24.30 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
21.04 -14.27
On - Going Construction 1.A2 6-Jan-14 5-Jan-16 2. Pd. Sawah-Sp. Empat PT.Jaya Konstruksi 17,250,183.32 56.1342.25 -11.88
On - Going Construction 1.A3 6-Jan-14 5-Jan-16 3. Manggopoh-Pd. Sawah PT. Jaya Konstruksi 12,522,493.13 58.6730.11 -28.56
On - Going Construction 1.A4 10-Jan-14 9-Jan-16 4. Ipuh-Bantal PT. Waskita Karya 16,291,537.76 55.6121.76 -33.85
On - Going Construction 1.B AWP-2 and AWP-3 ICB NCB DGH 227,100,000.00 58,554,513.73 17. Sp. Gunung Kemala - Pg. Tampak PT. Jaya Konstruksi 16,335,263.93 Form 384 issued by World Bank, for issuance of NTP 11. Bantal - Mukomuko PT. Hutama Karya 18,765,198.80 Form 384 issued by World Bank, for issuance of NTP 13. Sp. Rukis - Tj. Kemuning PT. Waskita Karya 23,454,051.00 Form 384 issued by World Bank, for issuance of NTP 1 Packages: BER with NOL. Contract signing still to be executed 2 Packages: Bid Evaluation Report BER on going Finalization 1 Packages: On tendering period 4 Packages: DED drawings a waiting issuance of No Objection Letter NOL from World Bank 4 Packages: DED drawings on-going final review by BALAI II 2 Packages: Proposed to be deleted 1.C Contingency - DGH 6,170,000.00 2 Implementation Support 16,000,000.00 2.A Core Team Consultants CTC QCBS DGH 6-Nov-12 15-Feb-16 PT. Perentjana Djaja 556 5,000,000.00 1,276,700.00 1,315,925.00 1,371,925.00 212.95 187.95 25.00 Supporting PMU. Joint Venture with Rp21,415,400,000.00 Rp22,426,175,000 Rp22,458,676,500 Yongma Engineering Co.Ltd. Or US equivalent total : 25-Oct-13 3-Sep-14 PT. Epadascon Permata 3,512,681.91 3,641,077.48 2.B Design Superv. Consultants QCBS DGH 19-Jun-13 18-Nov-16 Renardet S.A. 1,068 10,000,000.00 820,600.00 42.33 36.33 -6.00 Design preparation package 7, 8, 10 and 12. Joint Venture with Rp51,818,705,000.00 PT Cipta Strada Or US equivalent total : PT. Daya Creasi Mitrayasa 6,465,729.72 PT. Seecons PT. Yodya Karya 2.C Incremental Operating Cost Varies PMU 1,000,000.00 Including Technical Audits 3 Road Sector Institutional 1,000,000.00 Development 3.A Capacity Building for NCB DGH 1,000,000.00 TOR has been finalized Disaster Risks Reduction 4 Contingency for Disaster DGH - Risk Response 5 Unallocated DGH 18,100,000.00 Total 343,830,000.00 126,354,477.31 PROGRESS Respon- sibility Contract ValueBudget Total WB + GOI Revised Excl. VAT Appendix - A OVERALL PROGRESS STATUS Description WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP IBRD LOAN No. 8043-ID Proc. Method Category Planned Actual BalanceParts
» WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» World Bank Implementation Review Mission and Site Visit
» Package 17 Sp. Gunung Kemala Pugung Tampak AWP-3.
» Package 11 Bantal Mukomuko AWP-2
» Package 13 Sp. Rukis Tj. Kemuning AWP-2
» Packages 5 Simpang Rampa Poriaha AWP-2
» Package No. 6 Pasar Pedati Kerkap AWP-2
» Package No.19 Lais Bintunan AWP-3 Package No.15 Sibolga Batas Tapsel AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 21.04 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 44.25 30.11 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» - 33.85 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» External Monitoring Report SatkerPPK to BLH for Implementation of
» Monitoring Report of the LARAP Package No. 2 Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7 Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No. 15 : Sibolga Bts. Tapsel
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» System Design Management Information System
» Project Risks and Mitigation Measures
» 0.29 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 1.82 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 2.88 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.65 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 3.00 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.94 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 2.20 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 4.86 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 2.16 1.91 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 35.31 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 47.72 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 65.59 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 84.21 100.00 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 4.69 2.95 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 3.530 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 3.95 - WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 1.06 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 7.877 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 1.77 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 20.359 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.96 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 44.25 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.61 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 1.03 - WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 8.04 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 5.95 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 24.30 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.12 21.76 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» -14.27 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» -11.88 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.