MATERIAL USAGE

MATERIAL USAGE

The main material in production activity at UBP Gold Pongkor and UBP Nickel Southeast Sulawesi is minerals from mining. While the main material for production process at Logam Mulia Processing and Refinery Business Unit is dore bullion, which is obtained from the UBP Gold Pongkor. All materials are mostly used up, and there is only a small part of waste materials from production processes which is reused after being processed. The amount of materials used is presented in the tables and Logam Mulia Processing and Refinery Business Unit only has information for the year 2010 when the material usage started to be calculated. (EN1) (EN2)

For export purposes, the packaging is made from environmentally friendly material to load the ferronickel ore that will be shipped to the consumer. For shipments of nickel ore and bauxite ore is done in bulk system into a ship hold without using the packaging. During the year 2010 there were no claims on packaging. (EN27)

Kemampuan Pengembangan

Assurance Statement Referensi Silang Ekonomi

Keselamatan

Kebijakan Tanggung

Pengembangan

Sumberdaya

dan Kesehatan Kerja

Jawab Sosial

Masyarakat

(20110504) dengan Indikator

Economic Viability

Manusia

Occupational Safety

Social Responsibility

Community

GRI–G3.1, Suplemen

Human Resources

and Health

Policy

Development

Sektor Tambang dan

Development

ISO 26000

Cross Reference with GRI – G3.1 Indicators Supplement of Mining Sector and ISO 26000

Material yang Digunakan dalam Proses Produksi (EN1) Material Used in Production Process (EN1)

No Material yang Digunakan

Volume Material Used

Satuan

Unit

Tahun Year 2008

Tahun Year 2009 Tahun Year 2010

UBP Emas Pongkor UBP Gold Pongkor

348,733 335,675 2. NaCN

1. Bijih emas Gold ore

Wmt

522,450 522,625 3. Karbon aktif Active carbon

Kg

42,900 48,800 4. Timbal nitrat

Kg

42,275 40,975 5. Grinding ball

Lead nitrate

8. CuSO 4 Kg

566,300 422,716 10. NaOH padat Solid NaOH

Kg

203,400 142,600 11. Kapur mati

Kg

635,690 419,174 12. Ethylene glycol

Slake lime

Kg

2,925 3,825 13. Solar Diesel oil

Kg

617,887 532,672 14. Boraks Borax

Kg

3,824 7,050 15. Koagulan curah Bulk coagulant

Kg

105,793 132,664 16. Koagulan konsentrat Concentrate coagulant

UBP Sulawesi Tenggara UBP Nickel Southeast Sulawesi

802,166 1,595,170 2. Batubara

1. Bijih nikel Nickel ore

Wmt

164,702 3. Batu kapur Limestone

8,233 446 5. Kapur tohor

Unslake lime

UBPP Logam Mulia Logam Mulia Processing and Refinery Business Unit

1. Anode, Dore bullion

75,223 70,575 2. Klorine cair

Kg

8,100 7,200 3. HCl

Liquid chlorine

29,015 17,950 5. Bubuk besi Fe powder

1,550 3,050 7. Boraks Borax

Kg

4,000 3,250 8. Bubuk soda Sodium Carbonate

Kg

1,550 1,750 9. Garam teknis

Kg

Sodium Chlorida

Kg

DAUR ULANG MATERIAL

MATERIAL RECYCLING

Material yang digunakan kembali dalam proses produksi Materials that are reused in the production process at the UBP di UBP Emas Pongkor adalah sebagian sianida (CN) dalam

Gold Pongkor is partially cyanide (CN) in the form of sodium- bentuk natrium-sianida (NaCN) sisa proses sianidasi.

cyanide (NaCN) from cyanide process. The reuse of some of Pemanfaatan ulang sebagian NaCN dilakukan melalui

NaCN is done through the pumping process of some water proses pemompaan sebagian air di thickener unit ke

in the thickener unit to miling unit. Through this process miling unit. Melalui proses ini diperoleh 98.359 kg NaCN

daur ulang atau 18,8% dari total NaCN terpakai selama

www.antam.com ANTAM 2010 Sustainability Report

Rekaman Peristiwa Sambutan Dewan

Sambutan Direksi

Profil Antam

Pengantar Laporan

Tata Kelola Antam Tanggung

Card Record

Komisaris

Message from the

Our Profile

Keberlanjutan

Governance of Antam

Jawab Terhadap

Message from

Board of Directors

Sustainability Report

Lingkungan

Responsibility Towards Commissioners

the Board of

Introduction

Environment

tahun 2010. Jumlah ini naik dibanding banyaknya NaCN 98,359 kg of recycled NaCN is obtained or 18.8% of the total yang didaur ulang pada tahun 2009 sebesar 96.130,8 kg

NaCN used during the year 2010. This amount increased (18,4%). Hal ini terjadi karena sianida yang dikembalikan

compared to the amount of NaCN recycled in 2009 which ke sistem selama tahun 2010 memiliki konsentrasi yang

amounted to 96,130.8 kg (18.4%). This happened because lebih tinggi yakni 215 part per million (ppm), sedangkan

the cyanide returned to the system during 2010 had a higher pada tahun 2009 hanya 200 ppm. (EN2)

concentration of 215 part per million (ppm), whereas in 2009 only 200 ppm. (EN2)

Upaya daur ulang dan pemanfaatan kembali material dalam proses produksi, juga dilakukan di UBP Nikel

Efforts to recycle and reuse materials in the production Sulawesi Tenggara. Ada dua sumber utama limbah untuk

process, also conducted at UBP Nickel Southeast Sulawesi. proses pengolahan kembali. Pertama, 24.222 ton split

There are two main sources of waste for recycling process. metal hasil dari slag treatment dimasukkan ke dalam proses

First, 24,222 tons of split metal produced from the slag pengolahan, dan dari proses daur ulang ini dihasilkan

treatment is put into the processing, and this recycling material pengganti bijih nikel sebesar 8% atau 1.937,76

process produces material of substitute nickel ore as much as ton. Kedua, 12.165 ribu ton debu diolah menjadi pellet

8% or 1,937.76 tons. Secondly, 12,165 thousand tons of ash maupun campuran wet ore untuk dimasukkan kembali

is processed into pellets or a mixture of wet ore to put back ke dalam proses produksi, hingga dihasilkan material

into the production process, to produce materials of nickel pengganti bijih nikel sebanyak 2% atau 252,3 ton. (EN2)

ore substitute as much as 2% or 252.3 tons. (EN2) Di UBPP Logam Mulia, material daur ulang yang

At Logam Mulia Processing and Refinery Business Unit, dimanfaatkan kembali adalah garam yang diperoleh

recycled material that is reused is the salt that is obtained melalui proses pengolahan air limbah (penggaraman).

through the wastewater treatment process (salting). From Dari proses ini selama tahun 2010 diperoleh 160 kilogram

this process during 2010 160 kg of salt was obtained or 4.3% garam atau 4,3% dari jumlah keseluruhan garam yang

of the total salt needed. (EN2)

dibutuhkan. (EN2)

utilization฀and฀reCyCling฀of฀ PEMANFAATAN DAN DAUR ULANG AIR WATER

Sejalan dengan kebijakan

In line with the company’s environmental policy, optimal pemanfaatan air dilakukan secara optimal di semua unit

lingkungan

perusahaan,

utilization of water is implemented in all business units. bisnis yang ada. Pengolahan air limbah dilaksanakan

Waste water treatment is carried out with tight supervision melalui pengawasan ketat guna menjamin pemenuhan

to ensure compliance with quality standards according to standar baku mutu sesuai peraturan perundang-undangan.

the laws. This procedure also ensures that the processed Prosedur ini juga menjamin air limbah olahan yang dibuang

waste water disposed into water bodies does not exceed ke badan air tidak melampaui baku mutu yang telah

the quality standards that have been set and does not affect ditetapkan dan tidak mempengaruhi habitat/ekosistem dan

the habitat/ecosystem and biodiversity in it. Until the end of keanekaragaman hayati di dalamnya. Sampai akhir periode

the reporting period, Antam did not receive any complaints pelaporan, Antam tidak menerima pengaduan mengenai

about water bodies pollution and disturbance to habitat and terjadinya pencemaran di badan air maupun terganggunya

biodiversity. (EN25)

habitat beserta keanekaragamanan hayati. (EN25)

Utilization, Recycling and Disposal of Water at Pemanfaatan, Daur Ulang dan Pembuangan Air

UBP Gold Pongkor

Di UBP Emas Pongkor

UBP Gold Pongkor continues the Company’s policy to stop UBP Emas Pongkor terus melanjutkan kebijakan Perusahaan

the utilization of water resources in the environment, untuk tidak lagi memanfaatkan sumber air di lingkungan,

both surface water and ground water sources for mining baik sumber air permukaan maupun air tanah untuk

operations and production purposes. The ground water is keperluan operasi tambang dan produksi. Pemanfaatan

Laporan Keberlanjutan ANTAM 2010 www.antam.com

Kemampuan Pengembangan

Assurance Statement Referensi Silang Ekonomi

Keselamatan

Kebijakan Tanggung

Pengembangan

Sumberdaya

dan Kesehatan Kerja

Jawab Sosial

Masyarakat

(20110504) dengan Indikator

Economic Viability

Manusia

Occupational Safety

Social Responsibility

Community

GRI–G3.1, Suplemen

Human Resources

and Health

Policy

Development

Sektor Tambang dan

Development

ISO 26000

Cross Reference with GRI – G3.1 Indicators Supplement of Mining Sector and ISO 26000

air tanah hanya untuk memenuhi kebutuhan domestik, only utilized to meet domestic demand, which is processed yakni diolah menjadi air minum dan air bersih. Jumlah air

into drinking water and clean water. The amount of tanah yang dimanfaatkan selama tahun 2010 mencapai

groundwater that is used during 2010 reached 17,887 cubic 17.887 meter kubik (m 3 ), naik dibanding tahun 2009 yang

meters (m 3 ), an increase compared to utilization in 2009 hanya 11.684 m 3 . Peningkatan ini disebabkan karena

that was only 11,684 m 3 . The increase was due to additional terjadi penambahan jumlah tenaga kerja sumber luar

number of outsourced workers from 1,194 people in 2009 to (outsourcing), dari 1.194 orang pada tahun 2009 menjadi

1,488 workers in 2010. (EN8)

1.488 pekerja di tahun 2010. (EN8) Important notes related to water utilization data for internal Catatan penting terkait data pemanfaatan air untuk

purposes at the UBP Gold Pongkor are data changes that keperluan internal di UBP Pongkor adalah perubahan data

were previously presented in the 2008 and 2009 Sustainability yang sebelumnya tersaji dalam Laporan Keberlanjutan 2008

Reports and restatement. Changes in water usage data were dan 2009 dan pengulangan pernyataan yang mengikutinya

done due to a more accurate recording. (restatement). Perubahan data penggunaan air dilakukan karena adanya pencatatan data yang lebih akurat.

Utilization of ground water through drilled well is done with tight supervision, particularly monitoring of the impact on

Pemanfaatan air tanah melalui sumur bor dilakukan water resources around the UBP Gold Pongkor. Meanwhile, dengan pengawasan ketat, terutama pemantauan atas

the use of dug wells as water sources has been halted since dampak terhadap sumber air di sekitar UBP Emas Pongkor.

February 2010. Until the end of the reporting period no Sementara itu penggunaan sumur gali sebagai sumber

complaints or reports of the affected water sources, both air mulai dihentikan sejak Februari 2010. Sampai akhir

natural and water resources belonging to the people in the periode pelaporan tidak ada keluhan maupun laporan

vicinity of UBP Gold Pongkor location. (EN9) mengenai sumber air yang terpengaruh, baik sumber air alami maupun milik penduduk di sekitar lokasi UBP Emas Pongkor. (EN9)

Pengambilan Air Untuk Keperluan Internal (EN8)

Water Taking for Internal Usage (EN8)

Volume Pengambilan Taking Volume Nama Inlet

Kapasitas (m 3 /tahun m 3 /year) Name of Inlet

Jenis Sumber

Type of Source

Capacity

Tahun Year 2009 Tahun Year 2010 Inlet 1

Tahun Year 2008

11,536 17,807 Inlet 2

Sumur bor Drilled well

75 m 3 /hari (day)

144 80 Jumlah Total

Sumur gali Dug well

10 m 3 /hari (day)

Pemanfaatan air yang digunakan untuk operasional tambang The water utilization for mining and production operations dan produksi dipenuhi dari proses daur ulang. Total jumlah

purposes is fulfilled by recycling process. Total amount of air yang didaur ulang pada tahun 2010 mencapai 4.608.471

recycled water in 2010 reached 4,608,471 m 3 . The amount m 3 . Jumlah ini turun dibanding volume air yang didaur

decreased from recycled water volume in 2009 of 5,683,000

m3. The recycled water obtained from mining operation ulang diperoleh dari proses operasi tambang (mine recycle)

ulang selama tahun 2009 sebesar 5.683.000 m 3 . Air daur

process (mine recycle) was 4,2990,808 m 3 and from 4.290.808 m 3 dan dari pabrik produksi/pengolahan bijih emas

production plant/processing of gold ore (plant recycle) was (plant recycle) 317.663 m 3 . (EN10)

317,663 m 3 . (EN10)

www.antam.com ANTAM 2010 Sustainability Report

Rekaman Peristiwa Sambutan Dewan

Sambutan Direksi

Profil Antam

Pengantar Laporan

Tata Kelola Antam Tanggung

Card Record

Komisaris

Message from the

Our Profile

Keberlanjutan

Governance of Antam

Jawab Terhadap

Message from

Board of Directors

Sustainability Report

Lingkungan

the Board of

Responsibility Towards Commissioners

Introduction

Environment

Pemanfaatan Daur Ulang Air Limbah untuk Produksi (EN10) Utilization of Recycled Waste Water for Production (EN10)

Volume Asal Air

(ribu m 3 thousand m 3 ) Water Source

Tahun Year Tahun Year

2009 2010 Air dari IPAL tambang

5,418 4,290 Water from IPAL mine

m 3 Air bahan baku pabrik, air backfilling, dan air

pemboran tambang Plant raw material water, backfilling water, and mine drilling water

Air limbah tailing pabrik

265 317 Plant tailing waste water

m 3 Air limbah tailing ke pabrik sebagai air proses

Tailing waste water to the plant as

processed water

Jumlah Total 5,018

UBP Emas Pongkor mempunyai dua unit Instalasi Pengolahan UBP Gold Pongkor has two Waste water Treatment Air Limbah (IPAL), yakni IPAL Tambang dan IPAL Cikaret.

Installations (IPAL), namely IPAL Tambang and IPAL Cikaret. Melalui unit IPAL ini, air limbah dari proses produksi dan

Through these IPAL units, waste water from production pabrik pengolahan terlebih dulu diolah sebelum digunakan

process and processing plant are processed before being kembali atau dibuang ke badan air. Dari hasil pemantauan

reused or disposed to water bodies. From observation during selama 2010 diketahui, air limbah yang diolah telah

2010, processed waste water has met the requirement of memenuhi persyaratan peruntukan air dan baku mutu yang

water purpose and quality set by local government and can ditentukan pemerintah daerah setempat, sehingga layak

be disposed to water bodies. (EN21) untuk dibuang ke badan air. (EN21)

Pembuangan Limbah Cair ke Badan Air (Sungai Cikaniki) (EN21) Liquid Waste Disposal to Water Body (Cikaniki River) (EN21)

Volume

thousand m 3 /year) Name of Outlet m /year

Nama Outlet m 3

/tahun

Kategori Badan Air*

(ribu m /tahun

Category of Water Body

Tahun Year 2009 Tahun Year 2010 IPAL Tambang

Tahun Year 2008

1,677 Mine Waste Water Treatment

IPAL Cikaret

1,204 Cikaret Waste Water Treatment

2,881 * Peruntukan badan air berdasarkan Keputusan Gubernur Kepala Daerah

Jumlah Total

Tingkat I Provinsi Jawa Barat No.38 Tahun 1991 tentang Peruntukan Air dan Baku Mutu Air pada Sumber Air di Jawa Barat. Water body category is based on the West Java Governor Decree No.38/1991 on Water Quality Standard of Water Resources in West Java.

Pemakaian, Daur Ulang dan Pembuangan Air di Usage, Recycling and Disposal of Water at UBP UBP Nikel Sulawesi Tenggara

Nickel Southeast Sulawesi

Hingga saat ini kebutuhan air di UBP Nikel Sulawesi Tenggara The water needs at UBP Nickel Southeast Sulawesi up until masih berasal dari air permukaan, yakni dari sungai di sekitar lokasi

now are originated from surface water of rivers around tambang dan pabrik pengolahan. Total air yang dimanfaatkan

the mine and processing plant. Total water utilized in 2010

selama tahun 2010 mencapai 7.609.000 m 3 , naik dibandingkan

reached 7,609,000 m 3 , increased from water usage in 2009 of

7,281,000 m 3 . The utilization of river as water source is done sungai sebagai sumber air dilakukan dengan pengawasan

pemakaian air tahun 2009 sebesar 7.281.000 m 3 . Pemanfaatan

Laporan Keberlanjutan ANTAM 2010 www.antam.com

Kemampuan Pengembangan

Assurance Statement Referensi Silang Ekonomi

Keselamatan

Kebijakan Tanggung

Pengembangan

Sumberdaya

dan Kesehatan Kerja

Jawab Sosial

Masyarakat

(20110504) dengan Indikator

Economic Viability

Manusia

Occupational Safety

Social Responsibility

Community

GRI–G3.1, Suplemen

Human Resources

and Health

Policy

Development

Sektor Tambang dan

Development

ISO 26000

Cross Reference with GRI – G3.1 Indicators Supplement of Mining Sector and ISO 26000

ketat, sehingga selama tahun 2010 tidak ada pengaduan dari with tight supervision, so there were no reports from people masyarakat terkait terganggunya sumber air di sekitar lokasi

regarding disturbance to water sources around the mine and tambang maupun pabrik pengolahan. (EN8) (EN9)

processing plant. (EN8) (EN9)

Volume Pengambilan Air di UBP Nikel Sulawesi Tenggara (EN8)

Total Water Taking at UBP Nickel at Southeast Sulawesi (EN8

Volume (ribu m 3 /tahun thousand m Nama Inlet 3 /year) Name of Inlet

Sumber Air

Water Source

Keperluan

Tahun Year 2009 Tahun Year 2010 Kumoro

Purpose

Tahun Year 2008

920 1,314 Huko-huko

Sungai River

Internal

6,361 6,295 Jumlah Total

Sungai River

Produksi Production

UBP Nikel Sulawesi Tenggara dilengkapi dua kolam UBP Nickel Southeast Sulawesi has two storage and penampungan dan resirkulasi untuk menampung dan

recirculation ponds to accommodate and treat waste water mengolah air limbah dari pabrik pengolahan dan proses

from the processing plant and the slag cooling process. Some pendinginan slag. Air hasil olahan sebagian digunakan

of the processed water is reused for production activities, to kembali untuk kegiatan produksi, sehingga mencegah

prevent excessive water taking from the river. From the two pengambilan air dari sungai secara berlebihan. Melalui

ponds, there was 22,011,000 m 3 of recycled water in 2010, keberadaan kedua kolam ini, selama tahun 2010 terdapat

increased from 2009 volume of which is 6,662,000 m 3 . The 22.011.000 m 3 air daur ulang, naik jumlahnya dibanding

increase of recycled water was due to optimum production

activities in 2010, both at FeNi smelter 1, 2 and 3. This adds ulang ini disebabkan karena pada tahun 2010 kegiatan

tahun 2009 yakni 6.662.000 m 3 . Peningkatan air daur

to the production of ferronickel by 49% compared to the produksi berlangsung optimum, baik di pabrik FeNi 1, 2

previous year. (EN10)

maupun 3. Hal ini menambah produksi feronikel sebesar 49% dibanding tahun sebelumnya. (EN10)

In addition, there are four units of erosion and sedimentation control structures (check dam) to dispose waste water into the

Selain itu, ada empat unit bangunan pengendali erosi sea, and two units of check dam to dispose waste water into dan sedimentasi (cek dam) untuk pembuangan air limbah

rivers. The existence of these six units check dam also become ke laut, dan dua unit cek dam untuk pembuangan air

part of Antam’s efforts to ensure that waste water disposed limbah ke sungai. Keberadaan enam unit cek dam ini

into water bodies (rivers and sea), has met quality standards juga menjadi bagian dari upaya Antam untuk menjamin

set by the government. This ensures that no habitat and its air limbah yang dibuang ke badan air (sungai dan

biodiversity are disturbed. (EN21) (EN25) laut), sudah memenuhi baku mutu yang ditetapkan pemerintah. Dengan demikian dipastikan tidak ada habitat maupun keanekaragaman hayati di dalamnya yang terganggu. (EN21) (EN25)

Pembuangan Limbah Cair dari Hasil Pengolahan (EN21) Liquid Waste Disposal from Processing (EN21)

Volume

Nama Outlet

Tujuan Pembuangan Disposal Destination

(ribu m Name of Outlet 3 /Tahun thousand m 3 /Year)

Tahun Year 2009 Tahun Year 2010 Cek Dam Bea Cukai

Tahun Year 2008

11,037 Check Dam Bea Cukai

Kolam resirkulasi

Resirculation Pond

10,974 Jumlah Total

Laut Sea

www.antam.com ANTAM 2010 Sustainability Report

Rekaman Peristiwa Sambutan Dewan

Sambutan Direksi

Profil Antam

Pengantar Laporan

Tata Kelola Antam Tanggung

Card Record

Komisaris

Message from the

Our Profile

Keberlanjutan

Governance of Antam

Jawab Terhadap

Message from

Board of Directors

Sustainability Report

Lingkungan

Responsibility Towards Commissioners

the Board of

Introduction

Environment

Pemakaian, Daur Ulang dan Pembuangan Air di Usage, Recycling and Disposal of Water at Logam UBPP Logam Mulia

Mulia Processing and Refinery Business Unit

Kebutuhan air di UBPP Logam Mulia diperoleh dari dua Water needs at Logam Mulia Processing and Refinery Business sumber utama, yakni pemanfaatan air tanah dan dari

Unit obtained from two main sources, the utilization of perusahaan air minum (PAM). Mulai tahun 2010, penggunaan

ground water and drinking water company (PAM). Starting air PAM dioptimalkan untuk meningkatkan kontrol jumlah

2010, the use of PAM water has been optimized to intensify pemakaian air. Total jumlah air yang digunakan selama

control on water usage volume. The total volume of water

used during 2010 reached 15,314 m 3 , a decrease compared 2009 sebesar 20.945 m 3 . Penurunan ini disebabkan sebagian

tahun 2010 mencapai 15.314 m 3 , turun dibanding tahun

to the volume in 2009 which reached 20,945 m 3 . This decrease air untuk keperluan proses produksi menggunakan kembali

was due in part to reuse of the waste water treatment hasil pengolahan air limbah. Namun demikian, UBPP

outcome for production processes. However, Logam Mulia Logam Mulia belum melakukan pengukuran volume hasil

Processing and Refinery Business Unit has yet to calculate pengolahan air limbah, karena alat pengukur (flow meter)

the volume of waste water treatment outcome, because the baru terpasang pada bulan November 2010. (EN8) (EN10)

measuring device (flow meter) was only recently installed in November 2010. (EN8) (EN10)

Pengambilan Air Untuk Keperluan Internal di UBPP Logam Water Taking for Internal Usage at Logam Mulia Processing Mulia (EN8)

and Refinery Business Unit (EN8)

Volume Pengambilan Taking Volume Nama Inlet

(m 3 /tahun m 3 /year) Name of Inlet

Jenis Sumber

Type of Source

Tahun Year 2010 Inlet 1

Tahun Year 2009

Sumur bor

Drilled well

Munipicial water supply

Jumlah Total