Package 17 Sp. Gunung Kemala – Pugung Tampak AWP-3.
5. Package No. 6 Pasar Pedati – Kerkap AWP-2
This sub-project is under implementation schedule AWP-2. The project roadline is located in the Province of Bengkulu having an approximate length of 20.90 kilometer. The Contract Package is procured thru the National Competitive Bidding NCB using the method of e-procurement system of procuring the works. As mentioned in last month progress report, there were seven 7 applicant bidder who submitted their bids on December 29, 2014 and bids were opened on the same day. Six 6 bidders are sole entity contractors, while the other bidder is in joint venture with another contractor. The applicant bidders who submitted their bids are as follow : PT. Multi Structure JO – PT. Rodate : Rp. 90,287,440,000 PT. Jaya Konstruksi, MP : Rp. 90,800,000,000 PT. Yasa Patria Perkasa : Rp. 90,850,000,000 PT. Hutama Karya Persero : Rp.109,292,800,000 PT. Bumi Karsa : Rp. 86,912,075,000 PT. Waskita Karya Persero : Rp. 86,517,470,600 PT. Istaka Karya Persero : Rp. 90,100,660,000 The lowest canvassed bid is submitted by PT. Waskita Karya Persero with an amount of ‘p. , , , hich is . elo the appro ed O er’s Esti ate of Rp. 92,097,356,000, while the 2 nd lowest bid is quoted by PT. Bumi Karsa with an amount of ‘p. ,9 , , or . 3 lo er tha the O ers’s Esti ate. Bid Evaluation Report is under preparation and finalization by POKJA and expected the winning bidder will be announced by PPK on February 8, 2015.6. Package No.19 Lais – Bintunan AWP-3
This sub-project is under implementation schedule AWP-3. The project roadline is located in the Province of Bengkulu having an approximate length of 10.80 kilometers. The Contract Package is procured thru the National Competitive Bidding NCB using the method of e-procurement system of procuring the works. As originally scheduled pre-bid conferencemeeting and site visit pushed thru on December 5, 2014, however, the bid opening was reschedule from December 18, 2014 to December 29, 2014 in Bengkulu.Parts
» WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» World Bank Implementation Review Mission and Site Visit
» Package 17 Sp. Gunung Kemala – Pugung Tampak AWP-3.
» Package 11 Bantal – Mukomuko AWP-2
» Package 13 Sp. Rukis – Tj. Kemuning AWP-2
» Packages 5 Simpang Rampa – Poriaha AWP-2
» Package No. 6 Pasar Pedati – Kerkap AWP-2 Package No.19 Lais – Bintunan AWP-3
» Package No.15 Sibolga – Batas Tapsel AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Project Development WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Project Objective CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Procurements WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 18.71 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 40.41 29.11 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» - 33.14 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 4 : Ipuh Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat
» Monitoring Report of the LARAP Package No. 11
» Monitoring Report of the LARAP Package No.16 : Seblat - Ipuh
» Monitoring Report of the LARAP Package No.17 : Sp. Gunung Kemala
» Monitoring Report of the LARAP Package No.18 : Mukomuko
» Monitoring Report of the LARAP Package No.19 : Lais - Bintunan
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» Management Information System WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» Project Risks and Mitigation Measures
» Current Situation Actions Required
» 2.38 II WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 1.20 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 28.83 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.97 IV WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.15 VI WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 1.28 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 21.90 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.09 VIII WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 2.64 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 67.46 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 5.62 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 18.06 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 31.58 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 46.36 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 60.68 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 74.81 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 83.98 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 91.27 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 96.16 100.00 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 3.71 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 5.98 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 11.28 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 16.08 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» -0.12 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» EXECUTI VE SUMMARY 5. WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 16.08 P WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 29.11 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» 15.814 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» -48.74 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
» -10.11 WINRIP DOC MPR CTC MPR No.25 2015 01 2015 01 12 00224.
Show more