Monitoring Report of the LARAP Package No. 10 : Sp. Empat Sp. Air Balam
16. Monitoring Report of the LARAP Package No.16
: Seblat - Ipuh Province : Bengkulu A. Previous Status : • PMU resubmitted to the World Bank on January 9, 2014 the revised LARAP documents and was resubmitted again on May 21, 2014 due to some minor corrections. • World Bank issued on May 30,2014 a No Objection Letter NOL on the revised LARAP documents for implementation. B. Pending Issues, Concern and Actions a Monitoring Reports of the LARAP s implementation for the remaining 311 PAP out of 450 PAP have to be prepared and submitted for review and for submission to World Bank. b LARAP Implementation is underway for the remaining 311 PAP be allocated 2015 national budget C. Update during this reporting month of February 2015 a Monitoring Reports of the LARAP s implementation for the remaining 311 PAP out of 450 PAP already submitted to World Bank dated February 6, 2015.17. Monitoring Report of the LARAP Package No.17
: Sp. Gunung Kemala Pg. Tampak Province : Lampung A. Previous Status : • CTC revised the LARAP documents taking into consideration all the Bank s comments and PMU resubmitted the documents to the World Bank on November 6, 2013 • World Bank approved the corrected LARAP documents on November 12, 2013 • Director of Planning issued letter on November 18, 2013 to the Director of Implementation Affairs to inform that World Bank had already approved the LARAP documents for implementation by the land acquisition committee. B. Pending Issues, Concern and Actions a PMU waiting report of the land acquisition progress result from Satker. C. Update during this reporting month of February 2015 a Appraisal of affected assets buildings, houses, plant and other obstructions by Independent Appraisal Team is on-going.18. Monitoring Report of the LARAP Package No.18
: Mukomuko Bts. Sumbar Province : Bengkulu A. Previous Status : • Proposed to be replaced. B. Pending Issues, Concern and Actions a Proposed to be replaced. C. Update during this reporting month of February 2015Parts
» WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» World Bank Implementation Review Mission and Site Visit
» Package 17 Sp. Gunung Kemala Pugung Tampak AWP-3.
» Package 11 Bantal Mukomuko AWP-2
» Package 13 Sp. Rukis Tj. Kemuning AWP-2
» Packages 5 Simpang Rampa Poriaha AWP-2
» Package No. 6 Pasar Pedati Kerkap AWP-2
» Package No.19 Lais Bintunan AWP-3 Package No.15 Sibolga Batas Tapsel AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 21.04 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 44.25 30.11 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» - 33.85 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» External Monitoring Report SatkerPPK to BLH for Implementation of
» Monitoring Report of the LARAP Package No. 2 Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7 Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No. 15 : Sibolga Bts. Tapsel
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» System Design Management Information System
» Project Risks and Mitigation Measures
» 0.29 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 1.82 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 2.88 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.65 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 3.00 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.94 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 2.20 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 4.86 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 2.16 1.91 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 35.31 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 47.72 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 65.59 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 84.21 100.00 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 4.69 2.95 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 3.530 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 3.95 - WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 1.06 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 7.877 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 1.77 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 20.359 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.96 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 44.25 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.61 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 1.03 - WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 8.04 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 5.95 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 24.30 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.12 21.76 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» -14.27 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» -11.88 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
Show more