Monthly Progress Report January 2014
Western I ndonesia National Roads I mprovement Project 31
Detailed Design Preparation” combined with highway part for the Design Stage.
5 FINANCIAL MANAGEMENT INFORMATION SYSTEMS
5.1 Draw Downs and Future Costs
Details of the disbursements already made from the loan are listed in the following
Monthly Progress Report January 2014
Western I ndonesia National Roads I mprovement Project 32
sub section.
5.2 Disbursement
The total disbursement from the loan to the end of January 2014 was USD 4,940,115.92 equivalent to approximately 1.98 of the loan funds.
The total expenditure to date measured in the term of the World Bank commitment, not including the Special Account advance, is shown in Appendix C. The following table
summarizes the individual disbursements as calculated by CTC but retaining the total disbursement from Client Connection at the end of January 2014.
Category Description
Loan Restructuring
Amount US Totals
Disbursed to End January in
US Disbursed
1
Part 1 Betterment
and Capacity Expansion of
National Roads. 220,400,000.00
2,732,200.92 1.24
2
Part 2
Implementation Support
16,000,000.00 1,574,976.48
9.84
3
Part 3
Road Sector Institutional
Development 1,000,000.00
4
Part 4
Contingency for Disaster Risk
Response Unallocated
12,600,000.00 LN 8043 DA-A
632,938.52
Original Loan Amount
250,000,000.00 4,940,115.92
1.98
5.3 Management Information System
5.3.1. General Overview
The Management Information System tasks include the following below:
1 Information System
Monthly Progress Report January 2014
Western I ndonesia National Roads I mprovement Project 33
a. Develop and manage a database system to store soft copy documents into a file storage server.
b. Establish a Document Management System DMS to provide: •
Letter Database System, used to record all information of incoming and outgoing letter.
• Document Library System, used to record all information of hard copy
documents then store it into libraryshelves. c. Create and maintain a WINRIP official website.
d. Develop and update a Geographic Information System GIS of spatial and roads information that overlay into Google Maps.
e. Develop and manage a Financial Management Information System FMIS, the web based application to monitoring financial progress.
f. Develop and manage a Progress Monitoring System PMS, the web
based application to monitoring physical progress. g. Provide a Complaint Handling System CHS, used and support the ACAP
activities to accommodatecomplaints from the publicviasmsgateway, email and website.
2 Data Collection and Document Upload
a. Collecting data and updating list of data catalog every month. b. Uploading documents into afilestorageserver.
3 Technical and Computer Troubleshooting
a. Setting up and manage cablenetwork of local area network and internet connection.
b. Setting up and manage hardware problem of the computer, printer, copier and phone.
c. Software installation and cleaning up of computer virus.
5.3.2. Database