Proyeksi Kebutuhan Listrik Per Sektor

71 2016 INDONESIA ENERGY OUTLOOK Kebutuhan listrik per kapita pada tahun 2014 masih rendah berkisar 788 kWhkapita, kemudian naik menjadi 1.705 kWhkapita pada tahun 2025, dan 3.668 kWhkapita pada tahun 2050. Kebutuhan listrik per kapita tersebut lebih rendah dari target KEN PP 792014, karena adanya perbedaan asumsi makro seperti pertumbuhan ekonomi dan pertumbuhan penduduk, serta perbedaan asumsi teknis ketenagalistrikan, seperti faktor kapasitas pembangkit dan susut listrik selama transmisi dan distribusi. Khusus mengenai susut listrik di jaringan diprediksi akan terjadi penurunan yang cukup signiikan, pada awal periode studi 2014-2019 masih sebesar 11, maka pada akhir periode studi 2045-2050 akan mencapai 8. Electricity demand per capita in 2014 was still low for around 788 kWhcapita, and will increase to 1,705 kWh per capita in year 2025 and to 3,668 KWhcapita in year 2050. The electricity demand per capita is lower than KEN target PP 792014 due to differences in macro assumptions such as economic growth and population growth, as well as technical assumptions of electricity like plant capacity factor and electricity losses during transmission and distribution. Electricity losses are predicted to decrease signiicantly, which at the beginning of study period 2014-2019 is amounted to 11 and by the end of study period 2045-2050 will reach 8. Gambar 5.1 Kebutuhan listrik per sektor dan produksi listrik Figure 5.1 Electricity demand by sector and electricity production 199 216 318 486 664 829 976 1,102 1,205 323 513 730 946 1,150 1,334 1,491 200 400 600 800 1,000 1,200 1,400 1,600 2014 2015 2020 2025 2030 2035 2040 2045 2050 Te rr aw at t- hou rs IndustriIndustrial TransportasiTransportation Rumah TanggaHousehold KomersialCommercial Total Scenario DasarBase Scenario Total Skenario TinggiHigh Scenario 72 OUTLOOK ENERGI INDONESIA 2016 Pada tahun 2014 pembangkit listrik nasional adalah 51,62 GW, terdiri dari pembangkit PLN 76, IPP 15, IO dan PPU 9. Untuk memenuhi kebutuhuan listrik tersebut, kapasitas pembangkit listrik mencapai 124 GW untuk skenario dasar atau 131 GW pada skenario tinggi pada tahun 2025, dengan pola kepemilikan yang hampir sama dengan kondisi tahun 2014. Adapun kapasitas pembangkit listrik nasional pada tahun 2050 akan meningkat menjadi 307 GW atau tumbuh sebesar 5,1 per tahun skenario dasar, dan untuk skenario tinggi tumbuh sekitar 5,7 per tahun mencapai 380 GW. Selanjutnya, hasil proyeksi kedua skenario ini menunjukkan bahwa PLTU batubara selama masa periode studi tetap dominan dibanding dengan pembangkit jenis lain, pada tahun 2050 akan mencapai 171 GW skenario dasar dan 230 GW skenario tinggi, atau mempunyai pangsa dikisaran 56 dan 61. Hal ini dapat dimengerti mengingat Indonesia masih mempunyai sumber daya batubara yang besar, selain itu juga harga batubara saat ini cenderung turun akibat melemahnya demand batubara dunia. Faktor lain yang tak kalah penting adalah PLTU batubara dirancang untuk memikul beban dasar, karena dapat dioperasikan secara kontinyu dengan biaya operasi yang relatif murah. Selanjutnya kapasitas pembangkit EBT skala besar PLTP dan PLTA, baik untuk skenario dasar maupun skenario tinggi, diprediksi berturut-turut sebesar 6,1 GW dan 13,7 GW pada tahun 2025. Pada akhir periode studi 2050 diprediksi kedua jenis pembangkit berbasis EBT tersebut naik signiikan mencapai 19,1 GW untuk PLTP dan 28,4 GW untuk PLTA. Sedangkan untuk EBT lainnya PLTB, PLTS, PLTSa, PLT biomassa, PLT kelautan, PLT biodiesel, pada skenario dasar, diproyeksikan berkapasitas 7,6 GW dan 33,9 GW pada tahun 2025 dan 2050, dengan pangsa dikisaran 6 dan 11. Untuk skenario tinggi, total kapasitas EBT lainnya naik cukup tinggi, menjadi 8,2 GW pada tahun 2025 dan 42,2 GW pada tahun 2050. Khusus PLTN diprediksi akan masuk ke sistem kelistrikan Jawa Bali pada tahun 2035 dengan kapasitas 2 GW, dan naik menjadi 6 GW pada tahun 2050. Ini berlaku untuk kedua skenario. In 2014, national electricity generation capacity was 51.62 GW, consisting of PLN 76, IPP 15, IO and PPU 9. To meet electricity demand, power plant capacity will reach 124 GW in base scenario or 131 GW in high scenario in year 2025 with similar ownership patterns to those of 2014. As for 2050, national electricity generation capacity will increase to 307 GW, or grow by 5.1 per year base scenario, and for high scenario will grow by 5.7 per year to reach 380 GW. Furthermore, results in both scenarios show that coal power plant remains dominant during the study period which in 2050 will reach 171 GW base scenario and 230 GW high scenario, or have a share of between 56 and 61. This is understandable considering that Indonesia still has large coal resources and the coal prices tendency to fall due to weakened world coal demand. Coal-ired power plant is also designed to carry base load due to its ability to be continuously operated at relatively low operating costs Furthermore, capacity of large-scale NRE power plants geothermal pp and hydropower pp, for both scenarios, are predicted respectively at 6.1 GW and 13.7 GW by 2025. At the end of study period 2050, their capacities are projected to increase signiicantly to 19.1 GW and 28.4 GW. While other NRE power plants wind, solar, landill, biomass, ocean, and biodiesels pp, in base scenario, is projected to has capacity of 7.6 GW and 33.9 GW in 2025 and 2050, or has share of 6 and 11 respectively. For high scenario, total capacity of other NRE power plant will increase sharply, to 8.2 GW in 2025 and 42.2 GW for 2050. Nuclear power plant is estimated to enter Java-Bali electricity system in 2035 with a capacity of 2 GW, and will increase up to 6 GW in 2050. This applies in both scenarios.

5.2 Proyeksi Kapasitas Pembangkit Listrik

Power Plant Capacity Projection 73 2016 INDONESIA ENERGY OUTLOOK Proyeksi total kapasitas pembangkit listrik pada tahun 2025 dan 2050 berturut-turut sebesar 123,6 GW dan 307 GW untuk skenario dasar, serta 130,7 GW dan 380 GW untuk skenario tinggi. Kapasitas pembangkit tersebut berbeda dengan yang tertera pada PP No 79 2014 tentang KEN karena adanya perbedaan dalam asumsi makro, seperti pertumbuhan PDB dan penduduk, serta asumsi teknis, seperti faktor kapasitas, pemakaian sendiri, dan susut jaringan. Pada tahun 2014 pangsa seluruh kapasitas terpasang pembangkit berbasis EBTadalah sebesar 12,5 atau sebesar 6,5 GW. Sebelas tahun kemudian diprediksi naik sekitar 22 menjadi 27,4 GW skenario dasar dan 28,1 GW skenario tinggi. Selanjutnya, pada tahun 2050 pangsa total kapasitas pembangkit EBT, termasuk nuklir, diprediksi meningkat lebih tinggi menjadi 29 87,4 GW pada skenario dasar dan menjadi 25 95,8 GW skenario tinggi. Projections of total electricity generation capacity in 2025 and 2050 respectively amounting to 123.6 GW and 307 GW for base scenario, and 130.7 GW and 380 GW for high scenario. The total electricity generation capacity is different from KEN target in Regulation No. 79 in 2014 because of differences in macro assumptions, such as GDP and population growth, as well as technical assumptions, such as capacity factor, own use and losses . In 2014, share of total installed capacity of NRE power plant amounted to 12.5 or 6.5 GW. In the next eleven years, it is predicted to rise about 22 or up to 27.4 GW base scenario and 28.1 GW high scenario. Furthermore, in 2050 share of total NRE pp capacity, including nuclear, is predicted to increase higher to 29 87.4 GW for base scenario and 25 95.8 GW for high scenario. Gambar 5.2 Proyeksi kapasitas pembangkit listrik Figure 5.2 Projection of electricity generation capacity 52 57 81 82 124 131 169 186 211 241 249 293 281 340 307 380 50 100 150 200 250 300 350 400 SD ST SD ST SD ST SD ST SD ST SD ST SD ST SD ST SD ST 2014 2015 2020 2025 2030 2035 2040 2045 2050 G ig a w a tt NuklirNuclear EBT LainnyaOther NRE PanasbumiGeothermal HidroHydro Gas BBM Oil Fuels BatubaraCoal Total SD : Skenario Dasar Base Scenario ST : Skenario Tinggi High Scenario Pertumbuhan Skenario DasarBase Scenario Growth : 5,1 Pertumbuhan Skenario TinggiHigh Scenario Growth : 5,7