Background WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
Parts
» WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Current Implementation Situation Civil Works
» Disbursement Loan Allocation and Percent Disbursement To Date
» Visit WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Procurement WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Brief Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Project Development WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Procurements WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Quality Assurance WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety aspects and Monitoring of Environmental Studies
» Monitoring Report of the Larap for Padang Sawah – Sp. Empat
» Monitoring Report of the LARAP for Manggopoh – Padang Sawah
» Monitoring Report of the LARAP for Ipuh – Bantal
» Monitoring Report of the LARAP for Sp. GunungKemala – PugungTampak
» Report of LARAP for Sp. Rampa - Poriaha
» Report of Five Larap in Bengkulu
» Report of LARAP for Sibolga – BtsTapsel
» Report of Three 3 LARAPS in West Sumatera
» Report of Four 4 LARAPS in West Sumatera
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues .1 Anti‐Corruption Action Plan ACAP
» Complaints Handling Mechanism CHS Third Party Monitoring TPM
» Road Safety Audit Draw‐Downs and Future Costs
» Database Management Information System 1. General Overview
» Financial Management Information System FMIS
» Website Management Information System 1. General Overview
» World Bank Missions Performance Indicators
» Design and Supervision Consultant DSC
» Road Sector Institutional Development
» Training and Workshop on Anti Corruption and Environmental Mitigations :
» Annual Training Program Training
» Anti-Corruption Action Plan ACAP
» Third Party Monitoring TPM Complaint Handling System CHS
» Publication Disclosures Anti‐Corruption Issues
» Problem and Solutions Anti‐Corruption Issues
» No activity done during this month
» Current status of the project for technical field as of 31 April 2014.
» Package No.02: Padang Sawah – SimpangEmpat
» Package No.03: Manggopoh – Padang Sawah Package No.04: Ipuh – Bantal
» Package No.05: Sp. Rampa – Poriaha
» Package No.06: Psr.Pedati – Kerkap
» Package No.07: Indrapura – Tapan
» Package No.08: Bts Kota Pariaman – Manggopoh
» Package No.09: Rantau Tijang – Kota Agung
» Package No.10: Sp. Empat – Air Balam Social Issues:
» Package No.11: Bantal - Mukomuko Social Issues:
» Package No12: Kambang – Indrapura Social Issues:
» Package No.13: Sp. Rukis – Tj. Kemuning Social Issues:
» Package No.14: Painan – Kambang Social Issues:
» Package No.15: Sibolga – Bts. Tapsel Social Issues:
» Package No.18: Mukomuko – Bts. Sumbar Social Issues:
» Package No.21: Lubuk Alung – Kuraitaji Social Issues:
» Disbursement Management Information System
» List of data to be searched Here is a list of data that needed to upload into the WINRIP website.
Show more