18.71 -48.74
On - Going Construction 1.A2 6-Jan-14 5-Jan-16 2. Pd. Sawah-Sp. Empat PT.Jaya Konstruksi 17,250,183.32 50.5240.41 -10.11
On - Going Construction 1.A3 6-Jan-14 5-Jan-16 3. Manggopoh-Pd. Sawah PT. Jaya Konstruksi 12,522,493.13 51.6229.11 -22.51
On - Going Construction 1.A4 10-Jan-14 9-Jan-16 4. Ipuh-Bantal PT. Waskita Karya 16,291,537.76 47.9313.79 -33.14
On - Going Construction 1.B AWP-2 and AWP-3 ICB NCB DGH 227,100,000.00 58,554,513.73 17. Sp. Gunung Kemala - Pg. Tampak PT. Jaya Konstruksi 16,335,263.93 Form 384 issued by World Bank, for issuance of NTP 11. Bantal - Mukomuko PT. Hutama Karya 18,765,198.80 Form 384 issued by World Bank, for issuance of NTP 13. Sp. Rukis - Tj. Kemuning PT. Waskita Karya 23,454,051.00 Form 384 issued by World Bank, for issuance of NTP 1 Packages: BER with NOL. Contract signing still to be executed 2 Packages: Bid Evaluation Report BER on going Finalization 1 Packages: On tendering period 4 Packages: DED drawings a waiting issuance of No Objection Letter NOL from World Bank 4 Packages: DED drawings on-going final review by BALAI II 2 Packages: Proposed to be deleted 1.C Contingency - DGH 6,170,000.00 2 Implementation Support 16,000,000.00 2.A Core Team Consultants CTC QCBS DGH 6-Nov-12 15-Feb-16 PT. Perentjana Djaja 556 5,000,000.00 1,276,700.00 1,315,925.00 38.301 212.95 33.804 187.95 -4.496 25.00 Supporting PMU. Joint Venture with Rp21,415,400,000.00 Rp22,426,175.00 Yongma Engineering Co.Ltd. Or US equivalent total : Amandement PT. Epadascon Permata 3,512,681.91 3,641,077.48 2.B Design Superv. Consultants QCBS DGH 19-Jun-13 18-Nov-16 Renardet S.A. 1,068 10,000,000.00 820,600.00 3.964 42.33 3.402 36.33 -0.562 -6.00 Design preparation package 7, 8, 10 and 12. Joint Venture with Rp51,818,705,000.00 PT Cipta Strada Or US equivalent total : PT. Daya Creasi Mitrayasa 6,465,729.72 PT. Seecons PT. Yodya Karya 2.C Incremental Operating Cost Varies PMU 1,000,000.00 Including Technical Audits 3 Road Sector Institutional 1,000,000.00 Development 3.A Capacity Building for NCB DGH 1,000,000.00 TOR has been finalized Disaster Risks Reduction 4 Contingency for Disaster DGH - Risk Response 5 Unallocated DGH 18,100,000.00 Total 343,830,000.00 126,354,477.31 0.450 212.95 0.395 187.95 -0.054 -25.00 Appendix - A OVERALL PROGRESS STATUS Description WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP IBRD LOAN No. 8043-ID Proc. Method Category Planned Actual Balance PROGRESS Respon- sibility Contract ValueBudget Total WB + GOIParts
» WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» World Bank Implementation Review Mission and Site Visit
» Package 17 Sp. Gunung Kemala – Pugung Tampak AWP-3.
» Package 11 Bantal – Mukomuko AWP-2
» Package 13 Sp. Rukis – Tj. Kemuning AWP-2
» Packages 5 Simpang Rampa – Poriaha AWP-2
» Package No. 6 Pasar Pedati – Kerkap AWP-2 Package No.19 Lais – Bintunan AWP-3
» Package No.15 Sibolga – Batas Tapsel AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Project Development WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Project Objective CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Procurements WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 18.71 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 40.41 29.11 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» - 33.14 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 4 : Ipuh Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No.16 : Seblat - Ipuh
» Monitoring Report of the LARAP Package No.17 : Sp. Gunung Kemala
» Monitoring Report of the LARAP Package No.18 : Mukomuko
» Monitoring Report of the LARAP Package No.19 : Lais - Bintunan
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» Management Information System WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Project Risks and Mitigation Measures
» Current Situation Actions Required
» 2.38 II WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 1.20 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 28.83 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.97 IV WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.15 VI WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 1.28 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 21.90 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.09 VIII WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.64 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 67.46 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 5.62 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 18.06 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 31.58 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 46.36 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 60.68 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 74.81 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 83.98 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 91.27 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 96.16 100.00 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 3.71 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 5.98 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 11.28 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 16.08 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» -0.12 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» EXECUTI VE SUMMARY 5. WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 16.08 P WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 29.11 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 15.814 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» -48.74 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» -10.11 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
Show more