84.21 100.00 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.

MONTH : Package No. Time Elapsed Days 415 Name Time Elapsed 56.85 Project Manager Scheduled Progress 58.67 Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress 30.11 - Shotage of dumptruck Supervision Consultant Balance -28.56 Commencement Date Progress This Month 1.00 Take Over Date Time for Complation Days 730 Addendum-1 Status date Contract Amount Rp. Accumulative Rp. 23.31 Contract Amount Add-1 + PPN Include advance payment Comp Accum Actual Accum Accum Total Last this to this Sch to this Month Month Month Month I G e n e r a l

10.21 1.63

- 1.63 5.01 II D r a i n a g e

13.17 6.44

0.15 6.29

12.49 III Earthworks 3.04

4.64 1.44

3.20 3.04

IV Pavement Widening Shoulders

2.45 -

V Granular Pavement

11.27 5.68

1.36 7.04

7.44 VI Asphalt Pavement 55.81

7.61 1.18

8.79 29.07

VII S t r u c t u r e s 0.80

2.31 0.01

2.32 0.80

VIII Reinstatement Minor Works

2.27 0.19

- 0.19 0.14 IX Day Work 0.22

0.10 -

0.10 0.13

X Routine Maintenance Works

0.76 0.51

0.04 0.55

0.55 TOTAL

100.00 29.11

1.00 30.11

58.67 Note : Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original 0.26 1.00 1.67 2.45 4.78 7.45 10.70 14.27 21.53 30.10 36.95 44.01 51.62 58.67 65.63 73.03 79.97 87.04 91.61 93.19 94.30 95.76 97.82 100.00 Actual Progress 0.24 0.48 2.07 2.43 2.87 5.45 5.70 7.01 12.43 14.45 19.30 24.38 29.11 30.11 Balance 0.02 0.52 0.40 0.02 1.91 2.00 5.00 7.26 9.10 15.65 17.65 19.63 22.51 28.56 0.24 1.59 0.36 0.44 2.58 0.25 1.31 5.42 2.02 4.85 5.08 4.73 1.00 in several days due to misinterpretation of regulation - Field Eng Technical justification of variant order PHYSICAL PROGRESS MONITORING TABLE 143,688,963,000.00 not finilzed yet PHYSICAL WORK PROGRESS BY CATEGORY Div Description RENARDET S.A JV - Insuffisient supply of agregate for base course Need additional dumptruck DISBURSEMENT 6-Jan-14 asphalt concrete 5-Jan-16 - Shortage of labor for drainage work Need additional team work Need additional dumptruck EXECUTIVE SUMMARY REPORT Feb- 15 PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS 2014 2015 31-Dec-14 33,493,661,044.00 03 TI M E February 25, 2015 MANGGOPOH - PADANG SAWAH MAJOR PROBLEMS ACTION TO BE TAKEN - Contractors basecamp was closed by loccal gov. AM OU NT - AMP often broken Need improvement of equipment management 10 20 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 PH YS IC AL P RO GR ES THE MONTH OF TIME FOR COMPLATION PROGRESS SCHEDULE PACKAGE 03 Schedule Actual EXECUTIVE SUMMARY REPORT Feb 2015_2230FF.xlsx ExSum P-3 MONTH : Package No. Time Elapsed Days 411 Name Time Elapsed 56.30 Project Manager Scheduled Progress 55.61 Contractor PT WASKITA KARYA - PT DAYA JO Actual Overall Progress 21.76 Supervision Consultant Balance -33.85 Commencement Date Progress This Month 7.97 Take Over Date Time for Complation Days 730 Addendum-1 Status date Contract Amount Rp. Accumulative Rp. 15.67 Contract Amount Add-1 + PPN Include advance payment Comp Accum Actual Accum Accum Total Last this to this Sch to this Month Month Month Month I G e n e r a l

7.59 0.61

0.01 0.62

0.62 II D r a i n a g e

12.26 1.03

0.66 1.69

9.76 III Earthworks 3.58

0.54 0.31

0.85 3.13

IV Pavement Widening Shoulders

3.39 -

- - V Granular Pavement

18.07 8.04

0.65 8.69

12.69 VI Asphalt Pavement 49.27

2.74 5.95

8.70 24.30

VII S t r u c t u r e s 2.55

0.61 0.34

0.95 2.42

VIII Reinstatement Minor Works

2.95 0.12

0.04 0.17

1.71 IX Day Work 0.14 - - 0.06 X Routine Maintenance Works

0.20 0.09

0.01 0.10

0.16 TOTAL

100.00 13.79

7.97 21.76

54.85 Note : Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original 0.11 0.32 0.75 1.14 6.57 10.29 12.85 15.81 20.08 24.22 32.76 40.88 47.93 55.61 63.45 70.19 77.04 81.55 84.79 90.84 94.62 97.05 98.80 100.00 Actual Progress - 0.18 0.40 0.53 0.56 0.78 0.87 1.45 3.73 5.35 8.10 9.35 13.79 21.76 Balance 0.11 0.14 0.35 0.61 6.01 9.51 11.98 14.36 16.35 18.88 24.66 31.53 34.14 33.85 0.22 0.13 0.03 0.22 0.09 0.58 2.27 1.62 2.76 1.25 4.44 7.97 186,936,750,000.00 PHYSICAL PROGRESS MONITORING TABLE PHYSICAL WORK PROGRESS BY CATEGORY Div Description DISBURSEMENT 31-Dec-14 29,301,697,422.00 10-Jan-14 9-Jan-16 EXECUTIVE SUMMARY REPORT Feb- 15 PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS 2014 2015 04 TI M E February 25, 2015 IPUH - BANTAL MAJOR PROBLEMS ACTION TO BE TAKEN ENDRO KUSUMOJOYO, ST.MT AM OU NT - Field Eng Technical justification of variant order not finilzed yet RENARDET S.A JV 10 20 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 PH YS IC AL P RO GR ES THE MONTH OF TIME FOR COMPLATION PROGRESS SCHEDULE PACKAGE 04 Schedule Actual EXECUTIVE SUMMARY REPORT Feb 2015_2230FF.xlsx ExSum P-4