15.814 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.

31 January 2015 In USD Estimated Contractors or Total Est. Budget Starting Completion Consultants Man-Month WB + GOI Remarks Date Date Name Excl. the PIP Original Revised Physical Man-Month Physical Man-Month Physical Man-Month Supp. Staff USD, Excl.VAT Excl. VAT Excl. VAT MM MM MM 1 Betterment and Capacity 308,730,000.00 116,376,065.58 Expansion of National Roads 1.A AWP-1 ICB DGH 81,630,000.00 57,821,551.95 1.A1 8-Jan-14 9-Oct-15 1. Krui-Biha PT. Jaya Konstruksi 11,757,337.74 67.46

18.71 -48.74

On - Going Construction 1.A2 6-Jan-14 5-Jan-16 2. Pd. Sawah-Sp. Empat PT.Jaya Konstruksi 17,250,183.32 50.52

40.41 -10.11

On - Going Construction 1.A3 6-Jan-14 5-Jan-16 3. Manggopoh-Pd. Sawah PT. Jaya Konstruksi 12,522,493.13 51.62

29.11 -22.51

On - Going Construction 1.A4 10-Jan-14 9-Jan-16 4. Ipuh-Bantal PT. Waskita Karya 16,291,537.76 47.93

13.79 -33.14

On - Going Construction 1.B AWP-2 and AWP-3 ICB NCB DGH 227,100,000.00 58,554,513.73 17. Sp. Gunung Kemala - Pg. Tampak PT. Jaya Konstruksi 16,335,263.93 Form 384 issued by World Bank, for issuance of NTP 11. Bantal - Mukomuko PT. Hutama Karya 18,765,198.80 Form 384 issued by World Bank, for issuance of NTP 13. Sp. Rukis - Tj. Kemuning PT. Waskita Karya 23,454,051.00 Form 384 issued by World Bank, for issuance of NTP 1 Packages: BER with NOL. Contract signing still to be executed 2 Packages: Bid Evaluation Report BER on going Finalization 1 Packages: On tendering period 4 Packages: DED drawings a waiting issuance of No Objection Letter NOL from World Bank 4 Packages: DED drawings on-going final review by BALAI II 2 Packages: Proposed to be deleted 1.C Contingency - DGH 6,170,000.00 2 Implementation Support 16,000,000.00 2.A Core Team Consultants CTC QCBS DGH 6-Nov-12 15-Feb-16 PT. Perentjana Djaja 556 5,000,000.00 1,276,700.00 1,315,925.00 38.301 212.95 33.804 187.95 -4.496 25.00 Supporting PMU. Joint Venture with Rp21,415,400,000.00 Rp22,426,175.00 Yongma Engineering Co.Ltd. Or US equivalent total : Amandement PT. Epadascon Permata 3,512,681.91 3,641,077.48 2.B Design Superv. Consultants QCBS DGH 19-Jun-13 18-Nov-16 Renardet S.A. 1,068 10,000,000.00 820,600.00 3.964 42.33 3.402 36.33 -0.562 -6.00 Design preparation package 7, 8, 10 and 12. Joint Venture with Rp51,818,705,000.00 PT Cipta Strada Or US equivalent total : PT. Daya Creasi Mitrayasa 6,465,729.72 PT. Seecons PT. Yodya Karya 2.C Incremental Operating Cost Varies PMU 1,000,000.00 Including Technical Audits 3 Road Sector Institutional 1,000,000.00 Development 3.A Capacity Building for NCB DGH 1,000,000.00 TOR has been finalized Disaster Risks Reduction 4 Contingency for Disaster DGH - Risk Response 5 Unallocated DGH 18,100,000.00 Total 343,830,000.00 126,354,477.31 0.450 212.95 0.395 187.95 -0.054 -25.00 Appendix - A OVERALL PROGRESS STATUS Description WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP IBRD LOAN No. 8043-ID Proc. Method Category Planned Actual Balance PROGRESS Respon- sibility Contract ValueBudget Total WB + GOI Western Indonesia National Roads Improvement Project Appendix B Highway Design Progress Appendix B. Road Safety Audit Progresss Jan 2015 , Old 2004 New 2009 Site Visiting Submission of Report Site Visiting Presentation Discussion Submission of Report 1. No Road Safety Audit at Design Stage. No 2. Road Safety Engineering Review by CTC 3. Monitoring of Traffic Management Safety by CTC Date 13-Nov-14 29-Dec-14 13-Nov-14 29-Dec-14 1. No Road Safety Audit at Design Stage. No 2. Road Safety Engineering Review by CTC 3. Monitoring of Traffic Management Safety by CTC Date 9-Oct-14 1. No Road Safety Audit at Design Stage. No 2. Road Safety Engineering Review by CTC 3. Monitoring of Traffic Management Safety by CTC Date 9-Oct-14 1. No Road Safety Audit at Design Stage. No 2. Road Safety Engineering Review by CTC 3. Monitoring of Traffic Management Safety by CTC Date 13-Nov-14 29-Dec-14 Date 08-May-13 04-Apr-13 01-May-13 15-Jul-13 17-Sep-13 Date 18-Jul-13 18-Sep-13 17-Sep-13 1. Technical Advisory Report by CTC, Sept 2013 24-Oct-13 27-Sep-13 2. Road Safety Audit by Dit. EA RS, May 2014 3. Result of Highway and RSA Final Review by CTC, Nov 2014 Date 1. Technical Advisory Report by CTC, Sept 2013 24-Oct-13 27-Sep-13 2. Road Safety Audit by Dit. EA RS, May 2014 3. Result of Highway and RSA Final Review by CTC, Nov 2014 Date 1. Technical Advisory Report by CTC, Sept 2013 24-Oct-13 27-Sep-13 2. Road Safety Audit by Dit. EA RS, May 2014 3. Result of Highway and RSA Final Review by CTC, Nov 2014 Date Date 18-Jul-13 18-Sep-13 18-Jul-13 1. Technical Advisory Report by CTC, Sept 2013 24-Oct-13 27-Sep-13 2. Road Safety Audit by Dit. EA RS, May 2014 3. Result of Highway and RSA Final Review by CTC, Nov 2014 Date Date 18-Jul-13 18-Sep-13 18-Jul-13 Date Date 08-May-13 21-Aug-13 04-Apr-13 01-May-13 23-Sep-13 Date 14-Aug-14 1-Sep-14 Date Date 18-Jul-13 18-Sep-13 17-Sep-13 Date Date Total Process Remark Status Post-Review Site Visting Group Pkg No. Name of Sub-project Link No Length km Width m Road Safety Audit Full-Review Presentation Discussion Submission of Report RSA RSE Review Traffic Mgmt Safety Estimated Cost Excl.VAT mil. RP Road Safety at Design Stage Road Safety at Constrcuction Stage WP-1 1 Biha - Krui 17.053.0 17.027.0 25.00 7 163,535 Process 3 Manggopoh -Padangsawah 06.047.1 06.022.0 32.00 7 167,678 Process 60 2 Padangsawah - Simpangempat 06.047.2 06.021.0 40.90 7 228,772 Process 60 60 4 Ipuh - Bantal 13.051.1 13.003 42.40 7 247,105 Process 60 WP-2 5 Sp.Rampa – Poriaha xx.xxx.x 03.075.0 9.7 6 152,870 Process 7 Indrapura – Tapan 06.019.0 06.34.0 19.50 7 175,812 Process 10 Sp.Empat – Sp. Air Balam 06.034.1 06.020.0 61.70 7 511,375 50 Technical Review RSA by CTC 6 PS.Pedati - Kerkap 13.010.0 13.009.0 20.88 7 92,127 Process 50 Technical Review RSA by CTC 50 Road Safety Audit Process by Dit. EA RS, May 2014 8 Bts.Pariaman – Manggopoh 06.24.0 06.23.0 46.80 7 374,647 Process 50 Road Safety Audit Process by Dit. EA RS, May 2014 Process 50 Road Safety Audit Process by Dit. EA RS, May 2014 11 Bantal - Mukomuko 13.015.2 13.002.0 50.10 6 246,500 Process 50 Technical Review by CTC 12 Kambang – Indrapura

06.17.2 06.033.0

45.20 7 438,675 Process 50 Road Safety Audit Process by Dit. EA RS, May 2014 13 SP.Rukis - TJ.Kemuning 13.006.0 13.021.0 56.30 7 316,304.8 Process 50 Technical Review by CTC WP-3 14 Painan – Kambang 06.017.1 06.032.0 31.50 7 118,993 Process Detailed Engineering Design has not finished 15 Sibolga – Bts TapSel 03.016.1 03.044.0 35.86 7 376,479 Process 50 Technical Review RSA by CTC 16 Seblat – Ipuh 13.010.0 13.004.0 34.50 6 110,237 Process Technical Review RSA by CTC 17 Sp.Gng Kemala–Pg.Tampak 17.061.1 17.025.0 36.80 6 255,269 Process No Road Safety Audit at Design Stage Processed by Project Preparation Consultant 19 Lais - Bintuan 13.009.1 13.007.0 10.80 Detailed Engineering Design has not finished 21 Lubuk Alung - Kuraitaji 06.027.0 06.025.0 16.80 7 35,886 Process 50 Technical Review by CTC 20 Lubuk Alung – Sicincin 06.009.1 06.041.0 14.60 7 54,557 Process 7 65,788 Process Detailed Engineering Design has not finished