  Pelaksanaan pengusahaan jalan tol sebagaimana
dimaksud  dalam  nomor  1  dilakukan  melalui kegiatan pendanaan, perencanaan teknis, dan
pemeliharaan dilakukan oleh badan usaha. 3.  Dalam  hal  pendanaan  Pemerintah  untuk
pengusahaan jalan tol terbatas, dalam rangka percepatan pengembangan wilayah, Pemerintah
dapat  menugaskan  Badan  Usaha  Milik  Negara untuk melaksanakan pengusahaan jalan tol.
4. Badan  Usaha  Milik  Negara  sebagaimana  yang
disebutkan  pada  nomor  3  merupakan  Badan Usaha Milik Negara yang seluruh modalnya dimiliki
oleh negara.
5.  Badan  Usaha  Milik  Negara  sebagaimana  yang disebutkan  pada  nomor  3,  dapat  bekerja  sama
dengan badan usaha lain. 6.  Penugasan  kepada  Badan  Usaha  Milik  Negara
sebagaimana dimaksud pada nomor 3 ditetapkan dengan Peraturan Presiden.
BAsiC AssiGNMENT
Company has been assigned by Government according to  Presidential  Decree  No.  100  of  2014  concerning
Acceleration  Highway  Development  in  Sumatera. Basic assignment of the Company is the provisions of
Regulation No. 432013 on the second amendment of the PP 152015 on Toll Road, Article 20:
1. Concession by the Government as referred to
in Article 19 is mainly intended to roads that are economically  feasible,  but  not  yet  inancially
feasible.
2.  Implementation of the concession as referred to in number 1 is done through activities inancing,
technical planning, and maintenance conducted by the Business Entity.
3.  In  terms  of  Government  funding  for  exploitation- limited highway, in order to accelerate development
of the region, the Government may assign State Owned Enterprises to implement concession.
4.  State-Owned Enterprises as mentioned the number 3  is  a  State-Owned  Enterprises  which  is  wholly
owned by the state.
5.  Agency  for  State  Owned  Enterprises  as  the mentioned at 3, can cooperate with other business
entities. 6.  Assignment to State Own Enterprise referred to the
number 3 set by Presidential Decree.
Jalan Tol Trans Sumatera
Tinjauan Umum
Global Overview
Tinjauan Kinerja Perseroan
Company Performance Overview
Kinerja Keuangan
Financial Performance
153 155
161
analisis dan pembaHasan manajemen
managemenT DIscussIon anD analysIs
Rencana Jangka Panjang Perseroan
Long-Term Plans Of The Company
Aspek Pemasaran
Marketing Aspect
Prospek Usaha
Business Outlook
198 196
194
152
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Aset Lancar Current Assets
Ekuitas Equity
Management Discussion and Analysis
5.717 5.502
5.033
2014 2013
2012
Pendapatan Usaha Operating Revenue
Rp5.343 M
Rp991 M
Pada 17 September 2014, Perseroan mendapatkan
penugasan untuk pengusahaan 4 ruas Jalan
Tol Trans Sumatera.
On September 17, 2014, the Company obtained an
assignment to construct 4 Toll Road Trans Sumatera.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
An al
isi s
d an
Pe mb
ah asan
M an
aj e
me n
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
Tin ja
ua n
Un it
Pen du
ku ng
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
153
Annual Report 2014 | PT HUTAMA KARYA Persero
Pertumbuhan ekonomi daerah untuk keseluruhan tahun 2014 secara agregat telah mendekati batas
bawah  kisaran  5,1-5,5  yoy  jauh  lebih  rendah dibandingkan tahun 2013 sebagai dampak penurunan
kinerja  sektor  pertambangan  Kawasan  Timur Indonesia KTI pasca implementasi UU Mineral di awal
tahun. Dinamika perekonomian global yang diwarnai dengan perlambatan perekonomian negara maju
dan tren penurunan harga komoditas mempengaruhi kinerja subsektor perkebunan di Sumatera dan
industri manufaktur di Jawa secara keseluruhan. Laju penurunan pertumbuhan ekonomi nasional lebih
lanjut tertahan oleh kuatnya perekonomian Jakarta yang mampu tumbuh di kisaran 6 sepanjang tahun
2014.
Ke  depan,  perekonomian  daerah  pada  tahun  2015 diperkirakan meningkat seiring dengan menguatnya
indikasi  perbaikan  di  sektor  pertambangan  KTI dan prospek perbaikan ekonomi global yang
dapat mempengaruhi peningkatan kinerja industri pengolahan di Jawa dan Sumatera. Sementara inlasi
diproyeksikan masih akan berada di lintasan yang konsisten dengan pencapaian sasaran inlasi nasional
sebesar  4±1.  Meskipun  demikian,  sejumlah  risiko yang  membayangi  di  tahun  2015  masih  bersumber
dari rencana implementasi kebijakan energi oleh pemerintah. Bank Indonesia memandang upaya untuk
mendorong reformasi struktural semakin penting
dilakukan untuk mengatasi berbagai permasalahan struktural yang dapat menghambat perekonomian
daerah ke depan. Langkah reformasi struktural perlu ditempuh dan difokuskan pada upaya peningkatan
daya  saing  ekspor  manufaktur  dan  diversiikasi perekonomian daerah melalui penguatan lingkungan
pendukung  enabling environment,  termasuk  logistik dan konektivitas, kemudahan berusaha, dan akses
pembiayaan jangka panjang. Pada tahun 2014 Industri Engineering Procurement
and Construction EPC  terus  bersinergi  dengan
pembangunan perekonomian dan pemerataan pembangunan nasional di Indonesia dan dunia.
GENERAL	OVERVIEW
Regional economic growth for 2014 in aggregate have approached  the  lower  limit  range  of  5.1-5.5  yoy
much lower compared to 2013 as the impact of decline in mining sector performance in Eastern Indonesia
Region KTI after the implementation of Mineral Law in the beginning of the year. Dynamics of global economy
which is characterized by economy slowdown in
developed country and trend in decline of commodities price afect the performance of plantation subsector in
Sumatera and manufacturing industry in Java. Rate of
decline in the growth of national economy is further restrained by the strength of Jakarta’s economy that is
capable to grow in the range of 6 throughout 2014.
In the future, regional economy in 2015 is expected to increase along with the strengthening of improvement
indication  in  KTI  mining  sector  and  global  economy recovery  prospect  which  can  afect  the  performance
improvement of processing industry in Java and Sumatera.  While  inlation  is  projected  to  be  in  a
consistent line with the achievement of national inlation target  at  4±1.  Even  so,  a  number  of  risks  which
haunts 2015 are still derived from the implementation plan of energy policy by the Government. Central
Bank  of  Indonesia  sees  the  efort  to  encourage  the structural reformation became more important to be
carried out to overcome various structural problems that may hamper the regional economy in the future.
Structural reformation needs to be implemented and focused on the efort to improve the competitiveness
of export manufacturing and diversiication of regional economy by strengthening the enabling environment,
including logistics and connectivity, ease of business, and long-term inancing access.
In 2014, Engineering Procurement and Construction EPC  Industry  continues  to  synergize  with  the
economic development and equalization of national
development in Indonesia and the world. Some of EPC
Management Discussion and Analysis
154
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Beberapa perusahaan EPC pun mengalami pergerakan yang  signiikan  akibat  perubahan  dinamika  politik,
keamanan dan ekonomi global.
Kelemahan  nilai  tukar  Rupiah  terhadap  mata  uang asing turut berdampak pada kinerja ekonomi nasional
termasuk industri kontruksi dan properti yang diprediksikan mengalami stagnasi ditambah kenaikan
suku bunga acuan BI Rate setelah sebelumnya terkena dampak kenaikan bahan bakar minyak BBM. Untuk
itu, Industri kontruksi dan properti berusaha tidak menaikan  harga  dan  mencoba  melakukan  eisiensi.
Kenaikan  suku  bunga  BI  berdampak  pada  tender- tender proyek di luar negeri, Indonesia selalu kalah
tender dengan Cina karena Cina memiliki suku bunga rendah.
Faktor  penguatan  Dolar  Amerika  Serikat  membuat naiknya biaya-biaya material utama konstruksi, baik
material impor maupun lokal. Kontribusi material impor terhadap industri konstruksi sangat situational. Pada
proyek pembangkit, komponen impor bisa mencapai 60-70. Sedangkan pada proyek gedung sebesar 50.
Material barang impor diantaranya adalah peralatan
power plant dan peralatan material aspal. Sedangkan bahan industri lokal yang mengandung material bahan
baku impor adalah baja plate, baja proile, besi baja, marmer, granit dan gypsum.
Secara umum, kenaikan harga material berdampak pada pencapaian target pekerjaan pembangunan,
proyek-proyek  menjadi tersendat dan pada akhirnya akan berdampak pada perekonomian dengan
berkurangnya penyerapan tenaga kerja karena industri konstruksi berkontribusi sebesar 10 terhadap GDP.
Pada sektor infrastruktur khususnya bidang sumber daya air, selama 10 tahun terakhir telah dilaksanakan
pembangunan  21  waduk  dan  1.153  embungsitu serta  rehabilitasi  84  waduk  dan  386  embungsitu,
maupun peningkatanpembangunan jaringan irigasi dan irigasi air tanah seluas 988.932 ha. Selain itu, telah
dilaksanakan pula pembangunan prasarana air baku dengan  total  kapasitas  sebesar  72,70  m3detik  dan
rehabilitasi kapasitas air baku sebesar 35,19 m3detik. companies also experience signiicant movement due
to changes in dynamics of politics, security, and global economy.
Rupiah’s weak exchange rate against foreign currencies also  afect  the  national  economic  performance,
including construction and property industry, which
was predicted to experience stagnation plus increase of BI benchmark rate after previously afected by the
increase of fuel price  BBM. Therefore, construction and property industry is trying not to raise the price
and try to conduct an act of eiciency instead. Raise of  BI  interest  rate  afected  the  tenders  of  overseas
projects, Indonesia always lose the tender with China
because China have low interest rate. Strengthening factor of US Dollar caused the raise in
major construction material costs, both imported and local materials. Contribution of import materials on
construction industry is extremely situational. In the projects,  imported  components  can  reach  60-70.
While in building projects amounted to 50. Imported goods materials among others are power plant
equipment and asphalt material equipment. While local industrial materials which contains raw imported
materials are steel plate, steel proiles, steel, marble, granite and gypsum.
In general, rise in material price gave an impact to the achievement of construction work target, projects
become  clogged  up  and  eventually  will  afect  the economy due to decrease in employment because
construction industry contributed around 10 of GDP.
In  infrastructure  sector,  especially  in  the  ield  of water resources, for the last 10 years, there has been
construction  implementation  of  21  dams,  and  1,153 ponds  as  well  as  rehabilitation  of  84  dams  and  386
ponds, and increase construction of irrigation network and groundwater irrigation covering an area of 988,932
ha. In addition, there has also been an implementation
on the construction of water infrastructure with total capacity  of  72.70  m3second  and  rehabilitation  of
water capacity amounted to 35.19 m3second.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
An al
isi s
d an
Pe mb
ah asan
M an
aj e
me n
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
Tin ja
ua n
Un it
Pen du
ku ng
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
155
Annual Report 2014 | PT HUTAMA KARYA Persero
Bidang  pembangunan  jalan  dan  jembatan  yang mendukung konektivitas dan kelancaran arus barang
jasa, telah dicapai hasil yang signiikan. Sampai dengan tahun  2014,  94  dari  seluruh  jalan  nasional  telah
berada pada kondisi mantap melalui pembangunan jalan baru sepanjang 4.770 km serta jembatanlyover
underpass
sepanjang  108.847,75  m.  Selain  itu,  telah terbangun pula jalan tol sepanjang 419,56 km dimana
368,29 km dibangun oleh swasta dan sisanya 51,27 km dibangun oleh pemerintah.
Kinerja Perseroan di tahun 2014 ini cukup baik lewat serangkaian usaha, seperti eisiensi dan peningkatan
kompetensi sumber daya manusia sebagai modal utama Perseroan. Hasil kinerja itu tidak dilepaskan dari
kepercayaan seluruh stakeholder pada manajemen
beserta seluruh karyawan Perseroan. PT  Hutama  Karya  Persero  menjadi  pionir
pembangunan nasional khususnya pengembangan pembangunan jalan tol di Sumatera karena Perseroan
dinilai pemerintah lebih mampu mengeksekusi pembangunan jalan tol lebih cepat dan meningkatkan
daya saing dalam kesempatan bisnis korporasi. Pemerintah telah menyuntikkan dana dalam bentuk
Penyertaan Modal Negara PMN sebesar Rp3,6 triliun kepada PT Hutama Karya Persero guna membangun
empat ruas jalan tol di Sumatera yang menjadi salah
satu kegiatan usaha Perseroan. Pada  17  September  2014,  Perseroan  mendapatkan
penugasan untuk pengusahaan 4 ruas Jalan Tol Trans Sumatera setelah diterbitkannya Perpres No. 100
tahun 2014 mengenai Percepatan Pembangunan Jalan Tol di Sumatera. Ruas-ruas yang akan dikerjakan adalah
Ruas  Medan-Binjai,  Ruas  Palembang-Indralaya,  Ruas Pekanbaru-Dumai  dan  Ruas  Bakauheni-Terbanggi
Besar. Diharapkan dengan adanya pembangunan jalan tol di Sumatera dapat meningkatkan pertumbuhan
ekonomi di Pulau Sumatera. Dibandingkan  tahun  lalu  penjualan  hanya  tumbuh
3,92, belum mencapai target tahun 2014 antara lain disebabkan perolehan proyek tidak sesuai dengan
yang direncanakan dan tidak tersedianya lahan proyek Field  of  roads    bridges  construction  which  support
the connectivity and smoothness of goodsservices low, has achieved signiicant result. Up to 2014, 94 of
the entire national road has been in steady condition through the construction of new road along 4,770 km
and  bridgeslyoverunderpass  along  108,847.75  km. In addition, a toll road along 419,56 km has also been
constructed,  where  368.29  km  was  built  by  private institution and the rest of 51.27 km was built by the
Government.
COMPANY	PERFORMANCE	OVERVIEW
Company’s performance in 2014 is quite well through a series of eforts, such as eiciency and improvement of
human resources competence as the Company’s main
capital. Such performance result was not released from the trust of all stakeholders to the management
and the entire employees of the Company. PT  Hutama  Karya  Persero  became  the  pioneer  of
national development, especially the development of toll road construction in Sumatera because the
Company was assessed by the Government as capable to execute the toll road construction faster and to
improve the competitiveness in corporate business opportunities. The government has donated funds in
form of State Capital Investment PMN amounted to Rp3.6 trillion to PT Hutama Karya Persero to construct
four toll roads in Sumatera which became one of the
Company’s business activities. On  September  17,  2014,  the  Company  obtained  an
assignment to construct 4 Toll Road Trans Sumatera after the issuance of Presidential Decree No. 100 year
2014 on the Acceleration of Toll Road Construction in Sumatera. Segments which will be done is the Medan-
Binjai  segment,  Palembang-Indralaya  segment, Pekanbaru-Dumai segment, and Bakauheni-Terbanggi
Besar segment. Hopefully with the construction of toll road in Sumatera, it can increase the economic growth
in Sumatera Island. Compared  to  last  year,  sales  only  grew  by  3.92,  it
has not reached the target of 2014 and is partly due to project acquisition which is not in accordance with
what had planned and the unavailability of land,
156
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
sehingga tidak dapat diproduksi secara maksimal. Sedangkan  laba  meningkat  cukup  signiikan  yaitu
sebesar 10,61 serta total aset tumbuh sebesar 0,98 dibandingkan  tahun  2013.  Tingkat  kesehatan  pada
tahun 2014 adalah ‘Sehat AA’ dengan poin 80,50.
Kegiatan Usaha Konstruksi Aktivitas Tender dan Perolehan Kontrak
Pada tahun 2014 Perseroan mengalami peningkatan pada  aktivitas  tender  dari  Rp45,09  triliun  menjadi
Rp46,67  triliun  atau  naik  3,51  dibandingkan  tahun 2013,  sedangkan  lelang  yang  dimenangkan  pada
tahun  2014  adalah  sebesar  Rp9,10  triliun.  Hal  ini disebabkan pergeseran penandatanganan kontrak
pada  awal  tahun  2015.  Aktivitas  lelang  yang  diikuti mengalami peningkatan apabila dibandingkan dengan
target  tahun  2014  sebesar  5,54,  sedangkan  lelang yang  dimenangkan  telah  tercapai  sebesar  80,50
dari target sebesar Rp11,3 triliun atau sebesar Rp9,10 triliun.
Informasi mengenai portofolio kegiatan tender dapat dilihat sebagai berikut:
Dalam Miliar Rupiah
No Uraian
Description Realisasi 2013
Realization in 2013
RKAP 2014 Realisasi 2014
Realization in 2014
Realisasi 2014 Terhadap  Realization in 2014 on
Realisasi 2013 Realization in 2013
RKAP 2014  RKAP 2014
1 2
3 4
5 6 53
7 54
1 Lelang Yang
Diikuti Attended
Auctions 45.091,82
458 Proyek Projects
44.222,00 424 Proyek
Projects 46.672,89
377 Proyek Projects
103,51 82,31
105,54 88,92
2 Lelang Yang
Dimenangkan Auction Won
9.666,69 116 Proyek
Projects 11.300,00
128 Proyek Projects
9.096,65 102 Proyek
Projects 94,10
87,93 87,93
79,69 3
Lelang Yang Dimenangkan
Proyek   of Auction Won
-   Eks. Nilai Rupiah Ex. Value of
Rupiah -   Eks. Jumlah
Ex. Total Projects
21,44 25,33
25,55 30,19
19,49 27,06
- -
- -
hence it cannot be produced to the fullest. While the proit increased quite signiicantly which is amounted
to 10.61 and total assets grew by 0.98 compared to 2013. The level of health in 2014’s “Sehat AA” with
80,50 points.
OPERATIONAL	 OVERVIEW	 PER	 BUSINESS sEGMENT
Construction Business Activities Tender	Activities	and	Contract	Acquisition
In 2014, the Company experienced increase in tender activities  from  Rp45.09  trillion  to  Rp46.67  trillion  or
up by 3.51 compared to 2013, while auction won in 2014  amounted  to  Rp9.10  trillion.  This  is  caused  by
the shift in contract signing in the beginning of 2015. Auction activities experienced increase if compared
to the target of 2014 at 5.54, while auction won has reached  80.50  from  the  target  at  Rp11.3  trillion  or
amounted to Rp9.10 trillion.
Information on Portfolio of tender activities is as follows:
In Billion Rupiah
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
An al
isi s
d an
Pe mb
ah asan
M an
aj e
me n
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
Tin ja
ua n
Un it
Pen du
ku ng
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
157
Annual Report 2014 | PT HUTAMA KARYA Persero
Jika dilihat dari komposisi kontrak baru, terjadi peningkatan proyek Jalan dan Jembatan sebesar
96,23,  dan  pada  proyek  Pelabuhan  dan  Dermaga sebesar 322,14 dibandingkan tahun lalu.
Portofolio kontrak baru Perseroan pada 2014, sebagai berikut:
No Uraian  Description
Realisasi 2013
Realization in 2013
RKAP 2014 Realisasi
2014 Realization
in 2014 Realisasi 2014 Terhadap
Realization in 2014 on Realisasi 2013
Realization in 2013
RKAP 2014 RKAP 2014
1 2
3 4
5 6 53
7 54
1 BendunganIrigasi
DamIrrigation 1.065,63
1.130,00 6,14
0,58 0,54
2 Jalan dan Jembatan
Roads and Bridges 2.186,72
2.938,00 4.291,04
196,23 146,05
3 Bangunan dan Gedung
Buildings 3.574,83
3.842,00 2.701,79
75,58 70,32
4 PelabuhanDermaga
PortHarbor 196,42
339,00 829,17
422,14 244,59
5 EPCPLN, PLTU,
dan Lainnya EPC
PLN,PLTU, and Others 2.643,08
3.051,00 1.268,52
47,99 41,58
Jumlah Total
9.666,68 11.300,00
9.096,65 94,10
80,50 PPN 10
966,67 1.130,00
909,67 -
- Jumlah Kontrak Baru
Total of New Contracts 10.633,35
12.430,00 10.006,32
- -
Referring to the composition of new contracts, there is an increase in Roads and Bridges construction projects
of  96.23  and  in  Port  and  Harbor  construction projects of 322.14 if compared to the previous year.
The portfolio of the Company’s new contracts in 2014 is as follows:
Portfolio of the Company’s new contract in 2014 is as follows:
158
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Kontrak Ditangan dan sisa sumber Karya Total kontrak di tangan tahun 2014 yang merupakan
akumulasi dari sisa sumber karya tahun lalu dengan
perolehan kontrak baru tahun berjalan sebesar Rp16,75  triliun.  Dibandingkan  dengan  RKAP  tahun
2014 sebesar Rp18,50 triliun, maka realisasi tersebut telah tercapai 90,56.
No Uraian
Description Realisasi 2013  Realization in 2013
RKAP 2014 Persentase
Pencapaian Realisasi 2014
Terhadap RKAP 2014
Percentage of Realization in
2014 on RKAP 2014
sisa Proyek Lama
Remaining Old
Projects Proyek
Baru New
Projects jumlah
Total Persentase
Percentage sisa
Proyek Lama
Remaining Old
Projects Proyek
Baru New
Projects jumlah
Total Persentase
Percentage
1 2
3 4
5 6
7 8
9 10
11 95
1 Bendungan
Irigasi Dam
Irrigation 576,00
1.130,000 1.706,00
9,22 838,08
6,14 844,22
5,04 49,49
2 Jalan dan
Jembatan Roads and
Bridges 2.160,00
2.938,000 5.098,00
27,56 2.272,89
4.291,04 6.563,93
39,18 128,75
3 Bangunan
dan Gedung Buildings
2.520,00 2.938,000
6.362,00 34,39
1.965,91 2.701,79
4.667,69 27,86
73,37 4
Pelabuhan Dermaga
PortHarbor 504,00
339,000 843,00
4,56 576,51
829,17 1.405,68
8,39 166,75
5 EPCPLN,
PLTU, dan Lainnya
EPCPLN, PLTU, and
Others 1.440,00
3.051,000 4.491,00
24,28 2.002,82
1.268,52 3.271,34
19,53 72,84
Jumlah Total
7.200,00 11.300,00
18.500,00 100
7.656,20 9.096,65
16.752,86 100
90,56 PPN 10
720,00 1.130,00
1.850,00 10
765,62 909,67
1.675,29 10
- Jumlah
Kontrak Baru
Total of New
Contracts 7.920,00
12.430,00 20.350,00
110 8.421,82
10.006,32 18.428,14
110 -
Total kontrak pada tahun 2014 telah terealisasi  sebesar 90,56,  kontrak  baru  itu  merupakan  akumulasi  dari
sisa sumber karya tahun lalu sebesar Rp16,75 triliun sementara target yang direncanakan sebesar Rp18,50
triliun. Sementara komposisi kontrak baru mengalami
peningkatan dibandingkan tahun lalu, khususnya pada proyek Jalan dan Jembatan sebesar 28,75, dan pada
proyek Pelabuhan dan Dermaga sebesar 66,75.
Contracts in Hand and Residual source Total of contracts in hand in 2014 is derived from the
accumulation of residual source from last year’s work
and contracts in current year which is amounted to Rp16.75  trillion.  If  compared  with  RKAP  year  2014
which was amounted to Rp18.5 trillion, the realization has reached 90.56.
Total  contracts  in  2014  which  has  been  realized amounted  to  90.56,  those  new  contracts  are  an
accumulation from residual source from last year’s work  amounted  to  Rp16.75  trillion  while  the  target
planned  is  Rp18.50  trillion.  Meanwhile,  composition of new contracts experienced an increase compared
to last year, especially in road and bridge projects amounted  to  28.75,  and  Port  and  Pier  projects  at
66.75.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
An al
isi s
d an
Pe mb
ah asan
M an
aj e
me n
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
Tin ja
ua n
Un it
Pen du
ku ng
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
159
Annual Report 2014 | PT HUTAMA KARYA Persero
Proyek dengan Nilai Pekerjaan Terbesar 2014
Nama Proyek  Project Name Mulai  start
Akhir  Finish Pemilik  Owner
Gedung Dinas Teknik Jatibaru Jatibaru
Engineering Service Building 25102013
30112015 Pemprov DKI Jakarta
Apartement Atlanta, Depok Atlanta
Apartment, Depok 28102014
16102016 PT Agung Multi Berjaya
Gedung Hotel Pegadaian 6 Lokasi Jatim Hotel
Pegadaian 6 Building, East Java 1102014
17092015 PT Pegadaian Persero
Bandara Supadio Pontianak Supadio Airport,
Pontianak 26022013
15062015 PT Angkasa Pura II
Gedung KPK Jakarta KPK Building, Jakarta
29112013 23052015
Komisi Pemberantas Korupsi Civil Work For Cilacap Expansion 1x660 MW
Civil Work For Cilacap Expansion 1x660 MW 1112013
172015 PT DC Engineering
EPC Dermaga Curah Kering EPC Dry Bulk Dock
1122014 30112015
PT Pelindo III Jalan Padangan - Ngawi
Padangan-Ngawi Road
6112012 23022015
Kemen-PU Masjid Raya Darussalam, Palangkaraya
Darussalam Grand Mosque, Palangkaraya 1292012
132015 Kemen-PU
D.I Batang Anai II Paket AMS 4 D.I Batang Anai
II Package AMS 4 22102012
4112015 Kemen-PU
Hotel Watermark Jimbaran Watermark Hotel,
Jimbaran 552014
31032015 PT Harum Indah Sari Indonesia
Jalan Jolosutro-Sendang Biru Jolosutro-
Sendang Biru Road 16092013
16092015 Kemen-PU
Stadion Gresik Gresik Stadium
13052013 242015
Kemen-PU Gedung Stadion Gresik
Gresik Stadium Building
13052013 242015
Kemen-PU Pabrik Gula, Dompu
Sugar Factory, Dompu 20032014
14052015 PT Sukses Mantap Sejahtera
Terminal Bandara Supandio Pontianak Supandio Airport Terminal, Pontianak
26032013 15062015
PT Angkasa Pura II Pasar Legi Parakan
Legi Parakan Market 14022014
862015 Kemen-PU
Gedung Telkomsel Pekanbaru Telkomsel
Building, Pekanbaru 30042014
28022015 PT Graha Sarana Duta
Lower Sunter Floodway Lower Sunter
Floodway 11112013
10112015 Kemen-PU
CY dan Penahan Dinding Banjarmasin CY and
retaining wall, Banjarmasin 3122013
222015 PT Pelindo III
Ramba Jetty Conocophillip, Palembang Ramba
Jetty Conocophillip, Palembang 10102014
23102015 PT Conoco Phillips Indonesia
Packing Plant Semen Indonesia Packing Plant
Semen Indonesia 16062014
1022015 PT Semen Indonesia
Hotel Ibis Manado Ibis Hotel, Manado
1052014 1032015
PT Bahana Bina Kreasi Gedung Masjid Tebing Tinggi
Mosque Building, Tebing Tinggi
20122013 10122015
Pemkot Tebing Tinggi TPU,  GOR    Fasos  PTBA
TPU,  GOR    Fasos PTBA
21042014 16042015
PT Tambang Batubara Bukit As
Projects	with	the	Greatest	work	Value	in	2014
160
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Nama Proyek  Project Name Mulai  start
Akhir  Finish Pemilik  Owner
Jl Sultan Agung Berau Jl. Sunter Agung Berau
17022014 1242015
Kemen-PU Pengaspalan  Median  S,  Kutai
Median S Asphalting, Kutai
10102012 9102015
Kemen-PU Jembatan Merak Ilir Aji Tulur Jejangkat
Merak Ilir Aji Tulur Jejangkat Bridge
10102012 9102015
Kemen-PU Gedung SKOI Dispora Samarinda
SKOI Dispora Building, Samarinda
872014 1222015
Dispora Kaltim Jalan Akses Conoco Philips, Sekayu
Conoco Phillips Access Road, Sekayu
22092014 22092015
PT Conoco Phillips Indonesia Jembatan  Padangan-Kasiman
Padangan- Kasiman Bridge
17042014 222015
Kemen-PU Gedung  Hotel  Widyaloka  Bandung
Hotel Widyaloka Building, Bandung
22072014 1212015
PT Graha Sarana Duta Tol  Medan  Kuala  Namu
Medan  Kuala  Namu Toll Road
25012013 13072015
JO HK-China Harbour Pipa Transmisi Gas Muara Karang-Muara Tawar
Gas  Transmission  Pipe  Muara  Karang-Muara Tawar
22042014 24042015
JO HK-Moeladi-Promatcon Waduk Bendo
Bendo Dam 292013
31122017 JO HK-WIKA-NK
Jalan MRT Jakarta Package CP 106 Jakarta MRT
Rail Package CP 106 192014
152018 JO HK-SMCC
Irigasi Ciliwung Paket 2 Ciliwung Irrigation
Package 2 3122013
15052017 JO HK-Waskita
Irigasi JEDI 2A JEDI 2 A Irrigation
11112013 11112015
JO HK-Jakon
Kegiatan Usaha Konstruksi
Jasa konstruksi merupakan pengerjaan terkait perencanaan, pelaksanaan dan pengawasan suatu
bentuk isik bangunan.
Pada tahun 2014 Perseroan telah melaksanakan kegiatan usaha terkait jasa konstruksi dengan
pendapatan  sebesar  Rp5.084.130  juta  naik  2,75 dari  pendapatan  usaha  konstruksi  tahun  2013
sebesar  Rp4.948.128  juta  serta  total  aset  sebesar Rp3.895.280  juta,  turun  dari  total  aset  tahun  2013
sebesar  Rp4.992.803  juta.  Pencapaian  tersebut  telah menghasilkan  laba  sebesar  Rp110.115  juta  yang
mengalami  kenaikan  dari  laba  tahun  2013  sebesar Rp70.945 juta.
Construction Business Activities
Construction Service is an execution related to planning, implementation and supervision of a
physical form of the building. In 2014, the Company has conducted business activities
related to construction service with revenue amounted to  Rp5,084,130  million,  up  2.75  from  construction
business revenue in 2013 at Rp4,948,128 million and total  assets  amounted  to  Rp3,895,280  million,  down
from total assets in 2014 at Rp4,992,803 million. This achievement has produced earnings amounted to
Rp110,115  million  which  experienced  increase  from proit in 2013 at Rp70,945 million.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
An al
isi s
d an
Pe mb
ah asan
M an
aj e
me n
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
Tin ja
ua n
Un it
Pen du
ku ng
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
161
Annual Report 2014 | PT HUTAMA KARYA Persero
Kegiatan Usaha Properti Usaha  Properti  merupakan  jasa  penjualan  atau
penyewaan tanah dan bangunan beserta sarana dan
prasarana penunjang. Sementara  jasa terkait properti di tahun 2014,
Perseroan memperoleh pendapatan sebesar Rp364.695  juta,  naik  11,60  dari  pendapatan  usaha
properti  tahun  2013  adalah  sebesar  Rp326.791 juta  serta  total  aset  sebesar  Rp820.799  juta,  naik
18,24  dari  total  aset  usaha  properti  tahun  2013 sebesar  Rp694.175  juta.  Pencapaian  tersebut  telah
menghasilkan  laba  sebesar  Rp102.287  juta  yang mengalami  kenaikan  dari  laba  tahun  2013  sebesar
Rp71.126 juta.
Kegiatan Usaha Lainnya Usaha  sektor  lainnya  dilakukan  guna  menunjang
usaha inti Perseroan terkait dengan jasa Engineering,
Procurement  Construction EPC dan properti.
Sedangkan pendapatan pada sektor usaha lainnya sebesar  Rp312.892  juta  di  tahun  2014,  naik  17,10
dari pendapatan usaha lainnya di tahun 2013 sebesar Rp267.194 juta dengan total aset sebesar Rp206.940
juta, naik 54,99 dari total aset usaha lainnya di tahun 2013  sebesar  Rp133.516  juta.  Pencapaian  tersebut
telah  menghasilkan  laba  sebesar  Rp9.630  juta  yang mengalami  kenaikan  dari  laba  tahun  2013  sebesar
minus Rp12.324 juta
Pencapaian laba setelah pajak tahun 2014 sebesar Rp143,94  miliar,  naik  10,61  dibanding  tahun  2013
sebesar Rp130,13 miliar. Namun apabila dibandingkan dengan kapasitas penjualannya, laba tersebut telah
tercapai sebesar 2,52, sedangkan jika dibandingkan dengan  target  tahun  2014  sebesar  Rp236,00  miliar,
maka realisasi tersebut baru mencapai 60,96. Tidak tercapainya target laba tersebut akibat dari tidak
tercapainya target penjualan karena bergesernya penandatanganan kontrak di awal tahun 2015.
Property Business Activities Property  Business  is  a  service  of  sales  or  lease  of
land and building and other supporting means and
infrastructure. While services related to property in 2014, he
Company  obtained  revenue  amounted  to  Rp364,695 million, up11.60 from property business revenue in
2013 at Rp326,791 million and total assets amounted to Rp820,799 million, up 18.24 from total assets of
property  business  in  2013  at  Rp694,175  million.  This achievement has produces income amounted to
Rp102,287  million  which  experienced  increase  from proit in 2013 at Rp71,126 million.
Other Business Activities Other  business  sectors  are  conducted  to  support
the Company’s core business related to Engineering, Procurement  Construction EPC service and property.
While revenue in other business sectors amounted to Rp312,892  million  in  2014,  uo  by  17.10  from  other
business  revenue  in  2013  amounted  to  Rp267,194 million  with  total  assets  amounted  to  Rp106,940
million, up by 54.99 from other business total assets in  2013  at  Rp133,516  million.  This  achievement  has
produced  proit  amounted  to  Rp9,630  million  which experienced  increase  from  2013  proit  at  minus
Rp12,324 million.
FiNANCiAL PERFORMANCE
Achievement of proit after tax in 2014 amounted to Rp143.94 billion, up by 10.61 compared to 2013 at
Rp130.13  billion.  However  if  compared  with  its  sales capacity, the proit have achieved about 2.52, while if
compared to 2014 target at Rp236.00 billion, then the realization just reached 60.96. The failure to achieve
that proit target is due to the failure in reaching sales target which is caused by the shift in contract signing
at the beginning of 2015.
162
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Tabel Laporan Laba Rugi Dalam Miliar Rupiah
Uraian  Description 2014
2013 Perubahan  Changes
jumlah Amount
Persentase Percentage
Pendapatan Usaha Operating Revenue
5.717,07 5.501,54
215,53 3,92
Beban Pokok Pendapatan Cost of
Revenue 5.249,16
5.031,15 218,01
4,33 Laba Kotor
Gross Proit 467,9
470,39 2,49
0,53 Laba Kotor Setelah Ventura Bersama
Gross Proit After Joint Venture 515,47
541,47 26,00
4,80 Beban Usaha
Operating Expenses 206,9
168,81 38,09
22,56 Laba Usaha
Operating Income 308,57
372,66 64,09
17,20 Pendapatan Beban Lain-Lain
Other Income Expenses 29,29
68,16 38,87
57,03 Laba Tahun Berjalan Sebelum Pajak
Income For The Year Before Tax 143,94
130,13 13,81
10,61 Laba Komprehensif Bersih
Net Comprehensive Income
143,94 130,13
13,81 10,61
Laba Yang Dapat Diatribusikan Kepada: Income For The Year Attributable To:
143,94 130,13
13,81 10,61
Pemilik Entitas Induk Owner of Parent Entity
143,68 129,97
13,71 10,55
Kepentingan Non Pengendali Non
Controlling Interests 0,26
0,16 0,10
62,50 Laba Komprehensif Yang Dapat
Diatribusikan Kepada Comprehensive
Income Attributable To 143,94
130,13 13,81
10,61 Pemilik Entitas Induk
Owner of Parent Entity 143,68
129,97 13,71
10,55 Kepentingan Non Pengendali
Non Controlling Interests 0,26
0,16 0,10
62,50 Laba Per Lembar Saham Dasar Rupiah
Penuh Basic Earnings Per Share Full
Rupiah 287.354
259.943 27.411,00
10,55
A. Pendapatan
Pendapatan Perseroan pada tahun 2014 adalah sebesar Rp5.717,07 miliar, naik 3,92 dari pendapatan
usaha tahun lalu sebesar Rp5.501,54 miliar.
Hal  ini  disebabkan  oleh  peningkatan  pendapatan konstruksi  sebesar  Rp5.082,74  miliar,  naik  Rp139,81
miliar  atau  sebesar  2,83  dibandingkan  pada  2013 sebesar  Rp4.942,93  miliar.  Pendapatan  konstruksi
terdiri dari pendapatan termin karya, pendapatan
Table of income statement In Billion Rupiah
A. income Company’s revenues in 2014 is Rp5,717.07 billion, up
3.29 from last year revenue at Rp5,501.54 billion.
This  is  mainly  due  to  the  increase  of  construction income  amounted  to  Rp5,082.74  billion,  up  by
Rp139,81  billion  or  amounted  to  2.83  compared to  2013  at  Rp4,942.93  billion.  Construction  income
consists  of  Terms  works  income,  additional  works
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
An al
isi s
d an
Pe mb
ah asan
M an
aj e
me n
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
Tin ja
ua n
Un it
Pen du
ku ng
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
163
Annual Report 2014 | PT HUTAMA KARYA Persero
karya tambahan, serta pendapatan eskalasi harga. Jika  dibandingkan  dengan  RKAP  2014,  pendapatan
usaha mencapai 75,18, hal ini disebabkan perolehan proyek yang seharusnya didapat di tahun 2014
ternyata bergeser ke awal tahun 2015 sehingga belum dapat diproduksi.
Portofolio penjualan per jenis pekerjaan sepanjang 2014 dapat dilihat pada tabel berikut:
Dalam Miliar Rupiah
Uraian  Description Realisasi Pendapatan 2014
Realization of Revenue in 2014 sisa Proyek
Remaining Projects
Proyek Baru New Projects
jumlah Total
Bendungan  Irigasi Dam  Irrigation
61,70 17,31
79,01 Jalan dan Jembatan
Roads and Bridges 783,73
387,98 1.171,71
Bendungan dan Gedung Buildings
1.195,86 1.426,14
2.622,00 PelabuhanDermaga
Port  Harbor 93,82
204,71 298,53
EPCPLN, PLTU, dan Lainnya ECPPLN, PLTU, and Others
877,92 667,90
1.545,82 Jumlah
Total 3.013,03
2.704,04 5.717,07
Informasi pendapatan usaha pada 2014 dibandingkan pada 2013, sebagai berikut:
Uraian  Description 2014
2013 Perubahan  Changes
jumlah Amount
Persentase Percentage
Pendapatan Termin Karya Terms Works Revenue
4.957,68 4.775,18
182,50 3,82
Pendapatan Karya Tambahan Additional Works Revenue
87,66 60.694,36
26,97 44,43
Pendapatan Eskalasi Harga Price Escalation Revenue
37,39 107,06
69,67 65,07
Sub Jumlah Pendapatan Konstruksi Sub-Total of Construction Revenue
5.082,74 4.942,93
139,81 2,83
Pendapatan Non Konstruksi Non-Construction Revenue
634,32 558,60
75,71 13,55
Jumlah Pendapatan Total Revenue
5.717,06 5.501,54
215,52 3,92
B. Beban Pokok Pendapatan Beban  pokok  pendapatan  mengalami  peningkatan
sebesar  Rp218,01  miliar  atau  naik  4,33    menjadi Rp5.249,16 miliar dari beban pokok pendapatan tahun
2013 sebesar Rp5.031,15 miliar. Peningkatan terutama income, and price escalation income. Compared to the
2014 RKAP, revenue reached 75.18, this is due to the project acquisition which should be obtained in 2014
turned out to be shifted to the beginning of 2015, thus it cannot be produced.
Sales portfolio per projects throughout 2014 can be seen in the following table:
In Billion Rupiah
Information of operating revenue in 2014 compared to 2013 is as follows:
B. Cost of Revenues Cost of revenues experienced an increase of Rp218.01
billion or up by 4.33 to Rp5,249.16 billion from cost of revenue in 2013 at Rp5,031.15 billion. This increase
is primarily caused by increase in material price to
164
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
disebabkan oleh peningkatan harga material pada beban  pokok  sebesar  4,80  atau  sebesar  Rp78,55
miliar menjadi Rp1,71 triliun dari Rp1,64 triliun.
Beberapa  tantangan  yang  perlu  dihadapi  untuk mewujudkan kondisi tersebut, diantaranya:
•	 Berbagi  risiko  dengan  mitra  usaha  baik  dalam
proses tender maupun proses pelaksanaan proyek. •	 Sentralisasi pengelolaan material dan vendor
strategis. •	 Aliansi dengan vendor strategis untuk
mengendalikan gejolak harga beberapa jenis material dan jaminan tersedianya material di
gudang vendor dekat lokasi proyek. •	 Delivery just in time  untuk  eisiensi  pengelolaan
logistik maupun bunga bank. Informasi mengenai beban pokok pendapatan pada
2014, sebagai berikut: Dalam Miliar Rupiah
Uraian  Description 2014
2013 Perubahan  Changes
jumlah Amount
Persentase Percentage
Beban Bahan Cost of Materials
1.714,61 1.636,06
78,55 4,80
Beban Upah Cost of Wages
296,06 258,97
37,09 14,32
Beban Peralatan Cost of Equipments
375,30 354,87
20,43 5,76
Beban Sub Kontraktor Cost of Sub-Contractors
1.828,81 1824,90
3,92 0,21
Beban Jasa Pemborong Cost of Wholesaler
238,97 187,74
51,22 27,28
Beban Umum Lapangan General Expenses - Field
276,53 269,20
7,33 2,72
Beban Penyusutan Cost of Depreciation
4,30 2,69
1,61 59,88
Jumlah Beban Konstruksi Total Construction Expenses
4.734,59 4.534,42
200,16 4,41
Jumlah Beban non Konstruksi Total non-Construction Expenses
514,57 496,73
17,84 3,59
Jumlah Beban Pokok Pendapatan Total Cost of Revenue
5.249,16 5.031,15
218,01 4,33
Beban Jasa Pemborong Contractor
Service Expenses 238,97
187,74 51,23
27,29 cost of goods amounted to Rp4.80 or about Rp78.55
billion to Rp1.71 trillion from Rp1.64 trillion.
Several challenges that needs to be overcome in order to realize such condition, among others:
•	 Risk-sharing with partners both in tender and project implementation processes.
•	 Centralization of material management and strategic vendors.
•	 Establish an alliance with strategic vendors to control price luctuation of several types of material
and its availability in vendor’s warehouse near the project site.
•	 Delivery  just  in  time  for  the  eiciency  of  logistic management or bank interest.
Information regarding cost of revenue in 2014 is as follows:
In Billion Rupiah
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
An al
isi s
d an
Pe mb
ah asan
M an
aj e
me n
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
Tin ja
ua n
Un it
Pen du
ku ng
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
165
Annual Report 2014 | PT HUTAMA KARYA Persero
C. Laba Kotor
Sementara laba kotor Perseroan mengalami penurunan 0,53 atau sebesar Rp2,49 miliar menjadi
Rp467,90 miliar di tahun 2014 dibandingkan laba kotor tahun 2013 sebesar Rp470,39 miliar. Hal ini terutama
disebabkan oleh kenaikan beban pokok pendapatan.
D. Laba	Ventura	Bersama
Laba ventura bersama merupakan bagian laba dari proyek yang dilaksanakan secara bersama, dalam
suatu  ikatan  Ventura  BersamaJoint Operation  JO. TujuanKebijakan kerjasama dimaksud adalah untuk:
•	 Memperkuat Posisi Perusahaan, •	 Meningkatkan daya saing,
•	 Alih Teknologi, •	 Persyaratan masuk ke Pasar,
•	 Memperoleh laba Proit Motive, •	 Sinergi sumber daya dengan partner.
Ventura bersama dilakukan dalam skema job alokasi dan atau integrated. Pengakuan pencatatan untuk
proyek yang dilaksanakan dengan skema job alokasi dilakukan sebagaimana proyek internal, yakni
pendapatan dan biaya diakui sebagai pendapatan dan  biaya  langsung  HPP;  sedangkan  kerjasama
operasi dengan skema integrated dicatat sebagai laba ventura bersama. Bagian laba ventura bersama yang
dilakukan dengan skema integrated dalam pada 2014 tercatat  Laba  sebesar  Rp47,57  miliar  turun  33,08
dibandingkan  pada  2013,  namun  melebihi  target RKAP 2014 sebesar 18,94 yang tercatat sebesar Rp40
miliar.
E. Beban Usaha Beban  usaha  mengalami  peningkatan  22,57  atau
sebesar  Rp44,06  miliar  menjadi  Rp206,90  miliar dari  beban  usaha  tahun  2013  sebesar  Rp168,81
miliar. Peningkatan ini disebabkan karena adanya
peningkatan biaya pegawai yang digunakan untuk rekrutmen serta penyesuaian pendapatan karyawan.
Informasi beban usaha pada 2014 dibandingkan pada 2013 sebagai berikut:
C.	Gross	Proit While  Company’s  gross  proit  experienced  decrease
of  0.53  or  amounted  to  Rp2.49  billion  to  Rp467.90 billion  in  2014  compared  to  gross  proit  in  2013  at
Rp470.39 billion. This is primarily caused by increase in cost of revenue.
D. Joint	Venture	Proit
Joint venture proit is one of the part of proit from the project that is carried out together, in a Joint Operation.
PurposePolicy of the cooperation is intended to :
•  Strengthening the Company’s Position •  Improving competitiveness
•  Technology Shift •  Requirements to enter the Market
•  Proit Motive •  Synergy of resource with partners
Joint venture is carried out within the scheme of job allocation andor integrated. Likewise internal project,
the recognition of recording for project which was implemented with job allocation scheme was carried
out in the same way, which is revenue and recognized cost as the revenue and direct costs HPP; while the
cooperation with integrated scheme is recorded as the proit of joint venture. Part of the proit of joint venture
which was carried out with integrated scheme in 2014 recorded a proit of Rp47.57 billion, down by 33.08
compared  to  2013,  though  it  exceeded  the  target  of 2014 RKAP at 18.94 which amounted to Rp40 billion.
E. Operating Expenses Operating  expenses  increased  by  22.57  or  about
Rp44.06  billion  to  Rp206.90  billion  from  operating expenses  in  2013  at  Rp168.81  billion.  This  increase
is due to the Increase of employees expenses which
was used for recruitment and employee’s salary adjustment.
Information of operating expenses in 2014 compared to 2013 is as follows:
166
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Dalam Miliar Rupiah
Uraian  Description 2014
2013 Perubahan  Changes
jumlah Amount
Persentase Percentage
Beban Penjualan Sales Expenses
17,48 4,75
12,73 268,00
Beban Pegawai Employee Expenses
137,05 107,27
29,78 27,76
Beban Umum General Expenses
43,17 45,06
1,89 4,19
Beban Pengembangan Pegawai Employee
Development Expenses 5,89
8,16 2,27
27,82 Beban Penyusutan
Depreciation Expenses 3,31
3,57 0,26
7,28 Jumlah Beban Usaha
Total Operating Expenses
206,90 168,81
38,09 22,56
G. Pendapatan dan Beban Lain-Lain Pendapatan beban lain-lain pada tahun 2014 adalah
sebesar Rp172,46 miliar yang didalamnya terdiri dari pendapatan lain-lain sebesar Rp260,73 miliar dan biaya
lain-lain  sebesar  Rp88,27  miliar.  Jika  dibandingkan pada 2013, pendapatan beban lain-lain turun 57,03
atau  sebesar  Rp38,87  miliar.  Informasi  pendapatan beban lain-lain dapat dilihat pada tabel berikut:
Dalam Miliar Rupiah
Uraian  Description 2014
2013 Perubahan  Changes
jumlah   Amount Persentase
Percentage
Beban Bunga dan Provisi Interest and Provision Expenses
143,17 90,97
52,21 57,39
Pendapatan Bunga Interest Income
6,29 8,37
2,09 24,94
Laba Penjualan Aset Tetap Proit from Sales of Fixed Assets
- 2,32
2,34 100,00
Selisih Kurs Foregin Exchange
105,57 50,05
55,52 110,93
Penerimaan Piutang Yang Telah Disisihkan
Receivables Which Had Been Set Aside
10,69 4,97
5,72 115,09
Beban Rupa-Rupa – Bersih Miscellaneous Expenses - Net
49,91 42,90
92,81 216,34
Jumlah Pendapatan dan Beban Lain- lain
Total Revenue and Expenses Others
29,29 68,16
38,87 57,03
H. Beban Bunga dan Provisi Beban  Bunga  tahun  2014  mengalami  peningkatan
dari  tahun  lalu  yang  semula  sebesar  Rp90,97  miliar menjadi Rp143,17 miliar atau naik 57,18.
In Billion Rupiah
G. Revenue and Expenses Others Other  Revenue  expenses  in  2014  amounted  to
Rp172.46  billion  which  consists  of  other  revenue amounted to Rp260.73 billion and other expenses at
Rp88.27 billion. In comparison to 2013, other revenue expenses  down  by  57.03  or  Rp38.87  billion.
Information of other revenue expenses can be seen in the following table:
In Billion Rupiah
H. interest and Provision Expenses
Interest expenses in 2014 increases compared to the previous year that was Rp90.97 billion to be Rp143.17
billion or increasing by 57,18.
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
An al
isi s
d an
Pe mb
ah asan
M an
aj e
me n
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
Tin ja
ua n
Un it
Pen du
ku ng
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
167
Annual Report 2014 | PT HUTAMA KARYA Persero
i. Kontribusi Pembayaran Pajak
Pada tahun 2014 terjadi peningkatan pembayaran pajak. Peningkatan ini terutama pada pembayaran
PPN Keluaran, PPh Pasal 4 ayat 2 dan PPh pasal 22. Dalam Miliar Rupiah
No. Uraian  Description
2013 2014
i. PUsAT
HEADQUARTER A.
PPh Income Tax:
1 PPh Pasal 4 Final
Income Tax Article 4 Final 174,37
213,77 2
PPh Pasal 15 Income Tax Article 15
- -
3 PPh Pasal 21
Income Tax Article 21 11,16
1,16 4
PPh Pasal Karyawan Pasal 21 Wapu Income Tax Article of Employee, Article 21
wapu 14,02
19,13 5
PPh Badan Corporate Income Tax:
- -
a. PPh Badan Pasal 25 Corporate Income Tax Article 25
2,87 3,81
b. PPh Badan Pasal 29 Corporate Income Tax Article 29
31,74 49,47
6 PPh Pasal 22
Income Tax Article 22 3,94
26,02 7
PPh Pasal 22 Waba Income Tax Article 22 Waba
1,59 0,57
8 PPh Pasal 23 Waba
Income Tax Article 23 Waba 0,76
1,53 9
PPh Pasal 23 Wapu Income Tax Article 23 Wapu
53,09 5,86
10 PPh Pasal 26
Income Tax Article 26 -
-
jumlah PPh Total income Tax
181,77 321,32
B. PPn Barang dan Jasa
VAT for goods and services 1
PPN Keluaran VAT Out
486,08 675,89
2 PPN Masukan
VAT in 351,69
325,90
jumlah PPN Total	VAT
936,70 1.001,79
C Pajak Bumi dan Bangunan
Land and Building Tax 0,22
2,70 D
Bea Masuk dan Cukai Import Duty and Excise
- 1,53
E BPHTB
Tax on Acquisition of Land and Building -
- F
Pajak Lainnya Other Taxes
0,04 -
jumlah PPh Lainnya Total Other income Tax
0,22 4,23
ii. Daerah
Regional
A Pajak Kendaraan Bermotor PKB
Motor Vehicle Tax 0,12
0,16 B
Bea Balik Nama Kendaraan BBNKB Vehicle ownership transfer tax
- -
C Pajak Bahan Bakar Kendaraan Bermotor
Motor Vehicle Fuel Tax -
- D
Pajak Daerah Lainnya Other Local Taxes
0,04 0,06
sub jumlah sub-Total
0,47 0,22
jumlah Total
1.119,16 1.327,57
j. Laba Tahun Berjalan Laba  setelah  pajak  tercapai  sebesar  Rp143,94  miliar
dengan net proit margin sebesar 2,52 naik sebesar
10,61  dari  laba  bersih  pada  2013  yang  tercatat sebesar  Rp130,13  miliar.  Kenaikan  ini  disebabkan
karena terjadinya peningkatan dari pendapatan laba
kurs bersih.
i. Contribution of Tax Payment Tax payment increases in 2014, the increase is mainly
due to the payment of VAT Out, Income Tax Article 4 Paragraph 2 and Income Tax Article 22.
In Billion Rupiah
j. income for the Year Income  After  Tax  obtained  is  recorded  at  Rp143,94
billion  with  net  proit  margin  which  amounted  to 2,52, increasing by 10,61 of net proit in 2013 that
was recorded at Rp130,13 billion. The increase is due to the increase of net foreign exchange proit income.
168
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
An al
isi s
d an
Pe mb
ah asan
M an
aj e
me n
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
Tin ja
ua n
Un it
Pen du
ku ng
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
169
Annual Report 2014 | PT HUTAMA KARYA Persero
Jika  dibandingkan  dengan  RKAP  tahun  2014  sebesar Rp236,00 miliar, maka realisasi tersebut baru mencapai
60,99  yang  disebabkan  belum  tercapainya  target penjualan akibat bergesernya penandatanganan
kontrak di awal 2014. Pada tahun 2014 laba komprehensif Perseroan
mengalami  peningkatan  sebesar  10,61  menjadi sebesar Rp143,94 miliar dari laba komprehensif tahun
2013 sebesar Rp130,13 miliar. Kenaikan ini disebabkan karena terjadinya peningkatan dari pendapatan laba
kurs bersih.
Laporan Posisi Keuangan
Posisi keuangan Perseroan tercermin pada laporan posisi keuangan per akhir 2014 dengan total aset atau
liabiltas  dan  ekuitas  sebesar  Rp5.993,12  miliar;  yang secara  umum  mengalami  kenaikan  sebesar  Rp58,22
miliar atau naik 0,98 dari periode 2013.
Dalam Miliar Rupiah
Uraian  Description 2014
2013 Perubahan  Changes
jumlah Amount
Persentase Percentage
Aset Lancar Current Assets
5.343,02 5.339,29
3,73 0,07
Aset Tidak Lancar Non-Current Assets
650,1 595,63
54,47 9,14
Jumlah Aset Total Assets
5.993,12 5.934,92
58,20 0,98
Liabilitas jangka Pendek Current Liabilities
3.676,09 3.801,38
125,29 3,30
Liabilitas Jangka Panjang Non-Current Liabilities
1.326,15 1.280,10
46,05 3,60
Total Liabilitas Total Liabilities
5.002,24 5.081,46
79,22 1,56
Ekuitas Equity
990,89 853,45
137,44 16,10
A. jumlah Aset Aset  Perseroan  adalah  sebesar  Rp5.993,12  miliar,
naik  0,98  dari  total  aset  pada  tahun  2013  sebesar Rp5.934,92  miliar.  Kenaikan  ini  terjadi  karena
pembayaran pajak dibayar dimuka dan peningkatan
persediaan dari Anak Perusahaan. Compared to RKAP 2014 that was recorded at  Rp236,00
billion,  the  realization  only  reached  60,99  due  to not achieve target sales as a result of the shifting of
contract signing in the beginning of 2014. In  2014,  Company’s  comprehensive  proit  increased
by  10.61  to  Rp143.94  billion  from  comprehensive income  in  2013  at  Rp130.13  billion.  This  increase  is
caused by the increase in net foreign exchange proit income.
statement of Financial Position Company’s inancial position is relected on statement
of  inancial  position  as  of  the  end  of  2014  with  total assets or liabilities and equity which amounted to
Rp5.993,12  billion;  generally  increasing  by  Rp58,22 billion or 0,98 of period of 2013.
In Billion Rupiah
A. Total Assets Company’s  assets  amounted  to  Rp5,993.12  billion,
up  by  0.98  from  total  assets  in  2013  amounted to  Rp5,934.92  billion.  This  increase  is  caused  by  tax
payment-paid in advance and increase in inventories
of subsidiaries.
170
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Dalam Miliar Rupiah
Uraian  Description 2014
2013 Perubahan  Changes
jumlah Amount
Persentase Percentage
Aset lancer Current Asset
Kas dan Setara Kas Cash and Cash Equivalent
630,31 799,82
169,51 21,19
Piutang Usaha Business Receivables
Pihak Berelasi Related Party
309,05 325,21
16,16 4,97
Pihak Ketiga Pihak Ketiga
488,02 504,67
16,65 3,30
Piutang Retensi Retention Receivable
Pihak Berelasi Related Party
98,51 99.76
1,25 1,25
Pihak Ketiga Third Party
312,96 326,05
13,09 4,01
Tagihan Bruto Kepada Pemberi Kerja Gross invoice To Employer
Pihak Berelasi Related Party
519,45 494,28
25,17 5,09
Pihak Ketiga Third Party
1.148,63 1.514,04
365,41 24,13
Piutang Lain-lain Other Receivables
71,53 54,60
16,93 31,01
Persediaan Inventories
878,20 595,13
283,07 47,56
Uang Muka Down Payment
89,24 57,47
31,77 55,28
Jaminan Guarantee
5,17 17,81
12,64 70,97
Pajak Dibayar di Muka Prepaid Taxes
459,69 238,04
221,65 93,11
Biaya Dibayar di Muka Prepaid Expenses
332,27 312,39
19,88 6,36
Jumlah Aset Lancar Total Current Assets
5.343,02 5.339,29
3,73 0,07
Aset Tidak Lancar Non-Current Assets
Investasi Pada Entitas Asosiasi Total investment in associate entities
23,38 22.17
1,21 5,46
Investasi Pada Ventura Bersama Total Investment in Joint Venture
267,42 265,64
1,78 0,67
Investasi Jangka Panjang Lainnya Other Long-Term Investment
96,61 47,36
49,25 103,99
Piutang Usaha jangka Panjang Long-Term Business Receivables
Pihak Berelasi Related Party
- -
- -
Pihak Ketiga Third Party
- -
- -
Piutang Berelasi Non Usaha Non business related receivables
60,82 60,82
0,00 0,00
Aset Tetap Fixed assets
135,54 136,02
0,48 0,35
Aset Dalam Pelaksanaan Assets in the Implementation
6,12 -
6,12 100
Aset Pajak Tangguhan Deferred tax assets
0,50 0,09
0,41 455,56
Aset Lain-lain Other Assets
59,71 63,52
3,81 6,00
Jumlah Aset Tidak Lancar Total Non-Current Assets
650,10 595,63
54,47 9,14
Jumlah Aset Total Assets
5.993,12 5.934,92
58,20 0,98
In Billion Rupiah
K ila
s K
in er
ja 2
1 4
F la
sh b
a ck
Per for
m a
n ce
2 1
4
An al
isi s
d an
Pe mb
ah asan
M an
aj e
me n
M an
age me
n t
Di sc
u ss
ion an
d A
n al
ys is
La p
or a
n M
a n
a jem
en
M an
age me
n t
R ep
ort
Pr oi
l Per usa
ha an
Comp an
y Proi
le
Tin ja
ua n
Un it
Pen du
ku ng
Su p
p ori
tn B
u ss
in es
s R
ev ie
w
Ta ta
K elola
Per usa
ha an
G ood
Corp orat
e G
ov ern
an ce
Ta ng
gu ng
Ja w
ab S
osia l Per
usa ha
an
Corp orat
e Soc
ial R
es p
on si
b il
it y
171
Annual Report 2014 | PT HUTAMA KARYA Persero
1. Aset Lancar Aset  lancar  Perseroan  adalah  sebesar  Rp5.343,02
miliar, naik 0,07 dari aset lancar tahun 2013 sebesar Rp5.339,29  miliar.  Kenaikan  ini  disebabkan  oleh
meningkatnya pembayaran pajak dibayar dimuka dan
peningkatan persediaan dari Anak Perusahaan. •	 Kas dan Setara Kas
Pada 2014, kas dan setara kas tercatat sebesar Rp630,31 miliar, turun 21,19 dibandingkan pada
2013  sebesar  Rp799,82  miliar.  Penurunan  ini terutama disebabkan oleh penempatan deposito
pada  bank  yang  turun  108,77  atau  sebesar Rp108,77 miliar. Tingkat bunga deposito berjangka
per tahun tercatat rata-rata sebesar 5,5 - 9,8 pada 2014 serta 7,00-11,55 pada 2013.
Dalam Miliar Rupiah
Uraian  Description 2014
2013 Perubahan  Changes
jumlah   Amount Persentase
Percentage
Kas Cash
1,60 2,58
0,98 37,98
Bank Bank
235,50 295,25
59,75 20,24
Deposito Deposits
393,21 501,98
108,77 21,67
Jumlah Total
630,31 799,82
169,51 21,19
•	 Piutang Usaha Komposisi  piutang  usaha  pada  2014  terdiri  dari
38,77  berasal  dari  pihak  berelasi  dan  sisanya 61,23 dari pihak ketiga. Pada 2014, piutang usaha
tercatat  mengalami  penurunan  sebesar  3,94 atau sebesar Rp32,81 miliar dari sebesar Rp829,88
miliar pada 2013 menjadi Rp797,07 miliar.
Dalam Miliar Rupiah
Uraian  Description 2014
Persentase Percentage
2013 Persentase
Percentage
Pihak Berelasi Related Parties
309.046.639.705 38,77
325.207.505.893 39,19
Pihak Ketiga Third Parties
488.018.405.874 61,23
504.674.967.141 60,81
Jumlah Piutang Usaha Total Trade Accounts
Receivable 797.065.045.579
100 829.882.473.034
100
1. Current Assets Company’s current assets are Rp5,343.02 billion, up by
0.07 from 2013 at Rp5,339.29 billion. This increase is caused by the increase in tax payment-paid in advance
and increase in inventories of subsidiaries.
•	 Cas and Cash Equivalent In 2014, cash and cash equivalent are recorded at
Rp630,31 billion, decreasing by 21,19 compared to  2013  that  was  Rp799,82  billion.  The  decrease
is  mainly  due  to  deposits  placement  in  the  Bank which  decreases  by  108,77  or  Rp108,77  billion.
Interest rate of time deposits per year is recorded at the average of 5,5 - 9,8 in 2014 and 7,00-11,55
in 2013.
In Billion Rupiah
•	 Business Receivable Composition of business receivables in 2014
consist  of  38,77  from  related  party  and  61,23 from the third party. In 2014, business receivables
decrease by 3,94 or Rp32,81 billion of  Rp829,88 billion in 2013 to be Rp797,07 billion in 2014.
In Billion Rupiah
172
PT HUTAMA KARYA Persero | Laporan Tahunan 2014
Dalam Miliar Rupiah
Uraian  Description 2014
2013 Perubahan  Changes
jumlah   Amount Persentase
Percentage
Piutang usaha jasa konstruksi Business
receivable of construction service 434,08
520,31 86,23
16,57 Piutang ventura bersama
Joint Venture receivable 235,31
193,37 41,94
21,69 Piutang usaha perdagangan
Business receivable of trading 60,77
60,68 0,09
0,15 Piutang usaha realty
Realty business receivable 101,80
94,13 7,67
8,15 Jumlah
Tota l
831,96 868,49
36,53 4,21
Penyisihan penurunan piutang Allowance of receivables decrease
34,89 38,61
3,72 9,63
Jumlah Total
797,07 829,88
32,81 3,95
•	 Piutang Retensi Piutang Retensi mengalami penurunan sebesar
3,37  atau  sebesar  Rp14,34  miliar  dari  tahun sebelumnya  sebesar  Rp425,82  miliar  menjadi
Rp411,47  miliar.  Penurunan  ini  disebabkan  oleh adanya retensi yang sudah jatuh tempo atas
proyek-proyek yang telah dikerjakan sehingga dapat ditagihkan kepada pemberi kerja.
•	 Tagihan Bruto Kepada Pemberi Kerja Tagihan  bruto  pemberi  kerja  mengalami
penurunan  sebesar  Rp365,41  miliar  atau  sebesar 24,13 dari Rp2.008,33 miliar pada 2013 menjadi
Rp1.668,08  miliar  pada  2014.  Dengan  komposisi yaitu sebesar Rp519,45 miliar 31,14 merupakan
tagihan bruto pemberi kerja pihak berelasi dan sebesar  Rp1148,63  miliar  68,86  merupakan
tagihan bruto pada pemberi kerja pihak ketiga.
•	 Piutang Lain-Lain Pada 2014, piutang lain-lain tercatat sebesar
Rp71,52 miliar, naik 31,01 atau sebesar Rp16,93 miliar  dibandingkan  pada  2013  sebesar  Rp54,60
miliar. In Billion Rupiah
•	 Retention Receivables Retention receivable decreases by 3,37 or 14,34
billion from the previous year that amounted to  Rp425,82  billion  to  be  Rp411,47  billion.  The
decrease is due to retention which is due on the
projects that have been carried out so that it can be invoiced to the employer.
•	 Gross Invoice To Employer Gross invoice to employer decreases by Rp365,41
billion  or  24,13  of  Rp2.008,33  billion  in  2013  to be  Rp1.668,08  billion  in  2014.  The  composition
are:  Rp519,45  billion  31,14  is  gross  invoice  to employer  of  related  party  and  Rp1148,63  billion
68,86 is gross invoice to employer of third party.
•	 Other Receivables In 2014, other receivables are recorded at Rp71,52
billion,  increasing  by  31,01  or  Rp16,93  billion compared in 2013 that was Rp54,60 billion.