-48.74 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
Appendix B. Road Safety Audit Progresss Jan 2015
,
Old 2004 New 2009
Site Visiting Submission of
Report Site Visiting
Presentation Discussion
Submission of Report
1. No Road Safety Audit at Design Stage. No
2. Road Safety Engineering Review by CTC 3. Monitoring of Traffic Management Safety by CTC
Date
13-Nov-14 29-Dec-14
13-Nov-14 29-Dec-14
1. No Road Safety Audit at Design Stage. No
2. Road Safety Engineering Review by CTC 3. Monitoring of Traffic Management Safety by CTC
Date
9-Oct-14 1. No Road Safety Audit at Design Stage.
No 2. Road Safety Engineering Review by CTC
3. Monitoring of Traffic Management Safety by CTC
Date
9-Oct-14 1. No Road Safety Audit at Design Stage.
No 2. Road Safety Engineering Review by CTC
3. Monitoring of Traffic Management Safety by CTC
Date
13-Nov-14 29-Dec-14
Date
08-May-13 04-Apr-13
01-May-13 15-Jul-13
17-Sep-13
Date
18-Jul-13 18-Sep-13
17-Sep-13 1. Technical Advisory Report by CTC, Sept 2013
24-Oct-13 27-Sep-13
2. Road Safety Audit by Dit. EA RS, May 2014 3. Result of Highway and RSA Final Review by CTC, Nov 2014
Date
1. Technical Advisory Report by CTC, Sept 2013 24-Oct-13
27-Sep-13 2. Road Safety Audit by Dit. EA RS, May 2014
3. Result of Highway and RSA Final Review by CTC, Nov 2014
Date
1. Technical Advisory Report by CTC, Sept 2013 24-Oct-13
27-Sep-13 2. Road Safety Audit by Dit. EA RS, May 2014
3. Result of Highway and RSA Final Review by CTC, Nov 2014
Date Date
18-Jul-13 18-Sep-13
18-Jul-13 1. Technical Advisory Report by CTC, Sept 2013
24-Oct-13 27-Sep-13
2. Road Safety Audit by Dit. EA RS, May 2014 3. Result of Highway and RSA Final Review by CTC, Nov 2014
Date Date
18-Jul-13 18-Sep-13
18-Jul-13
Date Date
08-May-13 21-Aug-13
04-Apr-13 01-May-13
23-Sep-13
Date
14-Aug-14 1-Sep-14
Date Date
18-Jul-13 18-Sep-13
17-Sep-13
Date Date
Total Process Remark
Status Post-Review
Site Visting Group
Pkg No.
Name of Sub-project Link No
Length km
Width m
Road Safety Audit Full-Review
Presentation Discussion
Submission of Report RSA RSE Review
Traffic Mgmt Safety Estimated
Cost Excl.VAT
mil. RP Road Safety at Design Stage
Road Safety at Constrcuction Stage
WP-1 1
Biha - Krui 17.053.0
17.027.0 25.00
7 163,535
Process
3 Manggopoh -Padangsawah
06.047.1 06.022.0
32.00 7
167,678
Process
60
2 Padangsawah - Simpangempat
06.047.2 06.021.0
40.90 7
228,772
Process
60 60
4 Ipuh - Bantal
13.051.1 13.003
42.40 7
247,105
Process
60
WP-2 5
Sp.Rampa – Poriaha xx.xxx.x
03.075.0 9.7
6 152,870
Process
7 Indrapura – Tapan
06.019.0 06.34.0
19.50 7
175,812
Process
10 Sp.Empat – Sp. Air Balam
06.034.1 06.020.0
61.70 7
511,375 50
Technical Review RSA by CTC
6 PS.Pedati - Kerkap
13.010.0 13.009.0
20.88 7
92,127
Process
50 Technical Review RSA
by CTC 50
Road Safety Audit Process by Dit. EA RS, May 2014 8
Bts.Pariaman – Manggopoh 06.24.0
06.23.0
46.80 7
374,647
Process
50
Road Safety Audit Process by Dit. EA RS, May 2014
Process
50
Road Safety Audit Process by Dit. EA RS, May 2014 11
Bantal - Mukomuko 13.015.2
13.002.0
50.10 6
246,500
Process
50 Technical Review
by CTC
12 Kambang – Indrapura