Packages 5 Simpang Rampa Poriaha AWP-2

Western I ndonesia National Roads I mprovement Project 1-6 Bid Evaluation Report has been finalized and announcement of winner by POKJA was made on February 13, 2015. As no complain from the non-winning bidders was received during the complaint period, PPK issued letter of acceptance to award the contract to the lowest responsive bidder, PT. Waskita Karya. It is expected that contract signing will be executed during the 1 st week of March 2015.

6. Package No.19 Lais Bintunan AWP-3

This sub-project is under implementation schedule AWP-3. The project roadline is located in the Province of Bengkulu having an approximate length of 10.80 kilometers. The Contract Package is procured thru the National Competitive Bidding NCB using the method of e-procurement system of procuring the works. As mentioned in previous monthly progress report, there were three 3 applicant contractors who submitted their bids on December 29, 2014 and bids were opened on the same day. All the three 3 bidders are sole entity Contractors. The applicant bidders who submitted their bids are as follows : • PT. Maras Bangun Persada : Rp. 32,929,110,000 • PT. Rodatekindo Purajaya : Rp. 33,689,459,000 • PT. Sumber Tratindo Utama : Rp. 31,758,052,000 The lowest canvassed bid is submitted by PT. Sumber Tratindo Utama with an amount of Rp. 31,758,052,000 which is 11.18 below the approved Owner s Estimate of Rp. 35,756,587,000, while the 2 nd lowest bid is submitted by PT. Maras Bangun Persada in the amount of Rp. 32,929,110,000 or 7.91 lower than the Owners s Estimate. Bid Evaluation Report has been finalized and announcement of winner by POKJA was made on February 13, 2015. Based on the Bid Evaluation Report BER and post-review of the qualification of the 1 st and 2 nd lowest bidders, both failed to quality due to lack of related work experience and failed to met the minimum required financial resources. As no complain from the two 2 disqualified bidders was received during the complain period, PPK issued letter of acceptance on February 23, 2015 to POKJA s recommendation to award the contract to the 3 rd lowest responsive bidder, PT. Rodatekindo Purajaya. It is expected that contract signing will be executed during the 1 st week of March 2015.

7. Package No.15 Sibolga Batas Tapsel AWP-3

This sub-project is included in the implementation schedule AWP-3. The Project road is 36 kilometers long and located in the Province of Sumatera Utara. The Contract Package is procured thru post qualification criteria and International Competitive Bidding ICB method using the Full e-Procurement System. As originally scheduled, bids were submitted on February 23, 2015 and bids were opened at 10:15 a.m, on the same day at BALAI I Office in Medan. Western I ndonesia National Roads I mprovement Project 1-7 There were nine 9 applicant bidder ; seven 7 sole entity and two 2 joint venture contractors who submitted bids. Following are Contractor bidders who submitted their bids with their respective bid prices as read out during the opening : • PT. Bangun Cipta Kontraktor : Rp. 303,596,654,817 • PT. Yasa Patria Perkasa PT. Conbloc Infratecno, JO : Rp. 305,575,900,000 • PT. Mawatindo Road Construction : Rp. 340,675,157,000 • PT. Adhi Karya Persero, Tbk : Rp. 291,500,000,000 • PT. Pembangunan Perumahan Persero : Rp. 260,100,000,000 • PT. Multi Structure : Rp. 265,804,568,624 • PT. Hutama Karya Persero : Rp. 350,486,000,000 • PT. Waskita Karya Persero : Rp. 291.446.247.000 • PT. Nindya Karya Jaya Konstruksi, JO : Rp. 272,000,000,000 The 1 st lowest is offered by PT. Pembangunan Perumahan Persero in the amount of Rp.260,100,000,000 which is 28.61 below the approved Owner s Estimated of Rp.364,330,559,000 and the 2 nd lowest tender is submitted by PT. Multi Structure with the amount of Rp.265,804,568,624 or 27.04 lower than the Owner s Estimate. Bid Evaluation Reports BER is on going preparation by POKJA and the Report is expected to be finalized on March 17, 2015. Procurement of Other Civil Work Contract Package The present status of other Contract Packages which are scheduled to be put on tender soon are as follow : - Package No.7 Indrapura Tapan AWP-2 - Package No.8 Bts. Kota Pariaman Manggopoh AWP-2 - Package No.10 Sp. Empat Sp. Air Balam AWP-2 - Package No.12 Kambang Indrapura AWP-2 Associated bidding documents are under preparation and finalization by the Design Supervision Consultant DSC. Detailed Engineering Design DED drawings and Engineer s Estimates of the four 4 sub- projects are under final revision by incorporating Bank s final comments based on February 10, 2015 letter.. As of this writing, the Revised Drawings and Engineer s Estimate are still to be completed for resubmission to the World Bank for issuance of No Objection Letter NOL. Status of the last four 4 remaining contract packages which are scheduled for procurement during the last half of the Year 2015 are as follows : - Package No.14 Painan - Kambang AWP-3 - Package No.16 Seblat - Ipuh AWP-3 - Package No.20 Lubuk Alung - Sicincin AWP-3 - Package No.21 Lubuk Alung - Kuraitaji AWP-3