Design Integration, Road Safety Aspects and Monitoring of Environmental Studies

Western I ndonesia National Roads I mprovement Project 4-10 C. Update during this reporting month of January 2015 b Monitoring Report concerning Letter of confirmation from Local Government about 1 PAP which no be found in the site still to be prepared for submission to World Bank.

4. Monitoring Report of the LARAP Package No. 4

: Ipuh Bantal Province : Bengkulu A. Previous Status : • LARAP documents approved by World Bank on December 10, 2012 • Monitoring Report for payments for 157 affected persons out of the 227 Project Affected Persons was submitted by PMU to World Bank on December 24, 2013 • Monitoring Report for the compensation of the remaining 70 affected persons was submitted by PMU to the World Bank on February 28, 2014. • World Bank sent letter to PMU on March 5, 2014 informing that the Bank have no further comment on the Monitoring Report. B. Pending Issues, Concern and Actions a Completed. C. Update during this reporting month of February 2015 a On-going construction. b Monitoring Report for the compensation payments of additional 34 PAP already be submitted to the World Bank dated February 6, 2015

5. Monitoring Report of the LARAP Package No. 5

: Sp. Rampa Poriaha Province : Sumatera Utara A. Previous Status : • World Bank accepted the revised LARAP documents and issued No Objection Letter on November 12, 2013. • On November 18, 2013 the Director of Planning issued a letter to the Director of Implementation Affairs Region 1, that the LARAP documents can now be implemented in the acquisition of Right of Ways and removal of construction obstructions. B. Pending Issues, Concern and Actions c PMU waiting report of the completed relocation of the kiosk from Satker. C. Update during this reporting month of February 2015 a Monitoring Report for the concerning the completed relocation of the kiosk still to be prepared for submission to World Bank.

6. Monitoring Report of the LARAP Package No. 6

: Pasar Pedati - Kerkap Province : Bengkulu A. Previous Status : • PMU resubmitted to the World Bank on January 9, 2014 the revised LARAP documents and was resubmitted again on May 21, 2014 due to some minor corrections.