IKATAN lanjutan COMMITMENTS continued

LAPORAN T AHUNAN 2010 ANNUAL REPOR T | PT SEMEN GRESIK PERSERO Tbk. The original consolidated financial statements included herein are in the Indonesian language. PT SEMEN GRESIK PERSERO Tbk DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN Tahun yang Berakhir Pada Tanggal-tanggal 31 Desember 2010 dan 2009 Disajikan dalam ribuan Rupiah, kecuali dinyatakan lain PT SEMEN GRESIK PERSERO Tbk AND ITS SUBSIDIARIES NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS Years Ended December 31, 2010 and 2009 Expressed in thousands of Rupiah, unless otherwise stated 103 37. IKATAN lanjutan 37. COMMITMENTS continued No. Pemasok Suppliers Tanggal perjanjian Date of agreements Lingkup pekerjaan Scope of work Nilai komitmen Open commitments ix. PT Varia Usaha Dharma Segara 28 Juli 2010 July 28, 2010 Pekerjaan Jasa Pengangkutan Peralatan Paket IIA LAUT Employment transportation services equipment Package IIA sea. USD1.179.771 x. PT Rekayasa Indusri Persero 28 Juli 2010 July 28, 2010 Pekerjaan EPC Power Plant EPC work for Power Plant. USD51.646.884 xi. Kawasaki Heavy Industries 28 Juli 2010 July 28, 2010 Pekerjaan EPC Power Plant EPC work for Power Plant. USD24.225.000 xii. PT Bumi Sarana Beton 28 September 2009 September 28, 2009 Pengadaan ready mix concrete Procurement of ready mix concrete. Rp19.822.327 xiii. PT Bukit Jaya Abadi 1 Desember 2009 December 1, 2009 Pekerjaan Pabrikasi dan Pemasangan Steel Structure, Clay dan gudang silika Manufacturing and installing Steel Structure, clay and silica storage. Rp15.014.348 xiv. PT LM System Indonesia 10 Mei 2010 May 10, 2010 Pekerjaan Pile cap, Struktur atas CF Silo dan Silo semen Employment pile cap, CF Silo structure and cement silo. Rp27.890.097 xv. PT Cigading Habeam Center 22 Juli 2010 July 22, 2010 Pabrikasi Steel Structure Limestone Storage Manufacturing of Steel Structure Limestone Storage. Rp17.200.000 xvi. PT Cigading Habeam Center 22 Juli 2010 July 22, 2010 Pabrikasi Steel Structure Raw mill,Raw mill feed bin, Coal Mill.Lime stone Crusher,Clay Crusher dan Silica Manufacturing of Steel Structure Raw mill,Raw mill feed bin, Coal Mill.Lime stone Crusher,Clay Crusher and Silica. Rp18.000.000 xvii. PT Boma Bisma Indra 22 Juli 2010 July 22, 2010 Pabrikasi part Electrostatic Precipitator, Conditioning Tower Preduster paket Manufacturing of part Electrostatic Precipitator, Conditioning Tower Preduster package. Rp15.040.000 xviii. PT Kokoh Semesta 09 Agustus 2010 August 09, 2010 Lokal Pabrikasi Cement Mill dan Cement Silo Packer Manufacturing of Cement Mill. Rp21.920.000 xix. PT Swadaya Graha 27 September 2010 September 27, 2010 Lokal Pabrikasi Cement Mill dan Cement Silo Packer Manufacturing of Cement Mill, cement silo and packer. Rp17.793.618 xx. PT Bukit Jaya Abadi 21 Oktober 2010 October 21, 2010 Pabrikasi Equipment FrameGallery Pan Conveyor, Belt Conveyor dan Mechanical Accessories Manufacturing of Equipment Frame. Rp14.560.000 LAPORAN T AHUNAN 2010 ANNUAL REPOR T | PT SEMEN GRESIK PERSERO Tbk. The original consolidated financial statements included herein are in the Indonesian language. PT SEMEN GRESIK PERSERO Tbk DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN Tahun yang Berakhir Pada Tanggal-tanggal 31 Desember 2010 dan 2009 Disajikan dalam ribuan Rupiah, kecuali dinyatakan lain PT SEMEN GRESIK PERSERO Tbk AND ITS SUBSIDIARIES NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS Years Ended December 31, 2010 and 2009 Expressed in thousands of Rupiah, unless otherwise stated 104 37. IKATAN lanjutan 37. COMMITMENTS continued