50.03 82.02 117.02 WINRIP DOC MPR CTC MPR No.13 2014 01 2014 01 09 00225.

28-Feb-02 Contract Package Original Add Actual To Original To Add days days days Constr. Escalation T O T A L DIV0 - DIV0 DIV0 DIV0 DIV0 DIV0 109,670.00 Appendix - A1 IBRD LOAN No. 8043-ID Scheduled TIME Contract Sum Incl. Tax in Rp Million Last Month SUMMARY OF OVERALL PHYSICAL PROGRESS OF CIVIL WORK AWP-1 WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP Const.Period Accumulate Progress of Civil Works Original 1 January 2014 To date Addendum Eq.Rp.Million Eq.Rp.Million Eq.Rp.Million To date Total Contractors Time Elapsed This Month Eq.Rp.Million 1 January 2014 NO LINK NAME PACKAGE CODE EFFECTIVE LENGTH KM CONTRACTOR ORIGINAL CONTRACT PRICE incl. TAX CONTRACT PRICE AFTER ADDENDUM Incl. TAX, Excl. Prc.Escalation CONTRACT SIGNED DATE START DATE ORIGINAL CONTRACT DURATION DAYS CONTRACT DURATION AFTER ADDENDUM DAYS PLANNED PROGRESS ACTUAL PROGRESS CERTIFICATE OF COMPLETION ISSUED COMMENTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Total for AWP-1 - - DIV0 DIV0 CIVIL WORKS PROGRESS STATUS OF AWP-1 WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP IBRD LOAN No. 8043-ID Appendix - A2 Western I ndonesia National Roads I mprovement Project Appendix B Highway Design Progress Appendix B. Technical Design Reviewing and Road Safety Audit Progresss Jan 2014. , Amendment 9.7 6 126,219 Date 01-Feb-13 08-May-13 04-Apr-13 01-May-13 15-Jul-13 17-Sep-13 Amendment 20.9 7 83,752 Date 02-May-13 18-Jul-13 18-Sep-13 17-Sep-13 Amendment 19.5 7 184,714 Date 12-Aug-13 24-Oct-13 27-Sep-13 Amendment 46.8 7 161,963 Date 24-Jun-13 24-Oct-13 27-Sep-13 Amendment Date Amendment 61.7 7 252,629 Date 24-Jun-13 24-Oct-13 27-Sep-13 Amendment 50.1 6 224,090 Date 18-Mar-13 18-Jul-13 18-Sep-13 18-Jul-13 Amendment 55.2 7 316,306 Date 12-Aug-13 24-Oct-13 27-Sep-13 Amendment 56.3 7 287,549 Date 18-Mar-13 18-Jul-13 18-Sep-13 18-Jul-13 Amendment Date Amendment 36 7 353,956 Date 28-Mar-13 08-May-13 21-Aug-13 04-Apr-13 01-May-13 23-Sep-13 Amendment Date Amendment Date 26-May-13 Amendment Date Amendment 10.8 7 32,623 Date 02-May-13 18-Jul-13 18-Sep-13 17-Sep-13 Amendment Date Amendment Date Approval By BINTEC Total Process Remark Status Received Datum Post-Review Site Visting Full-Review Group Pkg No. Name of Sub-project ECL Length km Width m RSA Audit Presentation Discussion Techinical Report Submission Quality Assurance AWP-2 5 Sp.Rampa – Poriaha Link No.015.xx Original 11.1 6 Estimated Cost Excl.VAT mil. RP Technical Design Review Process for Design Stage 55,126 Process 97 Technical Review by CTC 6 PS.Pedati - Kerkap Link No.010.0 Original 25 7 72,019 Process 95 Technical Review by CTC 7 Indrapura – Tapan Link No.019.0 Original 19.5 7 96,921 Process 95 Technical Review by DSC Processed by DSC 8 Bts.Pariaman – Manggopoh Link No.024.0 Original 46.8 7 183,268 Process 95 Technical Review by DSC Processed by DSC 9 Rantau Tijang – Kota Agung Link No.026.1 Original 42 7 149,831 Process 10 Sp.Empat – Sp. Air Balam Link No.034.1 Original 61.7 7 241,617 Process 95 Technical Review by DSC Processed by DSC 11 Bantal - Mukomuko Link No.015.2 Original 50.1 6 157,820 Process 97 Processed by DSC 13 SP.Rukis - TJ.Kemuning Link No.006.0 Original 56.3 7 225,481.5 Process Technical Review by CTC 12 Kambang – Indrapura Link No.017.2 Original 55.2 7 171,948 Process 95 Technical Review by DSC 97 Technical Review by CTC AWP-3 14 Painan – Kambang Link No.017.1 Original 31.5 7 118,993 Process 15 Sibolga – Bts TapSel Link No.016.1 Original 36 7 129,228 Process 97 Technical Review by CTC 16 Seblat – Ipuh Link No.010.0 Original 34.5 6 110,237 Process Process 100 Technical Review by PPC Processed by Project Preparation Consultant 18 Mukomuko – Bts.Sumbar Link No.015.3 Original 25.8 6 69,223 17 Sp.Gng Kemala–Pg.Tampak Link No.061.1 Original 36.8 6 104,238 Process 19 Lais - Bintuan Link No.009.1 Original 11.6 7 37,558 Process 95 Technical Review by CTC 20 Lubuk Alung – Sicincin Link No.009.1 Original 14.6 7 54,557 Process 21 Lubuk Alung - Kuraitaji Link No. 027.0 Original 16.8 7 65,778 Process Western I ndonesia National Roads I mprovement Project Appendix C Financial Progress Western I ndonesia National Roads I mprovement Project The table below shows total expenditure to date measured in the terms of World Bank Commitment, not including the special account advance. m m W mm m b 31032012 1.45 - - - 30042012 2.90 - - - 31052012 4.35 - - - 30062012 5.80 - - - 31072012 7.25 - - - 30082012 8.70 - - - 30092012 10.15 - - - 31102012 11.60 - - - 30112012 13.05 - - - 31122012 14.50 800,000 0.32 Actual 31012013 15.95 800,000 0.32 Actual 28022013 17.40 800,000 0.32 Actual 31032013 18.85 2,207,915 0.88 Actual 30042013 20.30 2,207,915 0.88 Actual 31052013 21.75 2,207,915 0.88 Actual 30062013 23.20 2,207,915 0.88 Actual 31072013 24.65 2,207,915 0.88 Actual 31082013 26.10 2,207,915 0.88 Actual 30092013 27.55 2,207,915 0.88 Actual 31102013 29.00 2,207,915 0.88 Actual 30112013 30.45 2,207,915 0.88 Actual 31122013 31.90 2,207,915 0.88 Actual 31012014 33.35 4,940,115 1.98 Actual 28022014 34.80 31032014 36.25 30042014 37.70 31052013 39.15 30062014 40.60 31072014 42.05 31082014 43.50 30092014 44.95 31102012 46.40 30112014 47.85 31122014 49.30 31012015 50.75 28022015 52.20 Western I ndonesia National Roads I mprovement Project + , +- . + + 12 m 34 + 52 2 6 5 m + W 7 8 9 3 + : 5 ; - + 12 mm 5 m + , + - . + + 2 6 = 5 4 b 4 + 8 9 3 + : 5 ; - + 2 ; - . + 31032015 53.65 30042015 55.10 31052015 56.55 30062015 58.00 31072015 59.45 31082015 60.90 30092015 62.35 31102015 63.80 30112015 65.25 31122015 66.70 31012016 68.15 28022016 69.60 31032016 71.05 30042016 72.50 31052016 73.95 30062016 75.40 31072016 76.85 31082016 78.30 30092016 79.75 31102016 81.20 30112016 82.65 31122016 84.10 31012017 85.55 28022017 87.00 31032017 88.45 30042017 89.90 31052017 91.35 30062017 92.80 31072017 94.25 31082017 95.70 30092017 97.15 31102017 98.60 30112017 99.05 31122017 100.00 Western I ndonesia National Roads I mprovement Project Appendix D Quality Assurance Progress Western I ndonesia National Roads I mprovement Project ? A B CDE F G HI J DKL ?MM HN I B O A P N Q R N A M M January 2014 ST UV WXY X WXZ[ \][ ZZ _ `T _ Z abcb de f ghi j b j g h k c bl g f m j h je n f g m oplbl i 1. Public Holiday for Happy New Year 2014 January 01, 2014 2. Make form correction of aggregate properties January 02, 2014 3. Make form comment for JMF of aggregate testing January 03, 2014 4. Preparation PCM document January 06, 2014 5. Collecting data for preparation PCM package Biha - Krui January 07, 2014 6. Site Visit to attended pre PCM package Biha - Krui 08 09 January, 2014 7. Preparation make site visit report 10 13 January, 2014 8. Public Holiday for Milad Nabi Muhammad SAW 1435 H January 14, 2014 9. Collecting data for preparation PCM package Ipoh - Bantal January 15, 2014 10. Site visit to attended continuous PCM package Ipoh Bantal, and joint survey to determine the start and end package Ipoh-Bantal 16 18 January, 2014 11. Attend to meeting PCM package Biha Krui on DGH office Jakarta January 20, 2014 12. Preparation data for site visit to Padang PCM January 21, 2014 13. Attend to meeting PCM package Manggopoh Pd. Sawah and Pd. Sawah Sp. Empat 22 24 January, 2014 14. Make preparation site visit report two package and submitted QAP to DGH January 27, 2014 15 Finalization Quality Assurance Plan 28 30 January, 2014 16 Public Holiday Happy New Year Imlek 2565 January 31, 2014 Western I ndonesia National Roads I mprovement Project Appendix E Environ q ental Progress and r ocial Progress Length Width Km m Result Comments Budget Alocated,Year Status BLH Approval Result Comments Budget Alocated,Year Status THE WB Approval 1 Krui - Bha Lampung 25 7 ICBPrior SPPL Air pollution, traffic congestion, steep sopes,slopes,sopt soil and rivers and beach, abrasion APBN P2JN 2010 100 YES Recommended 2010 LARAP Total PAP 2.805 in 21 Pekon. Land affected 28.763,12 M 2 ; Aset affected : building 882,13 M 2 ; Fence 2.445,41 M ; Plant 653 rod ; paddy field 25 plots ; Social Pablic Facilities Rp. 5.172.349.955 APBN, Satker PJN II Lampung, 2011 - 2012 Remaining issues : 1 redevelopment of Padang Raya Mosque in Kec. Krui Selatan will be conducted together with the physical work of the road project. 2 Certification process for remaining land is still on progress A. NOL LARAP 04 Jan 2013 ; B. NOL Implemetation LARAP 18 April 2013, Rev 26 June 2013. ENV : CTC in preparing detil environmental mitigation on construction stage discussion process with Subdit TLKJ. SOC : 1 will be conducted together with the physical work of the road project. 2 is still on progress. 2 Padang Sawah - Sp Empat Sumatera Barat 40.9 7 Total PAP 430 . No Land affected . Aset affected: building 149 unit = 2.110 M 2 ; Fence 2 unit = 341.8 M ; Kiosks BBM: 25 unit; Plant: 873 rod ; Mosque: 2 unit 2a Including Air Gadang Bridge Sumatera Barat 100 m 7 Total PAP 15. Land affected 2,110 M 2 ; Aset affected: building 6 unit = 410 M 2 ; Plant 72 rod. 3 Manggopoh - Padang Sawah Sumatera Barat 32 7 ICBPrior SPPL Air pollution, traffic congestion, market on street, sopt soil and rivers APBN P2JN 2010 100 YES Recommended 2010 LARAP Total PAP 1.338 . No Land affected . Aset affected : building 115 unit = 668,33 M 2 ; Culvert 661,05 m ; concrete foundations 1.421,60 M 3 ; Soil embankment 5.564,21 M 3 ; Plant 5.324 rod ; paddy field and lemongrass turmeric = 17.695 clumps ; Mesjid Market Rp. 1.147.700.000 APBD Prov Sumbar, Dinas PU, 20122013 1 Compensation for 15 PAP has not been paid by LG. 2 Hardening of replacement parking area around Bawan Market. A. NOL LARAP 04 Jan 2013 ; B. NOL Implemetation LARAP 18 April 2013, Rev 26 June 2013. ENV IRONMENTAL: Propose to site visit for finding environmental issues on field based on UKLUPL and SPPL.. SOC : 1 LG will be paid ASAP 2 Will be conducted together with the physical work of the road project. 4 Ipuh- Bantal Bengkulu 42.4 7 ICBPrior SPPL 100 and UKLUPL 20 Geometric, traffic congestion, steep sopes,slopes,sopt soil and rivers and beach, abrasion APBN P2JN 2010 SPPL 100, UKLUPL under preparation by CTC YES Recommended 2010 LARAP Total PAP 217. 157 was received compensation as : Aset affected : building house = 58,10 M 2 ; terace = 352,04 M2; Fence = 343,75 M ; foundations = 62,50 M 3 ; pavement = 1.369,15 M 2 ;Plant 23 rod. Rp.286.743.000. APBN, Satker PJN I, Bengkulu, 2013 The World Bank comments that UKLUPL preparation can be paralel with civil work A. NOL LARAP 10 Dec 2012 ; B.- ENVIRONMENTAL : CTC in preparing detil environmental mitigation on construction stage discussion process with Subdit TLKJ. SOC: A monitoring report consist compensation payment of 157 from the total of 217 PAPs already submitted to the WB from PMU dated 24 Dec 2013, and now waiting a comment for the report from the WB. 5 Sp. Rampa - Poriaha Sumatera Utara 11.1 6 NCBPost UKLUPL slope stability, water quality, Run off, bridges acces, continued traffic access quarry problem APBN BBPJN I 2011 100 YES Recommended 2011 Simple LARAP 1 PAP with aset affected : 1 kios BBM. Agree to relocate the kios. relocate to the beside her house. relocating costs be the responsibility of the project Rp.53.000.000. APBN, Satker PJN II, Sumut, 2014 Process relocation one kios PremiumBBM pararel with construction activities. A. NOL LARAP 16 Sept 2013, and approval revision the report 12 Nov 2013; B.- ENVIRONMENTAL : pr opose to site visit for finding environmental issues on field. Based on UKLUPL doc. SOC: PMUCTC is waiting report of implementation of the Larap from Head of Satker II Lampung Province. 6 Ps Pedati - Kerkap Bengkulu 25 7 NCBPost UKLUPL Comersil areas, traffic congestion, market on the street, air pollution noise, APBN TLKJ 2011 100 YES Recommended 2010 LARAP Total PAP 166 . Land affected 156 plot = 3.925 M 2 . Aset affected : building 47 unit = 1.168 M 2 ; Fence 38 unit = 491 M ; Plant 271 rod ; electricity pole 10 unit RP. 8.049.290.000 APBN, Satker PJN I, Bengkulu, 2014 NOL LARAP with some comments A. NOL LARAP 20 November 2013; B.- ENVIRONMENTAL : Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for finding environmental issues on field. SOCIAL: revison LARAP under proses 7 Indrapura - Tapan 1 Doc Amdal Sumatera Barat 19.5 7 ICBPrior AMDAL Sensitive forest areas, social issues, slope stability, water quality, waste management, air pollution, squater on ROW etc APBN TLKJ 2012 95 Not Yet Simple LARAP APBD Prov Sumbar, Dinas PU, LARAP under preparation by the local consultant BBPJN II Larap: Not Yet ENVIRONMENTAL ; CTC will push the AMDAL consultant to finalize the report as soon as possible then Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for finding environmental issues on field. SOCIAL: PMU waiting a Larap Report from Balal II PadangPJN West Sumatera 8 Bts. Kota Pariaman - Manggopoh Sumatera Barat 46.8 7 ICBPrior AMDAL Comersil areas, market, public facilities, Air pollution, traffic congestion, market on street, sopt soil and rivers APBN TLKJ 2011 100 YES Recommended July 2013 LARAP APBD Prov Sumbar, Dinas PU, Under reviewing by the LARAP consultant base on CTC comment . Larap: Not Yet ENVIRONMENTAL; ; Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor RKPPL. SOCIAL: PMU waiting a Larap Report from Balal II PadangPJN West Sumatera 9 Rantau Tijang - Kota Agung Lampung 42 7 ICBPrior UKLUPL Sensitive areas, resident, air pollution, traffic congestion, steep sopes,slopes,sopt soil and APBN TLKJ 2011 100 YES Recommended 2012 LARAP This package will be replaced with other link by DGH, and require to screening environmental and social safeguards from Subdit EA 10 Sp Empat - Sp Air Balam Sumatera Barat 61.7 7 ICBPrior AMDAL Sensitive forest areas, social issues, slope stability, water quality, waste managemnt, bridge traffic access quarry problem APBN TLKJ 2011 100 YES Recommended July 2013 LARAP APBD Prov Sumbar, Dinas PU, Under reviewing by the LARAP consultant base on CTC comment . Larap: Not Yet ENVIRONMENTAL;; Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor RKPPL.SOCIAL: PMU waiting a Larap Report from Balal II PadangPJN West Sumatera 11 Bantal - Mukomuko 1 Paket doc AMDAL Bengkulu 50.1 6 ICBPrior AMDAL Sensitive areas, social issues, market on the street, geometric, waste managemnt, continued traffic access, etc APBN TLKJ 2011 95 Not Yet LARAP Total PAP 292 . Land affected 291 plot = 8.983 M 2 . Aset affected : building 99 unit = 1.603 M 2 ; Fence 12 unit = 219 M ; Plant 143 rod ; electricity pole 22 unit ; Telkom Pole 5 unit RP. 8.237.443.000 APBN Satker PJN I, Bengkulu, 2014 NOL LARAP with some comments A. NOL LARAP 20 November 2013; B.- ENVIRONMENTAL : CTC will push the AMDAL consultant to finalize the report as soon as possible the propose to site visit for finding environmental issues on field based on RKLRPL. SOCIAL: revison LARAP under proses 12 Kambang - Indrapura 1 Doc Amdal Sumatera Barat 55.2 6 ICBPrior AMDAL Resident, productive land, Catcment areas,rivers, slope stability, squater on the street, land acquisition. APBN TLKJ 2011 95 Not Yet LARAP APBD Prov Sumbar, Dinas PU, Under reviewing by the LARAP consultant base on CTC comment . Larap: Not Yet ENVIRONMENTAL; CTC will push the AMDAL consultant to finalize the report as soon as possible then Input RKLRPL integration to design doc.SOCIAL: PMU waiting a Larap Report from Balal II PadangPJN West Sumatera Remaining issues : 1 ompensation for Total 21 PAP 5 on the bridge Air Gadang and 16 on the road have not been paid by LG prior sign contract. 2 Certification process splitzing PAP on Bridge is still on progress. 3 Management of Kinali and Tamparuang Market will be conducted together with the physical work of the road project. A. NOL LARAP 13 Jan 2013 ; B. NOL Implemetation LARAP 19 July 2013 SPPL UKLUPL Bridge LARAP Rp.2.340.600.000 APBD Prov Sumbar, Dinas PU, 2012 APBN P2JN 2010 100 ENVIRONMENTAL STATUS PROGRESS FOR WINRIP, IBRD LOAN NO.8043-ID Remedial Action AWP - 1 No Loan Package Name Provinces P r o c Approval Status by Environmental Agency BLH Environmental Screening Social Screening Approval Status by The World Bank YES Recommended 2010 ICBPrior Appendix E : Progress of Environmental Safeguard Studies on WINRIP as per 31 January, 2014 one link,sensitive areasresident, public,facilities, squater, market,sopt soil and rivers ENV IRONMENTAL: Propose to site visit for finding environmental issues on field based on UKLUPL and SPPL. SOCIAL: 1 LG will be paid ASAP 2 Is still on progress. 3 Will be conducted together with the physical work of the road project. AWP - 2 Length Width Km m Result Comments Budget Alocated,Year Status BLH Approval Result Comments Budget Alocated,Year Status THE WB Approval Remedial Action No Loan Package Name Provinces P r o c Approval Status by Environmental Agency BLH Environmental Screening Social Screening Approval Status by The World Bank 13 Sp Rukis - Tj Kemuning Bengkulu 56.3 7 ICBPrior UKLUPL one link,sensitivesteep sopes,slopes,sopt soil and rivers, squater on the street, resident, productive land. APBN P2JN 2011 100 YES Recommended 2011 LARAP Total PAP 343 . Land affected 334 plot = 9.038 M 2 . Aset affected : building 111 unit = 2.196 M 2 ; Fence 127 unit = 1.575 M ; Plant 363 rod ; electricity pole 25 unit RP. 11.295.833.000 APBN, Satker PJN I Bengkulu, 2014 NOL LARAP with some comments A. NOL LARAP 20 November 2013; B.- ENV : Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor RKPPL. Propose to site visit for finding environmental issues on field. SOCIAL: revison LARAP under proses 14 Painan -Kambang 1 doc Amdal Sumatera Barat 31.5 7 ICBPrior AMDAL Sensitive forest areas, social issues, slope stability, water quality, waste managemnt, continued traffic access quarry problem APBN TLKJ 2011 95 Not Yet Simple LARAP APBD Prov Sumbar, Dinas PU, LARAP under preparation by the local consultant BBPJN II Larap: Not Yet ENVIRONMENTAL; CTC will push the AMDAL consultant to finalize the report as soon as possible then environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for finding environmental issues on field. SOCIAL: PMU waiting a Larap Report from Balal 15 Sibolga - Bts Tap Sel Sumatera Utara 36 7 ICBPrior UKLUPL resident, comersil areas, geometric etc. APBN BBPJN I 2011 100 YES Recommended 2011 LARAP Total PAP 1.449 . Land affected 1.531 plot = 91.083 M 2 . Aset affected : building 340 unit = 3.399 M 2 ; Fence 12 unit = 1.583 M ; Plant 385 rod. APBN, Satker PJN II, Sumut, 2014 1. Formation of the Appraisal team on process. 2. Preparation of Measurements and Inventory A. NOL LARAP 28 October 2013; B.- Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for finding environmental issues on field.SOCIAL: SOCIAL: revison LARAP under proses Seblat - Ipuh including 1 Amdal 34.5 6 Air Lalang Air Guntung Bridge 64 m 6 Sp.Gunung Kemala - Pg. Tampak 36.8 6 Way Tauu Bridge 30 m 6 18 Mukomuko - Bts. Sumbar Bengkulu 25.8 6 NCBPost UKLUPL one link,sensitivesteep sopes,slopes,sopt soil and rivers APBN TLKJ 2011 100 YES Recommended 2010 LARAP - This package will be replaced with other link by DGH, and require to screening environmental and social safeguards from Subdit EA 19 Lais- Bintunan Bengkulu 11.6 7 NCBPost UKLUPL one link,sensitiveair pollution, traffic congestion, squater on the street, etc APBN TLKJ 2011 100 YES Recommended 2010 LARAP Total PAP 82 . Land affected 82 plot = 2.852 M 2 . Aset affected : building 14 unit = 201 M 2 ; Fence 60 unit = 714 M ; Plant 20 rod ; electricity pole 8 unit Rp.3.349.829.000 APBN, Satker PJN II Lampung, 2014 NOL LARAP with some comments A. NOL LARAP 20 November 2013; B.- ENVIRONMENTAL : Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for finding environmental issues on field. SOCIAL: revison LARAP under proses 20 Lubuk Alung - Sicincin Sumatera Barat 14.6 7 NCBPost UKLUPL sensitive areasresident, land acquisition, steep sopes,slopes,sopt soil and rivers APBN TLKJ 2011 100 YES Recommended 2011 Simple LARAP APBD Prov Sumbar, Dinas PU, LARAP under preparation by the local consultant BBPJN II Larap: Not Yet ENVIRONMENTAL; Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor RKPPL.SOCIAL: PMU waiting a Larap Report from Balai II 21 Lubuk Alung -Kurataji Sumatera Barat 16.8 7 NCBPost UKLUPL one link,sensitivesteep sopes,slopes,sopt soil and rivers APBN Balai II 2011 100 YES Recommended 2011 Simple LARAP APBD Prov Sumbar, Dinas PU, LARAP under preparation by the local consultant BBPJN II Larap: Not Yet ENVIRONMENTAL; Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor RKPPL. SOCIAL: PMU waiting a Larap Report from Balai II Total PAP 129 . Land affected 129 plot = 4.124 M 2 . Aset affected : building 40 unit = 533 M 2 ; Fence 34 unit = 384 M ; Plant 51 rod ; electricity pole 5 unit RP. 4.477.591.000 APBN Satker PJN I, Bengkulu, 2014 NOL LARAP with some comments A. NOL LARAP 20 November 2013; B.- Simple LARAP 17 Lampung ICBPrior YES Recommended 2012 APBN TLKJ 2011 100 16 Bengkulu ICBPrior Environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for finding environmental issues on field. SOC: PMUCTC is waiting report of implementation of the Larap from Head of Satker II Lampung Province. sensitive areasresident, land acquisition, steep sopes,slopes,sopt soil and rivers and beach, abrasion APBN TLKJ 2011 LARAP Total PAP 1.885 . Land affected 1.926 plot = 194.278 M 2 . Aset affected : building 440 unit = 4.557 M2 ; ; Plant 4.267 rod ;paddy field 48.602 clumps. RP.57.414.485 .000 APBN, Satker PJN II Lampung, 2014 1. Formation of the Appraisal team on process. 2. Preparation of Measurements and Inventory for Affected Assets A. NOL LARAP 16 Sept 2013 ; B.- ENVIRONMENTAL : CTC will push the AMDAL consultant to finalize the report as soon as possible then environmental issues will integrated to design, Prepare environmental mitigation on construction stage for contractor RKPPL.Propose to site visit for finding environmental issues on field. SOCIAL: revison LARAP under proses Not Yet AMDAL 95 AMDAL sensitive areassteep sopes,slopes,sopt soil and rivers and beach, abrasion AWP - 3 Western I ndonesia National Roads I mprovement Project Appendix F Procure s ent Plan t Progress Appendix F Procurement Plan of Civil Works Western Indonesia National Roads Improvement Project WINRIP Name of Executing Agency: Directorate General of Highways , Ministry of Public Works. 10500 Edit 250112 Qualification Schedule Submission Notification Sub - Project Link No. Length Criteria Actual of of Km IDR x10 ⁶ USD million IDR x10 ⁶ PrePost Application Qualification A W P - 1 1 Krui - Biha Lampung 053.0 25.00 163,534.85 15.57 134,909.21 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13 640 179,888.33 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 07-Sep-15 Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 25-Nov-13 08-Jan-14 09-Oct-15 2 Padang Sawah - Sp.Empat West Sumatera 047.2 40.90 228,772.24 21.79 197,936.70 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13 730 Including Air Gadang Bridge 0.10 251,649.47 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 06-Dec-15 Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 06-Dec-13 06-Jan-14 05-Jan-16 3 Manggopoh - Padang Sawah West Sumatera 047.1 32.00 167,678.40 15.97 143,688.96 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13 730 184,446.24 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 06-Dec-15 Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 06-Dec-13 06-Jan-14 05-Jan-16 4 Ipuh - Bantal Bengkulu 015.1 42.40 247,105.24 23.53 186,936.75 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13 730 271,815.76 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 06-Dec-15 Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 14-Nov-14 13-Jan-14 12-Jan-16 Sub Total AWP - 1 807,090.72

76.87 663,471.624

82 A W P - 2 and 3 243 17 Sp.Gng Kemala - Pugung Tampak Lampung 061.1 36.80 255,269.24 24.31 ICB PQ Prior Schedule 30-Sep-13 14-Oct-13 30-Sep-13 14-Oct-13 06-Nov-13 18-Dec-13 22-Jan-14 06-Feb-14 10-Feb-14 02-Dec-13 16-Dec-13 17-Feb-14 01-Apr-14 30-Apr-14 14-May-14 7-Jul-14 11-Aug-14 720 31-Jul-16 Revised 14-Feb-14 28-Feb-14 7-Mar-14 18-Apr-14 13-May-14 27-May-14 20-Jul-14 24-Aug-14 12-Aug-16 Actual 30-Sep-13 10-Oct-13 30-Sep-13 10-Oct-13 11-Nov-13 12302013 5 Simpang Rampa - Poriaha North Sumatera 015. 9.70 152,870.49 14.56 ICB PQ Prior Schedule 06-Nov-13 20-Nov-13 06-Nov-13 20-Nov-13 22-Nov-13 6-Jan-14 7-Feb-14 21-Feb-14 24-Feb-14 2-Dec-13 16-Dec-13 4-Mar-14 15-Apr-14 19-May-14 2-Jun-14 23-Jul-14 22-Aug-14 540 12-Feb-16 Revised 17-Feb-14 3-Mar-14 10-Mar-14 21-Apr-14 16-May-14 30-May-14 23-Jul-14 27-Aug-14 17-Feb-16 Actual 07-Nov-13 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 11 Bantal - Mukomuko Bengkulu 015.2 50.10 246,499.55 23.48 ICB PQ Prior Schedule 06-Nov-13 20-Nov-13 06-Nov-13 20-Nov-13 22-Nov-13 6-Jan-14 7-Feb-14 21-Feb-14 24-Feb-14 2-Dec-13 16-Dec-13 4-Mar-14 15-Apr-14 19-May-14 2-Jun-14 23-Jul-14 22-Aug-14 720 11-Aug-16 Revised 21-Feb-14 7-Mar-14 14-Mar-14 25-Apr-14 20-May-14 3-Jun-14 27-Jul-14 31-Aug-14 19-Aug-16 Actual 07-Nov-13 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 13 Sp Rukis - Tj Kemuning Bengkulu 006.1 56.30 316,304.67 30.12 ICB PQ Prior Schedule 06-Nov-13 20-Nov-13 06-Nov-13 20-Nov-13 22-Nov-13 6-Jan-14 7-Feb-14 21-Feb-14 24-Feb-14 2-Dec-13 16-Dec-13 4-Mar-14 15-Apr-14 19-May-14 2-Jun-14 23-Jul-14 22-Aug-14 720 11-Aug-16 Revised 21-Feb-14 7-Mar-14 14-Mar-14 25-Apr-14 20-May-14 3-Jun-14 27-Jul-14 31-Aug-14 19-Aug-16 Actual 07-Nov-13 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 6 Ps. Pedati - Kerkap Bengkulu 010.0 20.88 92,127.40 8.77 NCB Post Post Schedule 13-Nov-13 27-Nov-13 13-Nov-13 27-Nov-13 04-Dec-13 03-Jan-14 02-Feb-14 16-Feb-14 16-Mar-14 15-Apr-14 450 9-Jul-15 Revised 21-Feb-14 7-Mar-14 14-Mar-14 18-Apr-14 6-May-14 30-May-14 13-Jun-14 5-Sep-15 Actual 21-Nov-13 21-Nov-13 19 Lais - Bintunan Bengkulu 009.1 10.80 35,886.28 3.42 NCB Post Post Schedule 13-Nov-13 27-Nov-13 13-Nov-13 27-Nov-13 04-Dec-13 03-Jan-14 02-Feb-14 16-Feb-14 16-Mar-14 15-Apr-14 300 9-Feb-15 Revised 21-Feb-14 7-Mar-14 14-Mar-14 18-Apr-14 6-May-14 30-May-14 13-Jun-14 8-Apr-15 Actual 21-Nov-13 21-Nov-13 15 Sibolga - Batas Tapsel North Sumatera 016.1 36.00 353,956.32 33.71 ICB PQ Prior Schedule 13-Nov-13 27-Nov-13 27-Dec-13 10-Jan-14 17-Jan-14 28-Feb-14 30-Mar-14 13-Apr-14 11-May-14 10-Jun-14 900 26-Nov-16 Revised 16-Dec-13 30-Dec-13 25-Feb-14 11-Mar-14 17-Mar-14 1-May-14 2-Jun-14 16-Jun-14 19-Jun-14 1-May-14 15-May-14 27-Jun-14 8-Aug-14 11-Sep-14 25-Sep-14 15-Nov-14 15-Dec-14 2-Jun-17 Actual 8 Bts.Kota Pariaman - Manggopoh West Sumatera 024.0 46.80 374,348.21 35.65 ICB PQ Prior Schedule 22-Nov-13 06-Dec-13 13-Dec-13 27-Dec-13 03-Jan-14 14-Feb-14 16-Mar-14 30-Mar-14 27-Apr-14 27-May-14 720 16-May-16 Revised 25-Feb-14 11-Mar-14 12-Mar-14 26-Mar-14 1-Apr-14 16-May-14 17-Jun-14 1-Jul-14 4-Jul-14 16-May-14 30-May-14 12-Jul-14 23-Aug-14 26-Sep-14 10-Oct-14 30-Nov-14 30-Dec-14 18-Dec-16 Actual 10 Simpang Empat - Sp.Air Balam West Sumatera 034.1 61.70 511,362.85 48.70 ICB PQ Prior Schedule 22-Nov-13 06-Dec-13 13-Dec-13 27-Dec-13 03-Jan-14 14-Feb-14 16-Mar-14 30-Mar-14 27-Apr-14 27-May-14 720 16-May-16 Revised 25-Feb-14 11-Mar-14 12-Mar-14 26-Mar-14 1-Apr-14 16-May-14 17-Jun-14 1-Jul-14 4-Jul-14 16-May-14 30-May-14 12-Jul-14 23-Aug-14 26-Sep-14 10-Oct-14 30-Nov-14 30-Dec-14 18-Dec-16 Actual 7 Indrapura - Tapan West Sumatera 019.0 19.50 195,476.88 18.62 NCB PQ Prior Schedule 22-Nov-13 06-Dec-13 05-Jan-14 19-Jan-14 26-Jan-14 25-Feb-14 27-Mar-14 10-Apr-14 08-May-14 7-Jun-14 630 27-Feb-16 Revised 25-Feb-14 11-Mar-14 12-Mar-14 26-Mar-14 1-Apr-14 8-May-14 9-Jun-14 23-Jun-14 25-Jun-14 8-May-14 22-May-14 2-Jul-14 7-Aug-14 1-Sep-14 15-Sep-14 21-Oct-14 4-Nov-14 25-Jul-16 Actual 12 Kambang - Indrapura West Sumatera 017.2 55.20 462,780.96 44.07 ICB PQ Prior Schedule 22-Nov-13 06-Dec-13 13-Dec-13 27-Dec-13 03-Jan-14 14-Feb-14 16-Mar-14 30-Mar-14 27-Apr-14 27-May-14 720 16-May-16 Revised 25-Feb-14 11-Mar-14 12-Mar-14 26-Mar-14 1-Apr-14 16-May-14 17-Jun-14 1-Jul-14 4-Jul-14 16-May-14 30-May-14 12-Jul-14 23-Aug-14 26-Sep-14 10-Oct-14 30-Nov-14 30-Dec-14 18-Dec-16 Actual 14 Painan - Kambang West Sumatera 017.1 31.50 118,993.00 11.33 NCB PQ Prior Schedule 30-Nov-13 14-Dec-13 05-Jan-14 19-Jan-14 23-Sep-14 28-Oct-14 22-Nov-14 6-Dec-14 17-Jan-15 31-Jan-15 630 22-Oct-16 Revised 1-Apr-14 15-Apr-14 22-Apr-14 6-May-14 4-Aug-14 11-Sep-14 9-Oct-14 23-Oct-14 25-Oct-14 11-Sep-14 25-Sep-14 2-Nov-14 8-Dec-14 5-Jan-15 19-Jan-15 27-Feb-15 13-Mar-15 2-Dec-16 Actual 16 Seblat - Ipuh, Including Bengkulu 009.4 34.50 110,237.00 10.50 NCB PQ Prior Schedule 06-Jan-14 20-Jan-14 06-Jan-14 20-Jan-14 23-Sep-14 28-Oct-14 22-Nov-14 6-Dec-14 17-Jan-15 31-Jan-15 630 22-Oct-16 Air Lalang Air Guntung Bridge 0.052 Revised 1-Apr-14 15-Apr-14 22-Apr-14 6-May-14 4-Aug-14 11-Sep-14 9-Oct-14 23-Oct-14 25-Oct-14 11-Sep-14 25-Sep-14 2-Nov-14 8-Dec-14 5-Jan-15 19-Jan-15 27-Feb-15 13-Mar-15 2-Dec-16 Actual 20 Lubuk Alung - Sicincin West Sumatera 002.0 14.60 54,557.00 5.20 NCB Post Post Schedule 31-Dec-13 14-Jan-14 05-Jan-14 19-Jan-14 20-Oct-14 24-Nov-14 12-Dec-14 5-Jan-15 19-Jan-15 540 12-Jul-16 Revised 1-Apr-14 15-Apr-14 Actual 21 Lubuk Alung - Kuraitaji West Sumatera 027.0 16.80 65,788.00 6.27 NCB Post Post Schedule 31-Dec-13 14-Jan-14 05-Jan-14 19-Jan-14 20-Oct-14 24-Nov-14 12-Dec-14 5-Jan-15 19-Jan-15 540 12-Jul-16 Revised 01-Apr-14 15-Apr-14 Actual 18 Mukomuko - Batas Sumbar Bengkulu 015.3 25.80 69,233.00 6.59 NCB Post Post Schedule 31-Jan-14 14-Feb-14 31-Jan-14 14-Feb-14 20-Oct-14 24-Nov-14 12-Dec-14 5-Jan-15 19-Jan-15 540 12-Jul-16 Revised 02-May-14 16-May-14 Actual 9 Rantau Tijang - Kota Agung Lampung 026.1 42.00 149,831.00 14.27 NCB PQ Prior Schedule 31-Jan-14 14-Feb-14 31-Jan-14 14-Feb-14 23-Sep-14 28-Oct-14 22-Nov-14 6-Dec-14 17-Jan-15 31-Jan-15 630 22-Oct-16 Revised 02-May-14 16-May-14 23-May-14 14-Oct-28 4-Aug-14 11-Sep-14 9-Oct-14 23-Oct-14 25-Oct-14 11-Sep-14 25-Sep-14 2-Nov-14 8-Dec-14 5-Jan-15 19-Jan-15 27-Feb-15 13-Mar-15 2-Dec-16 Actual Sub Total AWP - 2 3 3,091,188.60 294.40 Total AWP - 1 , 2 3 3,898,279.32 371.26 Note: , : : indicate sub-projects proposed to drop from the Work Programs WPs of WINRIP 1 USD = Exchange rate assumption for FY 2014, Ministry of Finance Ref. No. Province Procureme nt Method Estimated Cost EE Incl. VAT Estimated Cost EE Incl. VAT Contract Amount Incl. VAT10 WB Prior Post Rewiew Design Submissio n Date WB NOL Date Construc tion Period day Completion Date Submission Date NOL Date Submission Date WB NOL Date Submissio n Date PQ Document Invitation for Pre- qualification Evalt.Qualification Report Bidding Document Invitation for Bids Date Bid Opening Date WB NOL Date Submission Date Rp10,500.00 Bid Evaluation Report Contract Signature Date WB NOL Commence ment Date Package No. 15, 8, 10, 7, 12, 14, 16 and 9 where estimate cost of the package is IDR 100 Billion, PQ is essential in accordance to President Degree No. 702012 . In World Bank Aide Momoire of Implementation Review Mission dated October 29-30 and December 9-12 and 17, 2013, the World Bank proposed to use Post Qualification for the procurement of the remaining packages, either ICB or NCB due to control the delay and efficient use of Bank funds. The Procurement Plan indicates PQ until DGH takes final decision on this matter. Procurement Plan of Civil Works Western Indonesia National Roads Improvement Project WINRIP Name of Executing Agency: Directorate General of Highways , Ministry of Public Works. Updated February 18, 2014 10500 Edit 250112 Qualification Schedule Submission Notification Sub - Project Link No. Length Criteria Actual of of Km IDR x10 ⁶ USD million IDR x10 ⁶ PrePost Application Qualification A W P - 1 1 Krui - Biha Lampung 053.0 25.00 163,534.85 15.57 134,909.21 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13 640 179,888.33 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 07-Sep-15 Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 25-Nov-13 08-Jan-14 09-Oct-15 2 Padang Sawah - Sp.Empat West Sumatera 047.2 40.90 228,772.24 21.79 197,936.70 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13 730 Including Air Gadang Bridge 0.10 251,649.47 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 06-Dec-15 Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 06-Dec-13 06-Jan-14 05-Jan-16 3 Manggopoh - Padang Sawah West Sumatera 047.1 32.00 167,678.40 15.97 143,688.96 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13 730 184,446.24 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 06-Dec-15 Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 06-Dec-13 06-Jan-14 05-Jan-16 4 Ipuh - Bantal Bengkulu 015.1 42.40 247,105.24 23.53 186,936.75 ICB Pre Prior Schedule 12-Jan-11 09-Feb-11 09-May-11 07-Aug-11 15-Dec-11 09-Feb-12 13-Sep-12 28-Feb-13 01-Mar-13 07-Mar-13 18-Apr-13 05-May-13 19-May-13 18-Jun-13 730 271,815.76 Revised 17-May-13 27-May-13 08-Jul-13 10-Sep-13 24-Sep-13 14-Nov-13 06-Dec-13 06-Dec-15 Actual 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 14-Nov-14 13-Jan-14 12-Jan-16 Sub Total AWP - 1 807,090.72

76.87 663,471.624