Packages 5 Simpang Rampa – Poriaha AWP-2

Western Indonesia National Roads Improvement Project 6 As e tio ed i pre ious o th’s progress report, there were three 3 applicant contractors who submitted their bids on December 29, 2014 and bids were opened on the same day. All the three 3 bidders are sole entity Contractors. The applicant bidders who submitted their bids are as follows :  PT. Maras Bangun Persada : Rp. 32,929,110,000  PT. Rodatekindo Purajaya : Rp. 33,689,459,000  PT. Sumber Tratindo Utama : Rp. 31,758,052,000 The lowest canvassed bid is submitted by PT. Sumber Tratindo Utama with an amount of Rp. 31,758,052,000 which is 11.18 elo the appro ed O er’s Esti ate of Rp. 35,756,587,000, while the 2 nd lowest bid is submitted by PT. Maras Bangun Persada in the amount of Rp. 32,929,110,000 or 7.91 low er tha the O ers’s Estimate. Bid Evaluation Report is under preparation and finalization by POKJA and expected the winning bidder will be announced by PPK on February 8, 2015.

7. Package No.15 Sibolga – Batas Tapsel AWP-3

This sub-project is included in the implementation schedule AWP-3. The Project road is 36 kilometers long and located in the Province of Sumatera Utara. The Contract Package is procured thru post qualification criteria and International Competitive Bidding ICB method using the Full e-Procurement System. Invitation to Bid was published on January 9, 2015. Pre-bid conferencemeeting was held on January 26, 2015 in BALAI I Office in Medan followed by site visit a day after Barring any unforeseen circumstances that would disrupt the tendering period, submission and opening of bids are schedule on February 23, 2015 to be held at the same place where the per-bid meeting was conducted. Procurement of Other Civil Work Contract Package The present status of other Contract Packages which are scheduled to be put on tender soon are as follow : - Package No.7 Indrapura – Tapan AWP-2 - Package No.8 Bts. Kota Pariaman – Manggopoh AWP-2 - Package No.10 Sp. Empat – Sp. Air Balam AWP-2 - Package No.12 Kambang – Indrapura AWP-2 Associated bidding documents are under preparation and finalization by the Design Supervision Consultant DSC. Detailed Engineering Design DED dra i gs a d E gi eer’s Esti ates of the four su - projects had ee resu itted to World Ba k after i corporati g the Ba k’s co e ts i the 1 st submittal. As of this writing, No Objection Letter NOL from the World Bank still to be issued. Western Indonesia National Roads Improvement Project 7 Status of the last four 4 remaining contract packages which are scheduled for procurement during the last half of the Year 2015 are as follows : - Package No.14 Painan - Kambang AWP-3 - Package No.16 Seblat - Ipuh AWP-3 - Package No.20 Lubuk Alung - Sicincin AWP-3 - Package No.21 Lubuk Alung - Kuraitaji AWP-3 Detailed Engineering Design drawings and associated bidding documents are under finalization and review BALAI II Padang. 1.5 Procurement of Three 3 Consultancy Packages Under Category 3 of the Loan Agreement, Part 3: Road Sector Institutional Development

1. Technical Assistance for Capacity Building for Disaster Risk Reduction

Terms of Reference had been finalized ith the i corporatio of Ba k’s co e ts a d formally submitted to World Bank for final review and issuance of No Objection Letter NOL. Standard Bidding Documents for ICB full e-procurement method is under final preparation. Draft of Request For Expression of Interest in under review and finalization by TLKJ and expected to be completed during the 1 st week of February 2015.

2. Technical Assistance for Capacity Building for Environmental Management

Propose to be deleted.

3. Technical Assistance for Capacity Building for Road Safety

Propose to be deleted.

1.6 Consolidated Update of the Progress of the Project

Other brief updates of the pre-construction activities of this reporting month are shown in Table 1.1.