Package No.19: Lais - Bintunan Package No.20: Lubuk Alung
Monthly Progress Report July 2014
Western I ndonesia National Roads I mprovement Project 63
• Quarterly reports of FMR Financial Monitoring Report
• The MPR Monthly Progress Report of Field Supervision Team.
2 Objectives
• Knowing the financial progress that always be updated every date of 25th of each
month after the MC Monthly Certificate document that signed by the PPK, Supervision Consultants and Contractors.
• Knowing the physical work progress status of each WINRIP package in the form of
the S-curve. •
As a recapitulation database to record the history of financial absorption. •
As an indicators to monitor and audit the physical work progress of each WINRIP package.
3 System Development Methodology
SYSTEM ASSESSMENT
C O
M P
LA IN
T T
Y P
E , S
T R
U C
T U
R E
S A
N D
S Y
S T
E M
R E
Q U
IR E
M E
N T
S SYSTEM
ANALYSIS NEEDS
ANALYSIS PROCESS
ANALYSIS DATABASE
ANALYSIS MODULE
ANALYSIS SYSTEM
DESIGN INTERFACE
DESIGN FLOW CHART
DESIGN DATABASE
DESIGN SYSTEM
ARCHITECTURE C
O D
E P
R O
G R
A M
M IN
G A
N D
T E
S T
IN G
S Y
S T
E M
IM P
LE M
E N
T A
T IO
N FINALIZATION
4 System Assessment
Information system and monitoring of financial progress and physical work progress are described through the following scheme.
Monthly Progress Report July 2014
Western I ndonesia National Roads I mprovement Project 64
Explanation: •
Fetching data from SIPP application by filtering the data with sorting and retrieving data of financial progress and physical work progress that only for the WINRIP
packages. •
Then added with data from quarterly reports the IFR and monthly reports the MPRfrom the Field Supervision Team.
• All data from the 3 sources of data are then inputing into a database of the FMIS
application. •
The combined data from all data sources have outputs of complete information and according to the needs of the project monitoring activities.
5 System Analysis
1. Needs Analysis
NO. NEEDS
RECOMMENDATION
1. Inputting
the new
project information Need to create a menu to inputting the data for
new project information.
2. Create categories
of projects progress.
Setting up a facility to add and manage the categories of projects progress.
3. Change the existing of
information of projects progress.
Provides a menu to change the existing of information of projects progress.
4. Delete the existing of
information of projects progress.
Provides a menu to delete the existing of information of projects progress.