Package No. 6 Pasar Pedati Kerkap AWP-2
Western I ndonesia National Roads I mprovement Project 1-7
There were nine 9 applicant bidder ; seven 7 sole entity and two 2 joint venture contractors who submitted bids.
Following are Contractor bidders who submitted their bids with their respective bid prices as read out during the opening :
• PT. Bangun Cipta Kontraktor
: Rp. 303,596,654,817 •
PT. Yasa Patria Perkasa PT. Conbloc Infratecno, JO : Rp. 305,575,900,000
• PT. Mawatindo Road Construction
: Rp. 340,675,157,000 •
PT. Adhi Karya Persero, Tbk : Rp. 291,500,000,000
• PT. Pembangunan Perumahan Persero
: Rp. 260,100,000,000 •
PT. Multi Structure : Rp. 265,804,568,624
• PT. Hutama Karya Persero
: Rp. 350,486,000,000 •
PT. Waskita Karya Persero : Rp. 291.446.247.000
• PT. Nindya Karya Jaya Konstruksi, JO
: Rp. 272,000,000,000 The 1
st
lowest is offered by PT. Pembangunan Perumahan Persero in the amount of Rp.260,100,000,000 which is 28.61 below the approved Owner s Estimated of
Rp.364,330,559,000 and the 2
nd
lowest tender is submitted by PT. Multi Structure with the amount of Rp.265,804,568,624 or 27.04 lower than the Owner s Estimate.
Bid Evaluation Reports BER is on going preparation by POKJA and the Report is expected to be finalized on March 17, 2015.
Procurement of Other Civil Work Contract Package The present status of other Contract Packages which are scheduled to be put on tender soon
are as follow :
-
Package No.7 Indrapura Tapan AWP-2
-
Package No.8 Bts. Kota Pariaman Manggopoh AWP-2
-
Package No.10 Sp. Empat Sp. Air Balam AWP-2
-
Package No.12 Kambang Indrapura AWP-2 Associated bidding documents are under preparation and finalization by the Design
Supervision Consultant DSC. Detailed Engineering Design DED drawings and Engineer s Estimates of the four 4 sub-
projects are under final revision by incorporating Bank s final comments based on February 10, 2015 letter..
As of this writing, the Revised Drawings and Engineer s Estimate are still to be completed for resubmission to the World Bank for issuance of No Objection Letter NOL.
Status of the last four 4 remaining contract packages which are scheduled for procurement during the last half of the Year 2015 are as follows :
-
Package No.14 Painan - Kambang AWP-3
-
Package No.16 Seblat - Ipuh AWP-3
-
Package No.20 Lubuk Alung - Sicincin AWP-3
-
Package No.21 Lubuk Alung - Kuraitaji AWP-3
Western I ndonesia National Roads I mprovement Project 1-8
Detailed Engineering Design drawings and associated bidding documents are under finalization and review BALAI II Padang.
1.5
Procurement of Three 3 Consultancy Packages Under Category 3 of the Loan Agreement, Part 3: Road Sector Institutional Development