Monitoring Report of the LARAP Package No. 10 : Sp. Empat
16. Monitoring Report of the LARAP Package No.16 : Seblat - Ipuh
Province : Bengkulu A. Previous Status : PMU resubmitted to the World Bank on January 9, 2014 the revised LARAP documents and was resubmitted again on May 21, 2014 due to some minor corrections. World Bank issued on May 30,2014 a No Objection Letter NOL on the revised LARAP documents for implementation. B. Pending Issues, Concern and Actions a Mo itori g ‘eports of the LA‘AP’s i ple e tatio for the remaining 311 PAP out of 450 PAP have to be prepared and submitted for review and for submission to World Bank. b LARAP documents for this Package No.16 covers only land acquisition for the road link. If there are land acquisition for the bridge site, a separate LARAP documents need to be prepared. c Monitoring Report for the compensation payments to 139 PAP still to be prepared and submitted by SATKER to PMU. C. Update during this reporting month of January 2015 a LARAP Implementation is underway for the remaining 311 PAP. b Payment of Compensations to 139 PAP has been released.17. Monitoring Report of the LARAP Package No.17 : Sp. Gunung Kemala
– Pg. Tampak Province : Lampung A. Previous Status : CTC re ised the LA‘AP docu e ts taki g i to co sideratio all the Ba k’s comments and PMU resubmitted the documents to the World Bank on November 6, 2013 World Bank approved the corrected LARAP documents on November 12, 2013 Director of Planning issued letter on November 18, 2013 to the Director of Implementation Affairs to inform that World Bank had already approved the LARAP documents for implementation by the land acquisition committee. B. Pending Issues, Concern and ActionsParts
» WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» World Bank Implementation Review Mission and Site Visit
» Package 17 Sp. Gunung Kemala – Pugung Tampak AWP-3.
» Package 11 Bantal – Mukomuko AWP-2
» Package 13 Sp. Rukis – Tj. Kemuning AWP-2
» Packages 5 Simpang Rampa – Poriaha AWP-2
» Package No. 6 Pasar Pedati – Kerkap AWP-2 Package No.19 Lais – Bintunan AWP-3
» Package No.15 Sibolga – Batas Tapsel AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Project Development WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Project Objective CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Procurements WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 18.71 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 40.41 29.11 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» - 33.14 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 4 : Ipuh Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No.16 : Seblat - Ipuh
» Monitoring Report of the LARAP Package No.17 : Sp. Gunung Kemala
» Monitoring Report of the LARAP Package No.18 : Mukomuko
» Monitoring Report of the LARAP Package No.19 : Lais - Bintunan
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» Management Information System WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Project Risks and Mitigation Measures
» Current Situation Actions Required
» 2.38 II WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 1.20 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 28.83 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.97 IV WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.15 VI WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 1.28 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 21.90 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.09 VIII WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.64 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 67.46 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 5.62 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 18.06 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 31.58 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 46.36 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 60.68 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 74.81 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 83.98 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 91.27 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 96.16 100.00 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 3.71 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 5.98 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 11.28 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 16.08 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» -0.12 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» EXECUTI VE SUMMARY 5. WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 16.08 P WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 29.11 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 15.814 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» -48.74 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» -10.11 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
Show more