Monthly Progress Report July 2014
Western I ndonesia National Roads I mprovement Project 56
6.5 Road Safety Audit
6.5.1 Activities During This Month July 2014
There are two activities during this month, i.e: 1. Desk study for Road Safety Audit at detailed design stage for Package 16 Seblat Ipuh,
2. Site Visit to Sibolga for preliminary and reconnaissance survey of the new package replacement road. The two roads that have been visited are : i Sibolga
Padang Sidempuan, and ; ii Sibolga Barus. The two road that has to be replaced are : i Package 18 Mukomuko Batas Sumbar, and;
ii Package 9 Rantau Tijang Kota Agung.
6.5.2 Current status of the project for technical field as of July 2014.
The Details of Progress of Technical Design Review and Road Safety Audit as of the end of July 2014
is as shown in the tabulated format and included as Appendix B.
Technical Design Review Road Safety Audit Report Status
Group Pack
No. Name of Sub-project
Technical Design Review Road Safety Audit Road Safety Audit
Report By BINTEK
Submitted to PMU
Post -Review
Site Visting
Full -Review
Technical Report
AWP -2
5 Sp.Rampa
Poriaha Link No.015.xx
completed completed completed completed
- Final Technical Report is resubmitted
on 17th September 2013 6
PS.Pedati - Kerkap Link No.010.0
completed completed completed completed
- Final Technical Report is submitted
on 17th September 2013 7
Indrapura Tapan
Link No.019.0 -
By DSC -
By DSC -
By DSC Technical
Advisory Reviewed and
prepared by Sub Directorate of EA RS
• Final
Technical Advisory
is submitted on 5th February 2013
• Final RSA Report is submitted on
May 2014 8
Bts.Pariaman Manggopoh
Link No.024.0 -
By DSC -
By DSC -
By DSC Technical
Advisory Reviewed and
prepared by Sub Directorate of EA RS
• Final
Technical Advisory
is submitted on 5th February 2013
• Final RSA Report is submitted on
May 2014 9
Rantau Tijang Kota
Agung Link No.026.1
By DSC By DSC
By DSC -
- -
10 Sp.Empat Sp. Air
Balam Link No.034.1
- By DSC
- By DSC
- By DSC
Technical Advisory
Reviewed and prepared by Sub
Directorate of EA RS •
Final Technical
Advisory is
submitted on 5th February 2013 •
Final RSA Report is submitted on May 2014
11 Bantal - Mukomuko
Link No.015.2 completed completed completed
completed -
Final Technical Report is resubmitted on 16th August 2013
12 Kambang
Indrapura Link No.017.2
- By DSC
- By DSC
- By DSC
Technical Advisory
Reviewed and prepared by Sub
Directorate of EA RS •
Final Technical
Advisory is
submitted on 5th February 2013 •
Final RSA Report is submitted on May 2014
13 SP.Rukis - TJ.Kemuning
Link No.006.0 completed completed completed
completed -
Final Technical Report is resubmitted on 16th August 2013
AWP -3
14 Painan
Kambang Link No.017.1
By DSC By DSC
By DSC Technical
Advisory -
Final Technical Advisory is submitted on 28 May 2014
15 Sibolga
Bts TapSel Link No.016.1
completed completed completed completed
- Final Technical Report is submitted
on 23th September 2013 16
Seblat Ipuh
Link No.010.0 -
By DSC -
By DSC -
By DSC Technical
Advisory -
DSC resubmitted to CTC Drawings on June 25, 2014 for further review.
17 Sp.Gng Kemala
Pg.Tampak Link No.061.1
PPC-TA WINRIP
PPC-TA WINRIP
PPC-TA WINRIP
- -
-