10.21 1.63
- 1.63 5.01 II D r a i n a g e13.17 6.44
0.15 6.29
12.49 III Earthworks 3.044.64 1.44
3.20 3.04
IV Pavement Widening Shoulders2.45 -
V Granular Pavement11.27 5.68
1.36 7.04
7.44 VI Asphalt Pavement 55.817.61 1.18
8.79 29.07
VII S t r u c t u r e s 0.802.31 0.01
2.32 0.80
VIII Reinstatement Minor Works2.27 0.19
- 0.19 0.14 IX Day Work 0.220.10 -
0.10 0.13
X Routine Maintenance Works0.76 0.51
0.04 0.55
0.55 TOTAL
100.00 29.111.00 30.11
58.67 Note : Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original 0.26 1.00 1.67 2.45 4.78 7.45 10.70 14.27 21.53 30.10 36.95 44.01 51.62 58.67 65.63 73.03 79.97 87.04 91.61 93.19 94.30 95.76 97.82 100.00 Actual Progress 0.24 0.48 2.07 2.43 2.87 5.45 5.70 7.01 12.43 14.45 19.30 24.38 29.11 30.11 Balance 0.02 0.52 0.40 0.02 1.91 2.00 5.00 7.26 9.10 15.65 17.65 19.63 22.51 28.56 0.24 1.59 0.36 0.44 2.58 0.25 1.31 5.42 2.02 4.85 5.08 4.73 1.00 in several days due to misinterpretation of regulation - Field Eng Technical justification of variant order PHYSICAL PROGRESS MONITORING TABLE 143,688,963,000.00 not finilzed yet PHYSICAL WORK PROGRESS BY CATEGORY Div Description RENARDET S.A JV - Insuffisient supply of agregate for base course Need additional dumptruck DISBURSEMENT 6-Jan-14 asphalt concrete 5-Jan-16 - Shortage of labor for drainage work Need additional team work Need additional dumptruck EXECUTIVE SUMMARY REPORT Feb- 15 PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS 2014 2015 31-Dec-14 33,493,661,044.00 03 TI M E February 25, 2015 MANGGOPOH - PADANG SAWAH MAJOR PROBLEMS ACTION TO BE TAKEN - Contractors basecamp was closed by loccal gov. AM OU NT - AMP often broken Need improvement of equipment management 10 20 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 PH YS IC AL P RO GR ES THE MONTH OF TIME FOR COMPLATION PROGRESS SCHEDULE PACKAGE 03 Schedule Actual EXECUTIVE SUMMARY REPORT Feb 2015_2230FF.xlsx ExSum P-3Parts
» WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Current Implementation Situation Civil Works
» Disbursement WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» World Bank Implementation Review Mission and Site Visit
» Package 17 Sp. Gunung Kemala Pugung Tampak AWP-3.
» Package 11 Bantal Mukomuko AWP-2
» Package 13 Sp. Rukis Tj. Kemuning AWP-2
» Packages 5 Simpang Rampa Poriaha AWP-2
» Package No. 6 Pasar Pedati Kerkap AWP-2
» Package No.19 Lais Bintunan AWP-3 Package No.15 Sibolga Batas Tapsel AWP-3
» Technical Assistance for Capacity Building for Disaster Risk Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» CTC Consultants WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» DSC Consultants WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 21.04 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 44.25 30.11 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» - 33.85 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» External Monitoring Report SatkerPPK to BLH for Implementation of
» Monitoring Report of the LARAP Package No. 2 Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7 Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No. 15 : Sibolga Bts. Tapsel
» Monitoring Report of the LARAP Package No.16
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Issues WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Road Safety Audit WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» Letter Database System, used to record all information of incoming and
» Document Library System, used to record all information of document and
» World Bank and GOI Compliance
» Implementation Support Components WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Environmental and Social Impact Issues
» System Design Management Information System
» Project Risks and Mitigation Measures
» 0.29 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 1.82 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 2.88 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.65 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 3.00 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.94 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 2.20 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 4.86 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 2.16 1.91 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 35.31 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 47.72 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 65.59 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 84.21 100.00 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 4.69 2.95 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 3.530 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 3.95 - WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 1.06 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 7.877 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 1.77 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 20.359 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.96 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 44.25 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.61 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 1.03 - WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 8.04 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 5.95 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 24.30 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» 0.12 21.76 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» -14.27 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
» -11.88 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
Show more