Package No. 10: Sp. Empat – Air Balam Social Issues: Package No. 11: Bantal - Mukomuko Social Issues:

Monthly Progress Report January 2014 Western I ndonesia National Roads I mprovement Project 54

6.6.12. Package No. 12: Kambang – Indrapura Social Issues:

CTC received the LARAP report form Balai II PadangPMU on 01 August 2013. Review and comment from CTC was sent to PMU on 9 September 2013, and PMU forward to P2JN Local Consultant with request to revise the LARAP report based on CTC comment. Environmental Issues:- Now CTC waiting for and ensure the environmental safeguard for this package from Balai II PadangSubdit EA DTA.

6.6.13. Package No. 13: Sp. Rukis – Tj. Kemuning Social Issues:

CTC received a Larap report of package for Pasr. Pedati – Kerkap from Balai III PalembangPMU dated 7 October 2013. CTC has reviewed to finalization the Larap report during November 2013, and submitted to PMU dated 29 October 2013. The Larap report already submitted to the World Bank from PMU dated 13 November 2103 and approval the World Bank dated 20 November 2013 with some comments. Follow up the World Bank review and PMU letter, now the Larap report is being revision process by CTC. A revision of the Larap report had been submitted to the World Bank dated 9 January 2014 and approval from the WB dated 16 January 2014 with request to provide 1 the Laraps are signed by Local Government, 2 using the form provided in Laraps in the monitoring report, and 3 land appraisal value used as reference for conducting negotiation. Now, the WB request is under preparation by Satker I Bengkulu. Environmental Issues: CTC waiting for the UKLUPL document from P2JN Bengkulu

6.6.14. Package No. 14: Painan – Kambang Social Issues:

CTC received from Balai IIP2JN Padang Larap report of package for Painan –Kambang during January 2014. Now, the report is being reviewed by CTC. Environmental Issues: Now CTC waiting for and ensure the environmental safeguard for this package from Balai II Monthly Progress Report January 2014 Western I ndonesia National Roads I mprovement Project 55 PadangSubtit EA DTA.

6.6.15. Package No. 15: Sibolga – Bts. Tapsel Social Issues:

CTC received Final LARAP report form BalaiPMU on 30 September 2013. The report already submitted to the Bank on 22 October 2013 and approved by the Bank on 28 October 2013 with some comments. Follow up the World Bank review and PMU letter, now the Larap report is being revision process by CTC. A revision Larap reports had been submitted to the WB dated 30 January 2014 and now waiting some comment from the WB. Environmental Issues: The UKLUPL was sent to Bank on 30 September 2013

6.6.16. Package No. 16: Sebelat – Ipuh Social Issues:

CTC received a Larap report of package for Pasr. Pedati – Kerkap from Balai III PalembangPMU dated 7 October 2013. CTC has reviewed to finalization the Larap report during November 2013, and submitted to PMU dated 29 October 2013. The Larap report already submitted to the World Bank from PMU dated 13 November 2103 and approval the World Bank dated 20 November 2013 with some comments. Follow up the World Bank review and PMU letter, now the Larap report is being revision process by CTC. A revision of the Larap report had been submitted to the World Bank dated 9 January 2014 and approval from the WB dated 16 January 2014 with request to provide 1 the Laraps are signed by Local Government, 2 using the form provided in Laraps in the monitoring report, and 3 land appraisal value used as reference for conducting negotiation. Now, the WB request is under preparation by Satker I Bengkulu. Environmental Issues: AMDAL document not yet complete, and CTC waiting for the report from P2JN Bengkulu.

6.6.17. Package No. 17: SP. Gunung Kemala – Pg. Tampak Social Issues:

The Larapreport has reviewed by CTC and submitted to PMU dated 30 August 2013. The