-14.27 WINRIP DOC MPR CTC MPR No.26 2015 02 2015 02 11 00224.
Appendix B. Road Safety Audit Progresss Feb 2015
Old 2004 New 2009
Site Visiting Submission of
Report Site Visiting
Presentation Discussion
Submission of Report
1. No Road Safety Audit at Design Stage. No
2. Road Safety Engineering Review by CTC 3. Monitoring of Traffic Management Safety by CTC
Date
13-Nov-14 29-Dec-14
13-Nov-14 29-Dec-14
1. No Road Safety Audit at Design Stage. No
2. Road Safety Engineering Review by CTC 3. Monitoring of Traffic Management Safety by CTC
Date
9-Oct-14 1. No Road Safety Audit at Design Stage.
No 2. Road Safety Engineering Review by CTC
3. Monitoring of Traffic Management Safety by CTC
Date
9-Oct-14 1. No Road Safety Audit at Design Stage.
No 2. Road Safety Engineering Review by CTC
3. Monitoring of Traffic Management Safety by CTC
Date
13-Nov-14 29-Dec-14
Date
08-May-13 04-Apr-13
01-May-13 15-Jul-13
17-Sep-13
Date
18-Jul-13 18-Sep-13
17-Sep-13 1. Technical Advisory Report by CTC, Sept 2013
24-Oct-13 27-Sep-13
2. Road Safety Audit by Dit. EA RS, May 2014 3. Result of Highway and RSA Final Review by CTC, Nov 2014
Date
1. Technical Advisory Report by CTC, Sept 2013 24-Oct-13
27-Sep-13 2. Road Safety Audit by Dit. EA RS, May 2014
3. Result of Highway and RSA Final Review by CTC, Nov 2014
Date
1. Technical Advisory Report by CTC, Sept 2013 24-Oct-13
27-Sep-13 2. Road Safety Audit by Dit. EA RS, May 2014
3. Result of Highway and RSA Final Review by CTC, Nov 2014
Date Date
18-Jul-13 18-Sep-13
18-Jul-13 1. Technical Advisory Report by CTC, Sept 2013
24-Oct-13 27-Sep-13
2. Road Safety Audit by Dit. EA RS, May 2014 3. Result of Highway and RSA Final Review by CTC, Nov 2014
Date Date
18-Jul-13 18-Sep-13
18-Jul-13
Date Date
08-May-13 21-Aug-13
04-Apr-13 01-May-13
23-Sep-13
Date
14-Aug-14 1-Sep-14
Date Date
18-Jul-13 18-Sep-13
17-Sep-13
Date Date
7 65,788
Process
Detailed Engineering Design has not finished 7
54,557
Process
19 Lais - Bintuan
13.009.1 13.007.0
10.80 Detailed Engineering Design has not finished
21 Lubuk Alung - Kuraitaji
06.027.0 06.025.0
16.80 7
35,886
Process
50 Technical Review
by CTC
20 Lubuk Alung – Sicincin
06.009.1 06.041.0
14.60
13.010.0 13.004.0
34.50 6
110,237
Process
Technical Review RSA by CTC
17 Sp.Gng Kemala–Pg.Tampak
17.061.1 17.025.0
36.80 6
255,269
Process
No Road Safety Audit at Design Stage
Processed by Project Preparation Consultant
Technical Review by CTC
WP-3 14
Painan – Kambang 06.017.1
06.032.0 31.50
7 118,993
Process
Detailed Engineering Design has not finished
15 Sibolga – Bts TapSel
03.016.1 03.044.0
35.86 7
376,479
Process
50 Technical Review RSA
by CTC
16 Seblat – Ipuh
13 SP.Rukis - TJ.Kemuning
13.006.0 13.021.0
56.30 7
316,304.8
Process
50 Technical Review
by CTC
12 Kambang – Indrapura