» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» World Bank Implementation Review Mission and Site Visit
» Package 17 Sp. Gunung Kemala – Pugung Tampak AWP-3.
» Package 11 Bantal – Mukomuko AWP-2
» Package 13 Sp. Rukis – Tj. Kemuning AWP-2
» Packages 5 Simpang Rampa – Poriaha AWP-2
» Package No. 6 Pasar Pedati – Kerkap AWP-2 Package No.19 Lais – Bintunan AWP-3
» Package No.15 Sibolga – Batas Tapsel AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Project Development WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Project Objective CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Procurements WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 18.71 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 40.41 29.11 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» - 33.14 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 4 : Ipuh Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No.16 : Seblat - Ipuh
» Monitoring Report of the LARAP Package No.17 : Sp. Gunung Kemala
» Monitoring Report of the LARAP Package No.18 : Mukomuko
» Monitoring Report of the LARAP Package No.19 : Lais - Bintunan
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» Management Information System WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Project Risks and Mitigation Measures
» Current Situation Actions Required
» 2.38 II WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 1.20 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 28.83 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.97 IV WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.15 VI WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 1.28 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 21.90 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.09 VIII WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.64 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 67.46 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 5.62 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 18.06 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 31.58 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 46.36 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 60.68 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 74.81 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 83.98 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 91.27 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 96.16 100.00 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 3.71 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 5.98 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 11.28 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 16.08 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» -0.12 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» EXECUTI VE SUMMARY 5. WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 16.08 P WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 29.11 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 15.814 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» -48.74 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» -10.11 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.