Package 13 Sp. Rukis – Tj. Kemuning AWP-2

Western Indonesia National Roads Improvement Project 5 with maximum credit of IDR 220,000,000,000. As result of detailed examination of the qualification evaluation, the Procurement Committee team proposed to award the contract to PT. Nusa Konstruksi Enjiniring, Tbk with the total bid of IDR 107,321,260,310 including provisional sum and 10 value added tax. The Revised Bid Evaluation Report BER was resubmitted to the World Bank on January 23, 2015 and the Bank responded on January 27, 2015 concurring the award of Contract and issuance of No Objection Letter on the Revised Bid Evaluation Report.

5. Package No. 6 Pasar Pedati – Kerkap AWP-2

This sub-project is under implementation schedule AWP-2. The project roadline is located in the Province of Bengkulu having an approximate length of 20.90 kilometer. The Contract Package is procured thru the National Competitive Bidding NCB using the method of e-procurement system of procuring the works. As mentioned in last month progress report, there were seven 7 applicant bidder who submitted their bids on December 29, 2014 and bids were opened on the same day. Six 6 bidders are sole entity contractors, while the other bidder is in joint venture with another contractor. The applicant bidders who submitted their bids are as follow :  PT. Multi Structure JO – PT. Rodate : Rp. 90,287,440,000  PT. Jaya Konstruksi, MP : Rp. 90,800,000,000  PT. Yasa Patria Perkasa : Rp. 90,850,000,000  PT. Hutama Karya Persero : Rp.109,292,800,000  PT. Bumi Karsa : Rp. 86,912,075,000  PT. Waskita Karya Persero : Rp. 86,517,470,600  PT. Istaka Karya Persero : Rp. 90,100,660,000 The lowest canvassed bid is submitted by PT. Waskita Karya Persero with an amount of ‘p. , , , hich is . elo the appro ed O er’s Esti ate of Rp. 92,097,356,000, while the 2 nd lowest bid is quoted by PT. Bumi Karsa with an amount of ‘p. ,9 , , or . 3 lo er tha the O ers’s Esti ate. Bid Evaluation Report is under preparation and finalization by POKJA and expected the winning bidder will be announced by PPK on February 8, 2015.

6. Package No.19 Lais – Bintunan AWP-3

This sub-project is under implementation schedule AWP-3. The project roadline is located in the Province of Bengkulu having an approximate length of 10.80 kilometers. The Contract Package is procured thru the National Competitive Bidding NCB using the method of e-procurement system of procuring the works. As originally scheduled pre-bid conferencemeeting and site visit pushed thru on December 5, 2014, however, the bid opening was reschedule from December 18, 2014 to December 29, 2014 in Bengkulu. Western Indonesia National Roads Improvement Project 6 As e tio ed i pre ious o th’s progress report, there were three 3 applicant contractors who submitted their bids on December 29, 2014 and bids were opened on the same day. All the three 3 bidders are sole entity Contractors. The applicant bidders who submitted their bids are as follows :  PT. Maras Bangun Persada : Rp. 32,929,110,000  PT. Rodatekindo Purajaya : Rp. 33,689,459,000  PT. Sumber Tratindo Utama : Rp. 31,758,052,000 The lowest canvassed bid is submitted by PT. Sumber Tratindo Utama with an amount of Rp. 31,758,052,000 which is 11.18 elo the appro ed O er’s Esti ate of Rp. 35,756,587,000, while the 2 nd lowest bid is submitted by PT. Maras Bangun Persada in the amount of Rp. 32,929,110,000 or 7.91 low er tha the O ers’s Estimate. Bid Evaluation Report is under preparation and finalization by POKJA and expected the winning bidder will be announced by PPK on February 8, 2015.

7. Package No.15 Sibolga – Batas Tapsel AWP-3

This sub-project is included in the implementation schedule AWP-3. The Project road is 36 kilometers long and located in the Province of Sumatera Utara. The Contract Package is procured thru post qualification criteria and International Competitive Bidding ICB method using the Full e-Procurement System. Invitation to Bid was published on January 9, 2015. Pre-bid conferencemeeting was held on January 26, 2015 in BALAI I Office in Medan followed by site visit a day after Barring any unforeseen circumstances that would disrupt the tendering period, submission and opening of bids are schedule on February 23, 2015 to be held at the same place where the per-bid meeting was conducted. Procurement of Other Civil Work Contract Package The present status of other Contract Packages which are scheduled to be put on tender soon are as follow : - Package No.7 Indrapura – Tapan AWP-2 - Package No.8 Bts. Kota Pariaman – Manggopoh AWP-2 - Package No.10 Sp. Empat – Sp. Air Balam AWP-2 - Package No.12 Kambang – Indrapura AWP-2 Associated bidding documents are under preparation and finalization by the Design Supervision Consultant DSC. Detailed Engineering Design DED dra i gs a d E gi eer’s Esti ates of the four su - projects had ee resu itted to World Ba k after i corporati g the Ba k’s co e ts i the 1 st submittal. As of this writing, No Objection Letter NOL from the World Bank still to be issued.